Effluent Discharge System Pipeline – Pump Station – Sprayfield 2

Open State & local contract opportunity Posted

Solicitation number
2026.16
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Milton, Florida is soliciting sealed bids under ITB No. 2026.16 for construction of an effluent discharge system in Santa Rosa County, with a mandatory pre-bid conference on November 19, 2026 and bids due December 17, 2026. Local-vendor preference is prohibited on Contract 2, which is funded by a 2026 Florida Legislative Appropriation managed by the Florida Department of Environmental Protection, while Contracts 3 and 4 may be eligible for local-vendor preference consideration. Minimum qualifications act as the primary filter: bidders must be legally authorized to conduct business in Florida, hold a current active contractor license, complete at least three similar projects within the past five years with contract values of at least $10 million each, provide three references, and possess bonding capacity.

Scope covers three segments: approximately 35,430 linear feet of 20-inch SDR 26 PVC effluent pipeline with gate valves, air relief valves, and fittings connecting the Downtown Plant Pump Station to the Effluent Pump Station; an effluent pump station with a pre-cast concrete building, triplex pumping station, 7.5-million-gallon wet-lined wet-weather storage pond, splitter box, yard piping, fencing, and electrical components; and Sprayfield Site 2 piping, valves, and sprinkler assemblies. The work is issued on a unit price basis, with payment based on actual quantities accepted by the City. Bidders must submit a bid bond equal to five percent of the total bid, and the successful bidder must furnish performance and payment bonds at 100 percent of the contract price under Florida Statutes Section 255.05. Comprehensive insurance is required, including Commercial General Liability, Automobile Liability, Workers' Compensation, Umbrella Liability, Builders Risk, and Contractors' Pollution Insurance where applicable.

Substantial completion is required within 510 calendar days and final completion within 570 calendar days after Notice to Proceed, with liquidated damages of $2,700 per calendar day for delays. The mandatory site visit follows the November 19 conference at 10:00 a.m. CST. Written questions are due December 3, 2026 at 2:00 p.m. CST, with answers posted by December 10, 2026. Bids are due December 17, 2026 at 10:00 a.m. CST at Milton City Hall.

Opportunity text

The City is soliciting sealed bids from qualified and properly licensed contractors to furnish all labor, materials, equipment, supervision, and services necessary to construct the project described in the Contract Documents (the Project). The Project contains 3 separate segments: Effluent Pipeline, consisting of approximately 35,430 linear feet of 20-inch SDR 26, PVC Pipe, gate valves, air relief valves, tees and fittings for a complete and operational system connecting flow from the Downtown Plant Pump Station to the Effluent Pump Station. Effluent Pump Station, consisting of a pre-cast fabricated concrete building, a triplex pumping station, a 7.5 million gallon wet lined wetweather storage pond, splitter box, yard piping, fencing, valves and fittings, electrical components, conduit, and wiring system for a complete and operational effluent pump station. Sprayfield Site 2, consisting of piping, fittings, valves and sprinkler assemblies and all appurtenances for a complete and operational system.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors