2026-03-27_Addendum No. 1.pdf

PDF 123 KB Posted

Attached to
DFW-2026-085 MILL BROOK BOGS WETLAND RESTORATION PROJECT - PHASE II
Solicitation number
BD-26-1046-DFW-FW104-126787
Issued by
Massachusetts

About this file

This is Addendum No. 1 to the bid package for the Mill Brook Bogs Wetland Restoration Project – Phase II, issued by SLR International Corporation on behalf of the Massachusetts Department of Fish and Wildlife (DFW-2026-085). The addendum addresses five key bidder questions regarding material specifications and project responsibilities. The clarifications confirm that Prefabricated Pedestrian Bridge #1 shall be constructed of weathering steel per specifications; timber for Pedestrian Bridge #2 and wetland crossings shall be pressure-treated pine or douglas fir; steel beams for Pedestrian Bridge #2 shall conform to ASTM A-572 Grade 50; wildlife and reptile management shall be handled by MassWildlife at no cost to the contractor; and the Funding Authority shall be listed as USFWS/NRCS. These modifications supersede all previous bid package documentation and represent critical clarifications for contractors preparing responses to this wetland restoration procurement.

The addendum does not address pricing terms, set-asides, incumbent information, or funding source details. However, it establishes that MassWildlife coordination is a mandatory contractor responsibility, requiring the contractor to coordinate the agency's presence on site during critical construction activities to ensure wildlife protection and documentation compliance. The specifications reinforce the technical requirements for bridge and crossing materials, ensuring consistency with the project's engineering standards and long-term durability in the wetland environment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLR International Corporation

99 Realty Drive, Cheshire, Connecticut, 06410

ADDENDUM NO. 1

MILL BROOK BOGS WETLAND RESTORATION PROJECT – PHASE II

Freetown, Massachusetts

DFW-2026-085; SLR #2688-52

Addendum No. 1 Issued March 27, 2026

This Addendum No. 1 includes clarifications and modifications to the above-referenced bid package. Changes reflected herein shall supersede all previous bid package documentation.

A. RESPONSE TO BIDDER QUESTIONS

Q1. The construction drawings state that the prefabricated bridge (pedestrian bridge #1) shall be galvanized and painted, but the specs state weathering steel. Please confirm which is correct.

R1. Prefabricated Pedestrian Bridge #1 shall be weathering steel in accordance with specifications.

Q2. Could you provide details on the type of timber to be used for pedestrian bridge #2 and the wetland crossings?

R2. Timber shall be pressure-treated, either pine or douglas fir.

Q3. Could you provide additional details / specifications for the steel beams for pedestrian bridge #2?

R3. Steel beams shall conform to ASTM A-572 Grade 50.

Q4. Will all reptile and wildlife management be handled by MassWildlife at no expense to the contractor?

R4. Yes. The Contractor is responsible for coordinating with MassWildlife to ensure their presence on site during critical construction activities so they can protect wildlife and provide any required documentation.

Q5. Who are we to list as the "Funding Authority" as shown on Page 5-8 in the bid proposal??

R5. USFWS/NRCS