DFW-2026-085 mill brook bogs wetland restoration project - phase II
Closed State & local contract opportunity Posted
- Solicitation number
- BD-26-1046-DFW-FW104-126787
- State
- Massachusetts
- Responses due
Opportunity facts
- NIGP code
- UNSPSC code
- Point of contact
-
- Lori Cookman lori.cookman@state.ma.us (508) 389-6300
Opportunity details come from commbuys.com. Updated .
About this opportunity
The Massachusetts Department of Fish and Wildlife is procuring wetland restoration services for the Mill Brook Bogs Wetland Restoration Project Phase II under contract number DFW-2026-085. This competitive procurement seeks qualified contractors to execute comprehensive ecosystem restoration work at the Mill Brook Bogs Wildlife Management Area, including removal of man-made dikes, berms, and water control structures; excavation of approximately six inches of sand layer from the bog surface; filling of existing bog ditches; roughening and uncompacting of the bog surface; and installation of woody debris and rock features, along with associated miscellaneous work. The primary objective is to restore natural hydrological and ecological conditions to the bog ecosystem through systematic deconstruction of artificial water management infrastructure and surface rehabilitation. Contractors must demonstrate capability in wetland restoration, environmental compliance, erosion control, and protection of adjacent wetland resources during construction activities. The solicitation was posted on March 18, 2026, with a proposal due date of April 2, 2026, allowing potential bidders approximately two weeks to prepare and submit responses. Detailed technical specifications, construction requirements, and project management guidelines are provided in the accompanying project plans document (50MB) and comprehensive project manual (82MB), which serve as the primary references for bid preparation and project execution.
The available documentation does not specify set-aside designations, restrictions on responding organizations, disadvantaged enterprise requirements, incumbent vendors, or award values and budget ranges for this procurement. Interested contractors should consult the complete solicitation documents and related bid specifications for information regarding any small business set-asides, minority-owned or women-owned enterprise preferences, bonding requirements, insurance specifications, and detailed compensation structures. Contractors are advised to review both the technical plans and project manual in their entirety to understand all environmental compliance obligations, quality assurance procedures, and performance standards required for successful project completion.
Opportunity text
This project is located at the Mill Brook Bogs WMA and consists of removal of man-made dikes, berms, and water control structures, approximately 6 inches of the sand layer on the bog surface, filling of bog ditches, roughening and uncompacting of the bog surface, installation of woody debris and rock features, and miscellaneous work.