Coppermine Water Reclamation Facility
Awarded State & local contract opportunity Posted
- Solicitation number
- 22028-5002
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- 41122600 Laboratory microscope slides and supplies
- 41123101 Dialysis tubing
- 41123102 Dialysis clamps
- 42161515 Peritoneal shunt adaptors
- 42161516 Peritoneal dialysis catheter storage garments
- 41123100 Laboratory dialysis supplies
- 41123104 Dialysis membrane
- 42161505 Peritoneal dialysis drainage bags or containers
- 42161514 Peritoneal semi-automatic dialysate delivery systems
- 42161518 Peritoneal dialysis disconnect caps
Show all 29
- 42160000 Dialysis equipment and supplies
- 42161500 Peritoneal and equilibrium dialysis equipment and supplies
- 41123106 Dialysis flask
- 42161502 Peritoneal dialysate warmers
- 42161504 Peritoneal dialysis catheter adapters or clamps or connectors
- 42161509 Peritoneal dialysis units or cyclers
- 42161510 Peritoneal lavage kits
- 42161520 Peritoneal dialysis solutions with manual exchange tubing
- 41123103 Dialysis cassette
- 41123105 Dialysis cassette holder
- 42161501 Continuous ambulatory peritoneal dialysis CAPD transfer sets
- 42161503 Peritoneal dialysis administration sets
- 42161506 Peritoneal dialysis catheters or indwelling access devices
- 42161508 Peritoneal dialysis unit straps or harnesses
- 42161511 Acute peritoneal dialysis procedural sets
- 42161512 Peritoneal dialysis catheter extensions
- 42161513 Peritoneal dialysate filters
- 42161517 Peritoneal dialysis cassettes
- 42161519 Peritoneal dialysis catheter caps
- Point of contact
-
- Tara Goldin purchase@paulding.gov (770) 443-7512
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Paulding County Board of Commissioners, Georgia, is requesting sealed bids for construction of the Coppermine Water Reclamation Facility MBR Treatment Capacity Expansion (Bid Number 22028-5002), with bids due April 27, 2022, at 10:00 AM EST and a mandatory pre-bid meeting on March 29, 2022, at 10:00 AM EST at the facility. Bidders must hold a State of Georgia Utility Contractor License to submit bids exceeding $100,000.
The scope includes furnishing and installing new membrane units and modules in existing MBR Basins 2A and 2B with associated diffusers, chemical cleaning systems, piping, and valves; converting existing MBR control panels to Remote I/O panels; installing new submersible mixers in anaerobic and anoxic basins and new air scour blowers and bridge crane; replacing the existing chemical storage and feed system with ferric chloride storage tanks and caustic feed pump skids; updating the UV disinfection system; constructing a new pre-stressed concrete sludge holding tank with surface aerator; installing a new dewatering centrifuge in the existing solids dewatering building; and modifying the plant reuse pump station with new pumps, controls, and piping. A system integrator is required to connect all new and upgraded facilities to the existing plant SCADA. The engineer is Tetra Tech, Inc.
The contract award was made to IHC Construction Companies, LLC, on May 25, 2022, for $11.842 million. The contract specifies a substantial completion timeline of 480 consecutive calendar days with full completion within 536 consecutive calendar days. Each bid must include a cashier's check, certified check, or bidding bond equal to not less than five percent of the total bid amount. Performance and payment bonds are required upon execution, with all surety and insurance companies holding an AM Best rating of A-6 or greater. Digital bidding documents cost $50.00 non-refundable. Questions are due April 8, 2022, at 4:00 PM EST to Jo Hagler, Purchasing Specialist, at the Paulding County Finance Department. All bids remain subject to acceptance for 90 days after opening.
Opportunity text
Furnish and install new membrane units in existing MBR Basins 2A and 2B Provide other modifications to the existing Membrane Bioreactor (MBR Replacement of existing Chemical Storage and Feed System Updates to existing UV Disinfection System Installation of New Sludge Holding Tank Furnish and install new Dewatering Centrifuge in existing Solids Dewatering Building Provide other modifications to existing Solids Dewatering Building Modifications to existing Plant Reuse Pump Station Other piping, structural, electrical and instrumentation/control improvements to connect new/upgraded facilities to the existing plant systems All system integrator required to connect new/upgraded facilities to the existing plant SCADA existing plant SCADA
Files
| File | Type | Posted |
|---|---|---|
| Coppermine Water Reclamation | — | |
| Award Information | — |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity