About this opportunity
The Ohio Department of Transportation is requesting quotes for eight light poles, 23'-6" round tapered aluminum with 10' davit arms and transformer bases under RFQ D06, with quotes due August 17, 2026. Delivery must occur within eight months of a valid State of Ohio Purchase Order.
Specifications reference the Delaware County Engineer's Office Design Resources and ODOT's 2023 Construction and Material Specifications Manual, along with ODOT Standard Construction Drawings for the Traffic Lighting "HL" Series. Hardware must be separately boxed and crated with labeled, packaged, and secured components; anchor bolts and mounting hardware must be included and installed on each bolt at shipment. An itemized parts list must accompany each shipment.
All deliveries are F.O.B. Destination and must occur between 7:00 a.m. and 1:00 p.m., Monday through Friday, excluding state holidays. The supplier must provide five business days' advance notice of delivery date and time. Deliveries shall be coordinated to ensure proper storage and hand-off; the supplier may request temporary waivers or adjustments to scheduling.
Contractors must be registered with the State of Ohio through the OhioPays Portal and provide documentation of authorized dealer or distributor status from manufacturers within seven business days of award. Commercial general liability insurance of at least $2 million per occurrence, cyber liability insurance of $5 million, and workers' compensation coverage are required. Contractors must complete the Contractor/Subcontractor Affirmation and Disclosure Form and Data Privacy and Security Addendum prior to award. The affirmation prohibits offshore service performance, locating state data offshore, and purchasing from Russian institutions or companies. Contractors and subcontractors must disclose principal business locations and all locations where services will be performed; any changes in service locations require immediate notification to the state. The contract is governed by Ohio law with exclusive venue in Franklin County.
Opportunity text
PLEASE FILL OUT THE TERMS AND CONDITIONS and The Affirmation and DIsclosure and Upload to the system 8 EACH - LIGHT POLE, 23'-6" ROUND TAPERED ALUMINUM WITH 10' DAVIT & TRANSFORMER BASE Delivery of the Light poles and Transformer Bases shall be made within eight (8) months upon written or verbal notification of a valid State of Ohio Purchase Order (PO). All deliveries shall be coordinated to ensure proper storage and hand-off methods are in place. Deliveries must be between the hours of 7:00 a.m. and 1:00 p.m., Monday through Friday, excluding State of Ohio holidays, unless special permission is granted by the department to temporarily waive or adjust this requirement. The supports shall be shipped with each supports associated hardware separately boxed/crated labeled, packaged, and secured. Anchor bolts as specified shall be included and delivered in bundles. A bundle shall consist of all required anchor bolts and mounting hardware. The mounting hardware shall be installed on each bolt when shipped. The supplier must notify the point of delivery date and time at least five (5) days in advance of the day of delivery or at the time of loading prior to shipment, whichever is sooner. This notification is needed for the Department to coordinate equipment to unload the shipment at the delivery location. An itemization of all delivered parts shall be provided with each shipment. Specifications: These specifications and procedures have been compiled in part from the Delaware County Engineer's Office "Design Resources" and the Ohio Department of Transportation 2023 Construction and Material Specifications Manual (C & MS) which can be found here: Delaware County Engineer's Office Design Resources: https://engineer.co.delaware.oh.us/drp/ ODOT C & MS: https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/2023_CMS_Final_to_Printer.pdf ODOT Standard Construction Drawings (Traffic Lighting "HL" Series): https://www.transportation.ohio.gov/working/publications Producer/suppliers shall meet ODOT's supplement 1091 Certification Procedure For Fabricators of Light Poles and Light Towers dated July 21, 2023. Producers/suppliers conforming to this supplement's requirements are authorized to provide light pole and transformers base materials under this certification. This supplement makes no changes or revisions of any ODOT/Delaware County, ASTM, or AASHTO specifications for the light pole or transformer base materials. ODOT Supplement 1091: https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/1091_07212023_for_2023.pdf Buy America Information: Producer/suppliers shall meet ODOT's latest updates to Buy America Requirements outlined in Proposal Note (PN) 133 - 07/18/2025 - Products Produced in the United States. Link to this PN is available here: https://www.dot.state.oh.us/Divisions/ConstructionMgt/Specification%20Files/PN133_07182025_for_2023.pdf Certifications of a light pole or transformer base does not eliminate the Project Engineer's authority to inspect and reject any, or all, certified light poles or light towers delivered to the jobsite with excessive defects, damage or that do not meet specifications Bid Line Items: One-time bid pricing for furnishing and delivery of light poles and transformer bases in accordance with the specifications stated below. The unit bid price shall include delivery charges to the location listed. 1: LIGHT POLE, 23'-6" ROUND TAPERED ALUMINUM WITH 10' DAVIT LIGHT POLES SHALL BE PER THE DELAWARE COUNTY ENGINEER'S OFFICE STANDARD LIGHT POLE DETAIL, REV #1 (04/26/16). LIGHT POLES SHALL BE FABRICATED FROM 6063 ALLOY EXTRUDED ALUMINUM TUBE WITH 0.250" WALL THICKNESS. BASE DIAMETER SHALL BE 8" WITH CIRCUMFERENTIALLY WELDED ANCHOR BASE OF CAST A356 ALUMINUM ALLOY. DAVIT ARM SHALL BE. 6'-6" RISE, WITH A 10' RUN AS NOTED ON THE PLANS. DAVIT ARMS SHALL BE FABRICATED FROM 6063 ALLOY EXTRUDED ALUMINUM, WITH 2" TENON ON THE LUMINAIRE END FOR A HORIZONTALLY MOUNTED, CONVENTIONAL-TYPE LUMINAIRE. THE DAVIT ARM SHALL SLIP-FIT ONTO A SPECIALLY FORMED TENON ON THE POLE AND BE SECURED IN PLACE WITH TWO STAINLESS STEEL BOLTS TO ACHIEVE A LUMINAIRE MOUNTING HEIGHT OF 30'. ALUMINUM LIGHT POLES AND DAVIT ARMS SHALL BE FACTORY PAINTED BLACK BY THE MANUFACTURER AND SHIPPED PROPERLY WRAPPED AND PROTECTED TO AVOID DAMAGE TO THE FINISH IN TRANSIT. POLES SHALL BE CLEAN WITH A SUITABLE WATER-BASED CLEANER OR SOLVENT AND THEN ELECTROSTATICALLY PAINTED WITH THE POLE MANUFACTURER'S STANDARD BLACK URETHAN/POLYESTER POWDER COAT PAINT TO A MINIMUM THICKNESS OF 2 MILS. AFTER SUITABLE CURING UNDER HEAT, THE POWDER COATING SHALL PASS THE FOLLOWING TESTS:
- PENCIL HARDNESS: H TO 2H
- IMPACT: 106 LB DIRECT IMPACT BY GARDNER MOD. 1G-1120
- PER ASTM D-2794 ADHESION: LEVEL 4 OR BETTER PER ASTM 3359-B
- ABRASION: LESS THAN 60MG OF FINISH AFTER 1,000 CYCLES ON TABER ABRASER EQUIPPED WITH CS-10 WHEELS UNDER 1KG LOAD
- HUMIDITY RESISTANCE: NO EFFECT ON FINISH AFTER 1,000 HOURS EXPOSURE TO 100% RELATIVE HUMIDITY AT 100° FAHRENHEIT
- WEATHERABILITY: MEET OR EXCEED ASTM 336
ANCHOR BOLTS SHALL BE FUNISHED AND SUPPLIED IN ACCORDANCE WITH STANDARD CONSTRUCTION DRAWING AND APPLICABLE REFERENCES. 2: TRANSFORMER BASE, AT-A IN ADDITION TO THE REQUIREMENTS OF 725.21 AND HL-10.13, ALUMINUM TRANSFORMER BASES SHALL BE PER DELAWARE COUNTY ENGINEER OFFICE STANDARD T-BASE DETAIL REV #1 (4/26/16). ALUMINUM TRANSFORMER BASES SHALL BE FACTORY-PAINTED TO MATCH THE SAME SPECIFICATIONS AS SPECIFIED IN "LIGHT POLE, MISC: 23'-6" ROUND TAPERED ALUMINUM POLE WITH A 10' DAVIT ARM". The provisions of C & MS 625.06 Shop Drawings are required. Acceptance of detailed shop drawings, etc. does not relieve the bidder of the responsibility for erroneous or inconsistent dimensions, notations, omissions, or other errors in the design of the delivered product. During bid advertisement, if further clarification is needed by the bidder due to issues or design errors before the bid opening date, the bidder shall submit all pre-bid questions to the Bid Contact. Any deviations from the specifications indicated herein must be clearly pointed out. Otherwise, it will be considered that items offered are in strict compliance with these specifications herein and the successful bidder will be held responsible, therefore. Each unit delivered shall be guaranteed against faulty material and workmanship for a period as stated by the bidder in the proposal (this guarantee period shall be not less than that usually granted) and, if during this period such faults develop, the bidder agrees to replace the unit or the part affected without cost to ODOT, with all replacement charges paid for by the vendor.