Engineering Services for Improvements to Water System
Open State & local contract opportunity Posted
- Solicitation number
- 004-2026
- State
- North Carolina
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Garrett Gilbert garrett@clevelandcountywater.com
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The District is seeking a firm for design engineering and project management consulting on the Lawndale Water System Improvements Project, with proposals due November 25, 2026. Listed jurisdictions are Chatham County and Charlotte City, North Carolina.
Required expertise covers quality assurance and value engineering, construction feasibility review, cost estimating, and scheduling. The project includes about 3,500 linear feet of new water supply line from the CCW's system to the Town's distribution system to add redundancy and fire service capacity. It also includes replacing about 650 linear feet of existing 4-inch line with 6-inch line to create a loop, replacing aged, inaccurate meters with automated-read meters, and replacing public-side service lines that are flexible black plastic and cracked. A water line suspended from the NC-182 bridge will be replaced by directional drilling under the First Broad River with adequate surface cover.
Opportunity text
The District is seeking a firm with demonstrated expertise in design engineering and project management consulting with specific expertise in quality assurance/value engineering, construction feasibility review, cost estimating and scheduling. The proposed project includes approximately 3,500 LF of new water supply line from CCWs system to the Towns distribution system. The new line will provide much needed redundancy to the system and sufficient capacity for fire service. Replacement of approximately 650 LF of existing 4 inch line with new 6-inch water line to create a loop and improve fire protection in the area. Replacement of aged water meters that are aged and often inaccurate with new automated read meters to improve billing and reduce water loss, and replacement of the public side of service lines that are currently flexible black plastic and cracked/brittle. Replacement of a water line that is currently suspended from a bridge on NC-182, and a major vulnerability due to the poor condition of the bridge as well as susceptibility of damage to the line during flooding events. The proposed project includes replacement of this line with directional drilling under the First Broad river with adequate surface cover to protect the line against flooding events or further damage to the bridge.
Files
| File | Type | Posted |
|---|---|---|
| Engineering Services for Lawndale Water System Improvements Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity