Design-Build Services for Standby Generator at Clearwater Executive Airport CNG Station
Closed State & local contract opportunity Posted
- Solicitation number
- 59-26
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Clearwater is requesting qualifications from design-build teams to furnish, install, and commission a natural gas-powered standby generator serving both the CNG fueling station at 1020 N. Hercules Avenue and the Clearwater Executive Airport new terminal building, with responses due October 22, 2026 and questions due October 12, 2026. A portion of project funding flows through the Florida Department of Transportation, and the selected design-builder must comply with all applicable FDOT terms and conditions.
The design-builder assumes full responsibility for existing-conditions assessment, product selection, design, permitting, integration of all system components, installation, testing, staff training, and project closeout. The preliminary design basis is 1,500 kilowatts; final sizing and system coordination remain the design-builder's responsibility. Minimum qualifications include five years of experience with natural gas-powered standby generators, three references preferably from public agencies, and at least one project involving CNG refueling station or similar fuel infrastructure within the past ten years. The design-builder must demonstrate financial capacity and bonding capacity for similar projects.
The anticipated contract term extends from January 2027 through July 2028, with the City retaining extension rights upon thirty days' written notice. Design and construction phases are negotiated separately under guaranteed maximum price arrangements using open-book pricing, governed by AIA A141-2024 with City modifications. Insurance requirements include commercial general liability of $1 million per occurrence and $2 million aggregate, professional liability of $2 million per occurrence, workers' compensation, and builder's risk coverage. Evaluation criteria weight qualifications of team, consultants, and subconsultants at 50 percent and technical approach at 50 percent. Presentations and interviews are anticipated for the week of November 16, 2026, with City Council authorization expected in January 2027.
Opportunity text
The City of Clearwater is seeking responses from qualified design-build teams with expertise in the selection, purchase, and installation of a compressed natural gas (CNG)-powered standby emergency generator.
The project scope shall include furnishing and installing a natural gas-powered standby generator that will support both the electrical load for the CNG filling station and the Clearwater Executive Airport (CEA) new terminal building. Services may include, but are not limited to, performing an existing conditions assessment, product selection, design, permitting, installation, testing, training of City staff, and project closeout. The Design-Builder (DB) shall be responsible for providing a complete and fully operational generator system, including all necessary components, whether or not explicitly identified herein. The City of Clearwater is issuing this time-sensitive Request for Qualifications (RFQ) to select a qualified Design-Builder to perform these services. The DB shall be responsible for final sizing, coordination, and integration of all system components necessary to deliver a complete and functional system. A Design Criteria Package (DCP) and supplemental information are included as part of this RFQ under the following attachments. Note: Attachments are provided for reference purposes only. The DB shall be responsible for performing all due diligence in the preparation of its response, and, if selected, for the design, construction and permitting of the project.
EXHIBIT A: Geotechnical Engineering Report
EXHIBIT B: CNG Fueling Station Upgrade Project As-Builts (revised June 21, 2023)
EXHIBIT C: CNG Station Upgrade Project Equipment Pad (dated October 23, 2020)
EXHIBIT D: Property Survey (signed September 17, 2024)
EXHIBIT E: Airpark General Terminal site plan (dated January 9, 2025) EXHIBIT F: Duke Energy Service Information form for New Terminal Building
EXHIBIT G: Section 26 22 13 Low-Voltage Distribution Transformers
EXHIBIT H: Section 26 32 13.16 Gas-Engine-Driven Generator Sets
EXHIBIT I: Section 26 36 00 Transfer Switches