Design Overlay, Pavement Patching and Resurfacing Improvements

Closed State & local contract opportunity Posted

Solicitation number
62X33
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Illinois Department of Transportation (IDOT) is soliciting bids for design overlay, pavement patching, and resurfacing improvements on Illinois Route FAP 567 (IL 38) in the Village of Elburn, Kane County, with electronic bids due September 18, 2026 at 12:00 p.m. via the iCX system. A Project Labor Agreement applies to this contract, and DBE participation is required.

The project spans 6.70 miles (35,395 feet) beginning 260 feet east of the DeKalb County Line and ending 100 feet west of IL 47 (Main Street). Work includes hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface courses, placement of thermoplastic pavement markings, and all incidental and collateral work. The contract incorporates comprehensive specifications addressing hot-mix asphalt mixture design verification and production standards, quality control and quality assurance testing protocols, traffic control and protection procedures, detector loop replacement for traffic signals, environmental compliance including diesel retrofit requirements, and maintenance of roadways within construction limits. Public Convenience and Safety provisions include holiday closures. No utility relocations or conflicts requiring contractor action are identified.

The contract will be awarded to the lowest responsive and responsible bidder in accordance with IDOT's established rules and contract terms. IDOT reserves the right to reject any or all proposals, readvertise the project, and waive technicalities. The specifications incorporate the Department's standard specifications for road and bridge construction adopted January 1, 2022, and revised through January 1, 2026.

Opportunity text

This is a design overlay and the work to be performed under this contract consists of hot-mix asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder course and hot-mix asphalt surface course, placement of thermoplastic pavement markings and all incidental and collateral work necessary to complete the improvement as shown on the plans and as described herein. Location: This project located on Illinois Route FAP 567, IL 38, it begins 260 feet east of Dekalb County Line and ends at 100 feet west of IL 47 (Main Street). The improvement is in the Village of Elburn in Kane County. This Project has a gross and net length of 35395 ft (6.70 miles).