Demolition of Nine Parcels at Hoot Owl Way

Closed State & local contract opportunity Posted

Solicitation number
VW0717
State
California
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Santa Clara Valley Water District is soliciting bids for demolition and site restoration at nine residential properties along Hoot Owl Way in Morgan Hill, California, with bids due August 21, 2026 and mandatory pre-bid site-walk attendance required for bid eligibility.

The scope encompasses hazardous-materials abatement and disposal, structural demolition and removal, septic-system location and removal or abandonment, utility coordination, debris hauling and recycling or disposal, stormwater-control preparation and implementation, site security maintenance, protection of drainage facilities and survey instrumentation, resident access preservation on Hoot Owl Way, and avoidance of encroachment into Anderson Dam Seismic Retrofit Project limits. Contractors must also prepare required plans and work documents, obtain permits and regulatory clearances, and perform final backfill, grading, site stabilization, driveway closure boulder placement, and closeout documentation.

Bidders must be qualified and properly licensed for demolition work. The pre-bid site walk is mandatory; contractors who do not attend are ineligible to bid. A Bid Notice document is attached (177 KB, posted July 18, 2026).

Opportunity text

Santa Clara Valley Water District is soliciting bids from qualified, properly licensed contractors to perform demolition and site restoration work at nine Valley Water-owned residential properties along Hoot Owl Way in Morgan Hill, California. The work includes preparing required plans and work documents, obtaining required permits and regulatory clearances, abating and disposing of hazardous or regulated materials, demolishing and removing structures and site improvements, locating and removing or properly abandoning septic systems, coordinating utility disconnects, and hauling, recycling, or disposing of debris. The Contractor will also prepare and implement stormwater controls, maintain site security, protect designated drainage facilities and survey instrumentation, maintain resident access on Hoot Owl Way, and avoid encroachment into Anderson Dam Seismic Retrofit Project limits. After demolition, the Contractor shall backfill excavations, grade disturbed areas, establish site stabilization, place driveway closure boulders, and submit required closeout documentation. A mandatory pre-bid site walk will be held, and attendance is required for bid eligibility

Files

File Type Posted
Bid Notice.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors