Eastern WWTP Reuse Pump Station Upgrades

Closed State & local contract opportunity Posted

Solicitation number
ITB-#004-25-0-2025/TJ
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from network.demandstar.com. Updated .

About this opportunity

The state and local contract opportunity for the Eastern WWTP Reuse Pump Station Upgrades is a procurement initiative by Lake County, Florida, focused on critical wastewater infrastructure enhancement. The project specifically involves the installation of an additional vertical can turbine high service pump within an existing pump station, with comprehensive integration requirements. The procurement entails installing the new pump into the current piping manifold, connecting it to the existing electrical panel using appropriate electrical cables, and integrating the pump into the current SCADA (Supervisory Control and Data Acquisition) system. Contractors will be required to tie the new pump into the discharge piping at an existing isolation valve, ensuring seamless operational compatibility. The solicitation was posted on August 22, 2025, with proposals due by September 25, 2025, providing potential bidders approximately one month to prepare and submit comprehensive technical and operational responses. Successful vendors must demonstrate expertise in municipal wastewater infrastructure, electrical systems integration, and SCADA technology implementation.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard municipal infrastructure upgrade without immediately apparent restrictions on vendor participation. The existing infrastructure suggests compatibility requirements with current pump station electrical systems and SCADA platforms, which will necessitate careful technical integration. Potential bidders should possess specialized experience in municipal wastewater pump station upgrades, electrical system modifications, and industrial control system integration. Although a precise budget range is not specified, similar municipal infrastructure projects typically range from $250,000 to $750,000, depending on complexity and specific technical requirements. The project represents a strategic investment in Lake County's water infrastructure, aimed at enhancing operational efficiency and capacity of the Eastern Wastewater Treatment Plant's reuse pump station.

Opportunity text

Eastern WWTP Reuse Pump Project includes the tnstallation of one additional vertical can turbine high service pump into the existing can and tie into the existing piping manifold. The pump will be designed to tie into the discharge piping at the existing isolation valve. The installation of the pump will include connecting the new pump to the existing electrical panel including electrical cables, and any additional material. The additional pump will be integrated through SCADA with the existing SCADA panel, conduits, etc.