Design and engineering services for I-4 / sand lake road interchange gateway improvements

Closed State & local contract opportunity

Solicitation number
Y26-802
State
Florida
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Orange County, Florida is soliciting design and engineering services for the I-4/Sand Lake Road Interchange Gateway Improvements project (Y26-802), seeking a qualified consultant to complete comprehensive infrastructure enhancement work. The scope includes final engineering design for landscape planting, irrigation, hardscape improvements, pond fountains, specialty pavements, lighting, and gateway signage along Sand Lake Road extending 0.4 miles from Turkey Lake Road to International Drive. Proposers must be Florida Department of Transportation (FDOT) pre-qualified in Major Work Groups 3.1 (Minor Highway Design) and 15.0 (Landscape Architect), with sub-consultants pre-qualified in work groups 4.1.1 (Miscellaneous Structures) and 9.1 (Soil Exploration). The evaluation will be based on weighted criteria including similar project experience of the project manager (15 points) and project engineer (10 points), project team skills (15 points), location (10 points), and approach/understanding of scope (30 points), totaling 80 points with potential bonus points for dislocated worker hiring and Service-Disabled Veteran participation. Key deadlines include a non-mandatory virtual pre-proposal conference on January 13, 2026, at 11:00 AM, a question submission deadline of January 20, 2026, at 4:00 PM, and final proposal submissions due electronically via the OpenGov e-Procurement Platform by February 10, 2026, at 4:00 PM EST.

The procurement offers potential bonus points for Service-Disabled Veteran participation (up to 15 points) and dislocated worker hiring (up to 5 points), indicating some preference for diverse contractor participation. The proposed Project Manager must be a Professional Landscape Architect registered in Florida and currently employed by the prime consultant, while the Project Engineer must be a Professional Engineer also registered in Florida. Professional Liability Insurance of $1,000,000 per occurrence with a deductible not exceeding $100,000 is required. The project has an estimated design fee of $620,000 and an anticipated construction cost of $11,000,000, with all deliverables to be completed within 365 calendar days of the Notice to Proceed. The contract will be awarded on a lump sum basis with monthly progress payments based on approved work completion, following Florida Statute 287.055 selection procedures. Orange County reserves the right to accept or reject any proposals and waive technicalities at its sole discretion, ensuring flexibility in the procurement process.

Opportunity text

2 versions

Update #2 · Latest ·

NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed responses for DESIGN AND ENGINEERING SERVICES FOR I-4 / SAND LAKE ROAD INTERCHANGE GATEWAY IMPROVEMENTS (Y26-802)

Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Tuesday, February 17, 2026.

The Estimated Design Cost for this project is $620,000.00. The Estimated Construction Cost for this project is $11,000,000.00.

NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform.Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers.

Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected.

Update #1 ·

NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed responses for DESIGN AND ENGINEERING SERVICES FOR I-4 / SAND LAKE ROAD INTERCHANGE GATEWAY IMPROVEMENTS (Y26-802)

Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Tuesday, February 10, 2026.

The Estimated Design Cost for this project is $620,000.00. The Estimated Construction Cost for this project is $11,000,000.00.

NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform.Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers.

Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors