Develop Solid Waste Conversion Facility at the Atlantic County Utilities Authority

Open State & local contract opportunity Posted

Solicitation number
2026-RFQ-30
State
New Jersey
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Atlantic County Utilities Authority (ACUA) is requesting qualifications for the design, financing, permitting, construction, operation, and maintenance of a municipal solid waste conversion facility with a contract duration of up to 25 years and qualifications due December 9, 2026.

The facility must process up to 100% of the ACUA's municipal solid waste (216,911 tons annually in 2025), with capacity of up to 1,000 tons per day. Extra consideration is given to facilities that also process Type 13 bulky waste (28,084 tons in 2025), Type 13C construction and demolition waste (90,118 tons in 2025), vegetative waste, and wastewater biosolids (28,500 wet tons processed annually, plus 18,350 wet tons from customers). Eligible conversion technologies include advanced sorting, anaerobic digestion, pyrolysis, and hydrothermal decomposition; mass-burn incineration and land-application methods are excluded. The facility will be located at the Howard F. Haneman Environmental Park in Egg Harbor Township, New Jersey, using the existing Transfer Station and designated surrounding property.

Respondents must demonstrate a minimum of one year of satisfactory commercial operation of a municipal solid waste processing facility with at least 100 tons per day capacity. Financial criteria require a current assets-to-current-liabilities ratio of at least 1.1 for two of the three most recent fiscal years and the ability to obtain payment and performance bonds. Respondents must comply with New Jersey affirmative action provisions and Americans with Disabilities Act requirements.

The ACUA will provide the site, ingress/egress roadways, utility connections, scale house operations, and maintain flow control and continuous use enforcement. Payment is on a per-ton basis subject to escalation, commencing only after the facility passes specified permit standards. Questions are due November 5, 2026 at 12:00 p.m. Optional site visits may be arranged by contacting the Engineering/Research and Development Department at 609-272-6932.

Opportunity text

Project Scope The ACUA is seeking projects that can process up to 100% of the MSW received by the ACUA. The ACUA is also seeking technologies that can process some or all of the Type 13 (bulky) and Type 13C (Construction) Waste received on site. Extra consideration will be given to facilities that can process vegetative waste received as well as wastewater biosolids. For historical annual tonnage amounts by waste types see Attachments A. The project must include a form of waste conversion into energy and/or other reusable resources. The ACUA is seeking longterm waste conversion solutions, with a contract duration of up to 25 years. As stated in Section 2.4, all forms of conversion technology will be considered other than incineration or technologies that rely on land application. The proposer selected pursuant to this procurement will be responsible for designing, permitting, financing, constructing, operating and maintaining the project in accordance with all applicable laws. The solid waste conversion facility must be developed in compliance with all federal, state and local codes, permit requirements, and rules and regulations applicable to construction and operation of the type of solid waste facility selected. The New Jersey Administrative Code, Title 7, Chapter 26 (N.J.A.C. 7:26) governs processing and disposal of solid waste via the Solid Waste Facility Permit. In addition, specific facility features, such as air or water discharges, are regulated by the respective agencies within NJDEP