The City of Cleveland's Mayor's Office of Capital Projects, Division of Engineering and Construction is requesting proposals for professional design services to prepare construction contract plans and specifications for the E. 55th Street Safe Routes to School Quick Build project covering approximately 2.8 miles from Outhwaite Avenue to North Marginal Road, with proposals due July 29, 2026 at noon and questions due July 15, 2026 at 4:00 p.m. The 0.3-mile segment between Superior Avenue and St. Clair Avenue (State Route 283) is excluded from this scope and is being handled under a separate project led by ODOT District 12.

The scope includes preparing plans and specifications for a quick-build roadway cross-section reallocation project: removing existing pavement markings, installing separated bicycle facilities with delineator posts and new markings, ensuring ADA accessibility for transit waiting environments, upgrading select pedestrian crossings, and adding new crosswalks and curb ramps. No pavement rehabilitation is included. The project will reallocate existing curb-to-curb space to add a two-way center turn lane and separated bike lanes on both sides of the road. The City will administer the design phase; ODOT District 12 will lead construction administration.

A 10% Cleveland Small Business (CSB) mandatory participation goal applies. Proposers must complete Office of Equal Opportunity Schedules 1–4 demonstrating good-faith efforts to utilize certified CSB, MBE, and FBE subconsultants. All subconsultants claiming CSB, MBE, or FBE status must be pre-certified through the City's Certification and Compliance Monitoring System. Consultant team members must be ODOT prequalified in Non-Complex Roadway Design, Basic Traffic Signal Design, and Bicycle Facilities and Enhancement Design.

Design work must be completed within nine months from notice to proceed (August 6, 2026) through April 2027, with construction administration lasting approximately six months. Total agreement duration is August 2026 through September 2027. Compensation is based on Actual Cost Plus Net Fee with an upset maximum or Lump Sum Fee, with the consultant providing detailed fee breakdowns including hours, rates, and overhead percentages. Funding is provided through ODOT Safe Routes to School program funds combined with local funds. Phase 1 evaluation assesses management approach (20 points), technical approach (30 points), CSB participation (10 points), firm experience (15 points), responsiveness (10 points), and personnel experience (15 points); Phase 2 evaluates fee on a pass/fail basis. An addendum with all questions and answers will be posted by July 22, 2026. No pre-proposal meeting is scheduled.

Opportunity text

2 versions

Update #2 · Latest ·

This Request for Proposal (RFP) seeks professional services to prepare construction contract plans and specifications for the Mayor's Office of Capital Projects, Division of Engineering and Construction. The project covers approximately 2.8 miles of E. 55th Street, from Outhwaite Avenue to North Marginal Road. Please note that the 0.3-mile segment between Superior Avenue and St. Clair Avenue - designated as State Route (SR) 283 - is excluded from this scope. E. 55th Street is classified as a Minor Arterial.
The scope of work focuses on delivering a quick-build roadway cross-section reallocation project. Key tasks include removing existing pavement markings and installing separated bicycle facilities with delineator posts and new markings. The project will ensure ADA accessibility for transit waiting environments, include upgrades to select existing pedestrian crossings, and add new crosswalks and curb ramps at select locations. No pavement rehabilitation is included in this scope. The segment within SR 283 (Superior Avenue to St. Clair Avenue) is being rehabilitated under a separate project. As a Safe Routes to School project, the City will administer the design, while ODOT District 12 will lead construction administration.
There will be no pre-proposal meeting. Written questions will be received until July 15, 2026, at 4:00 p.m., and an addendum with all questions and answers will be posted by the close of business on July 30, 2026. The proposal will be due on August 6, 2026, by noon. Questions shall be submitted online through the questions tab included in this proposal request.
Where the following terms such as "Consultant to determine", "Yes", "x", "By Consultant" and similar notations are used in this RFP, the Consultant shall design and prepare the necessary drawings and details for that item of work. Design work may not be passed on to the construction contractor via plan note. In addition, where there are items that require the action of work (by whom it may not be clear), the Consultant is the party that shall accomplish it.
The City reserves the right to reject any or all proposals or portions of them, to waive irregularities, informalities, and technicalities, to re-issue or to proceed to obtain the service(s) desired otherwise, at any time or in any manner considered in the City's best interests. The Director may, at his/her sole discretion, modify or amend any provision of this notice or the RFP.

Update #1 ·

This Request for Proposal (RFP) seeks professional services to prepare construction contract plans and specifications for the Mayor's Office of Capital Projects, Division of Engineering and Construction. The project covers approximately 2.8 miles of E. 55th Street, from Outhwaite Avenue to North Marginal Road. Please note that the 0.3-mile segment between Superior Avenue and St. Clair Avenue - designated as State Route (SR) 283 - is excluded from this scope. E. 55th Street is classified as a Minor Arterial.
The scope of work focuses on delivering a quick-build roadway cross-section reallocation project. Key tasks include removing existing pavement markings and installing separated bicycle facilities with delineator posts and new markings. The project will ensure ADA accessibility for transit waiting environments, include upgrades to select existing pedestrian crossings, and add new crosswalks and curb ramps at select locations. No pavement rehabilitation is included in this scope. The segment within SR 283 (Superior Avenue to St. Clair Avenue) is being rehabilitated under a separate project. As a Safe Routes to School project, the City will administer the design, while ODOT District 12 will lead construction administration.
There will be no pre-proposal meeting. Written questions will be received until July 15, 2026, at 4:00 p.m., and an addendum with all questions and answers will be posted by the close of business on July 22, 2026. The proposal will be due on July 29, 2026, by noon. Questions shall be submitted online through the questions tab included in this proposal request.
Where the following terms such as "Consultant to determine", "Yes", "x", "By Consultant" and similar notations are used in this RFP, the Consultant shall design and prepare the necessary drawings and details for that item of work. Design work may not be passed on to the construction contractor via plan note. In addition, where there are items that require the action of work (by whom it may not be clear), the Consultant is the party that shall accomplish it.
The City reserves the right to reject any or all proposals or portions of them, to waive irregularities, informalities, and technicalities, to re-issue or to proceed to obtain the service(s) desired otherwise, at any time or in any manner considered in the City's best interests. The Director may, at his/her sole discretion, modify or amend any provision of this notice or the RFP.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors