Contract No. 2026-373 - Pin Oak Court Waterline Replacement

Closed State & local contract opportunity Posted

Solicitation number
US.230258
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from pennbid.bonfirehub.com. Updated .

About this opportunity

Cranberry Township Board of Supervisors, Butler County, Pennsylvania, solicited sealed bids under Contract No. 2026-373 for replacement of 1,250 linear feet of 8-inch waterline on Pin Oak Court from McIntyre Lane to Freedom Road, with bids due April 28, 2026 at 10:00 a.m. through PennBid. The Pennsylvania Prevailing Wage Act applies because the estimated project cost exceeds $25,000. The source names no set-aside or local-vendor preference. Questions closed April 22, 2026.

The scope covers all labor, materials, equipment, and supervision for ductile iron waterline installation, fire hydrant installation and relocation, tapping sleeves and valves, erosion and sedimentation controls, and concrete curb and sidewalk replacement. It also includes stream boring, a 16-inch steel casing installed by tunneling beneath existing stormwater BMP MR-3, asphalt milling and overlay, and waterline testing, detailed across 29 bid line items. Bidders must submit four sets of shop drawings and catalog cut sheets for approval and must demonstrate at least five years of similar waterline replacement experience through a Bidder's Experience Questionnaire with references. The technical specifications summary cites approximately 1,275 linear feet, while the bid documents state 1,250. Site constraints include FEMA floodplain and floodway areas, delineated wetlands, Brush Creek, and a tree-removal restriction from May 15 through July 31. Work on Freedom Road must occur during off-peak hours approved by the Township.

Award is lump sum to the lowest responsive and responsible bidder. The source does not state a contract value beyond the $25,000 threshold. Completion is due September 30, 2026, with liquidated damages of $250 per calendar day for overruns. Bidders must post a $1,000 certified check or bid bond with the bid, and bids remain irrevocable for 60 days after opening. Successful bidders must provide performance and payment bonds equal to 100% of the bid amount and a 15% maintenance bond, plus comprehensive general liability insurance with $1,000,000 per-occurrence limits and workers' compensation coverage. Retainage is 10%, reducible to 5% after 50% completion on written request. The warranty period is 18 months from substantial completion. Bids submitted directly to the Township are non-responsive.

Opportunity text

INVITATION TO BIDDERS Notice is hereby given that the Cranberry Township Board of Supervisors, Butler County, 2525 Rochester Road, Suite 400, Cranberry Township, PA 16066-6499, will accept sealed bids for the following contracts: Contract No. 2026-373 - Pin Oak Court Waterline Replacement Provide all labor, materials, equipment and supervision necessary for the replacement of 1,250 LF of 8" waterline from McIntyre Lane to Freedom Road, as more clearly specified in the Contract Documents. Bidding documents are available at no cost on PennBid (www.pennbid.net). Proposals shall be submitted upon forms provided by the Township. Bids will be received electronically via the PennBid Program until 10:00 AM on Tuesday, April 28, 2026, at which time the bids will be opened, with the results made available on PennBid. Bids submitted directly to Cranberry Township will be invalid and considered non-responsive. Questions regarding this bid shall be submitted via the "Messages" feature within PennBid. All bids must be accompanied by a certified check or bid bond in the amount of One-Thousand Dollars ($1,000) payable to Cranberry Township. All bids shall remain irrevocable for 60 days after the actual date of the opening. The estimated cost of this Project is greater than Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. The Board of Supervisors reserves the right to reject any or all bids and to waive any defects or irregularities in the best interest of the Township. Daniel D. Santoro, Township Manager/Secretary

Files

File Type Posted
1-Front End - Pin Oak.pdf PDF
3-Pin Oak DWGS.pdf PDF
2-Pin Oak Tech Specs.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors