ECEP Cooling Tower Basin Improvements

Open State & local contract opportunity Posted

Solicitation number
ITB-17067
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from vendor.myfloridamarketplace.com. Updated .

About this opportunity

The Central Florida Tourism Oversight District (CFTOD), a special taxing district in Orange County, Florida, is requesting bids on cooling tower basin improvements at the EPCOT Energy Plant under ITB #C008159, with bids due October 26, 2026 and a mandatory pre-bid meeting on October 6 at 10:30 a.m. at the facility (RSVP required by October 5 at noon).

The scope encompasses eight work packages: installation of three sluice gates at existing basin openings between cooling tower cells 3 and 4; a 24-inch CWR bypass pipe connecting north and south side headers; butterfly valves at header connections; replacement of pneumatic actuators with electric actuators on cooling tower inlet valves for Cooling Towers 1, 2, and 3; replacement of butterfly valve and pneumatic actuator with electric actuator for Cooling Tower 4 inlet; isolation butterfly valves at three specified locations in the main condenser water header; solenoid valves at chemical treatment discharge pipes for each basin; and control modifications for operation of all new and modified valves and gates. Work is performed at the EPCOT Energy Plant, 751 Backstage Lane, Lake Buena Vista, Florida.

The CFTOD offers bid preferences for local vendors, veteran small businesses, and opportunity zone businesses on most solicitations; qualification for this ITB is not explicitly confirmed in the source. Bidders must register through PlanetBids to obtain supporting documents, submit questions, and submit bids electronically. Pre-bid attendees must wear closed-toed shoes and pants. Contact: Sara Medina, Procurement Analyst, (689) 246-5346, or www.oversightdistrict.org.

Estimated contract value, contract term, and evaluation criteria are not stated in the source.

Opportunity text

The scope of work for ECEP Cooling Tower Basin Improvements includes, but is not limited to:

A. Provide and Install sluice gates at (3) existing basin openings in between cooling tower cells 3 and 4

B. Provide and Install a 24" CWR bypass pipe between the north side header to the south side header

C. Provide and Install butterfly valves at the connection to the existing north header and at the connection to the existing south header

D. Replace the pneumatic actuators with electric actuators on the existing cooling tower inlet valves for Cooling Towers 1,2, and 3

E. Replace the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for Cooling Tower 4

F. Provide and install isolation butterfly valves in the main condenser water header between the takeoffs for CT-1 and CT-2, between the takeoffs for CT-2 and CT-3, and between the takeoffs for CT-3 and CT-4

G. Provide and install solenoid valves at the chemical treatment discharge pipes for each cooling tower basin

H. Provide control modifications for operation of the sluice gates, tower isolation valves, header isolation valves, and chemical treatment discharge valves

You must be a registered bidder through PlanetBids™ to obtain the supporting attachments to this project. BID LINK HERE: https://vendors.planetbids.com/portal/62171/bo/bo-detail/146496

Files

File Type Posted
C007159 MFMP Bid Flyer.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity