2-Pin Oak Tech Specs.pdf

PDF 2 MB Posted

Attached to
Contract No. 2026-417 - 2026 Line Painting Program
Solicitation number
Not on record
Issued by
Butler County, Pennsylvania

About this file

This is a technical specifications document for Cranberry Township in Butler County, Pennsylvania, detailing the installation of approximately 1,275 linear feet of 8-inch potable waterline along Freedom Road (State Route 3020), Haldeman Drive, and Pin Oak Court. The project encompasses complete waterline installation including mobilization and demobilization, erosion and sedimentation controls, tapping sleeves and valves, fire hydrant installation and removal, ductile iron pipe (DIP) waterline installation, valve boxes, line striping restoration, concrete curb replacement, steel casing installation, stream boring, backfill materials, and asphalt milling and overlay work. Bidders must submit four sets of detailed shop drawings and catalog cut sheets for approval. Electronic bids are due by 10:00 AM on Tuesday, April 28, 2026, via the PennBid platform, with results posted on the same system. The Pennsylvania Prevailing Wage Act applies to this contract.

All bids must be accompanied by a certified check or bid bond in the amount of $1,000 payable to Cranberry Township, with bid irrevocability required for 60 days following the opening date. The estimated project cost exceeds $25,000. Specific unit costs are required for multiple line items including mobilization and demobilization, erosion and sedimentation controls, various valve connections, fire hydrant installation, ductile iron pipe installation, waterline bore under stream, backfill materials, and asphalt work. Work on Freedom Road must be conducted during off-peak hours as approved by the Township. The Board of Supervisors reserves the right to reject any or all bids and waive any defects or irregularities in the best interest of the Township. Questions regarding the bid must be submitted through PennBid's messaging feature.

View the file

Other files

File Type Posted
3-Addendum No. 1.pdf PDF
2-FinalLinePaintMapBook2026.pdf PDF
1-Front End - Line Painting.pdf PDF
3-Pin Oak DWGS.pdf PDF
1-Front End - Pin Oak.pdf PDF
1-Front End Activated.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARTICLE 5 - Specifications

5.1 GENERAL INFORMATION

5.2 TECHNICAL SPECIFICATIONS

5.3 DRAWINGS

5.1 GENERAL INFORMATION

Provide all labor, material, equipment, and supervision necessary for the installation of approximately 1,275 linear feet of 8-inch waterline along Freedom Road (State Route 3020), Haldeman Drive, and Pin Oak Court as specified more clearly in the Contract Documents.

It is the intent of these specifications to provide a new complete and workable potable water line system.

Any item not specifically called for in the specifications, but which are normally required to conform with the intent, is to be considered as part of the contract.

Provide any additional items not specifically mentioned herein but necessary for the proper performance and function of the system, without claim for additional payment.

Submit four (4) sets of detailed shop drawings/catalog cut sheets for as-specified material for approval.

Shop drawings shall include and clearly indicate the addition of any items not detailed herein, but necessary to provide a properly functioning and complete system.

1. The Unit Cost for Mobilization/Demobilization shall include all equipment, fuel, tools, labor, etc. to enter, prepare at, and leave the job site.

2. The Unit Cost for the Erosion & Sedimentation Controls shall include all labor, materials, and equipment necessary to install Compost Filter Socks, Inlet Protection, Pumped Water Filter Bags, E&S Blankets, and any other required erosion and sedimentation controls and maintain them over the life of the construction project. Installation and maintenance shall be in accordance with the PADEP E&S Manual.

3. The Unit Cost for 8” Tapping Sleeve & Valve shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline with a tapping sleeve, including but not limited to shutting off the existing waterline as needed, cutting and capping the existing waterline, installing a proposed resilient wedge gate valve and blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

4. The Unit Cost for 8” Valve & Connect to Existing 16” Waterline shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline to the proposed waterline, including but not limited to shutting off the existing waterline as needed, cutting and capping the existing waterline, installing 16”x8” reducer and blocking and Megalugs (or approved equal), as detailed and directed, complete and in place.

5. The Unit Cost for 8” Valve & Connect to Existing 8” Waterline shall include all labor, excavation, backfill, equipment, bedding, and related items to connect the existing waterline and valve to the proposed waterline, including but not limited to shutting off the existing waterline as needed, cutting and capping the existing waterline, installing blocking and Megalugs (or approved equal), as detailed and directed, complete and in place. Note work within Freedom Road must be conducted during off peak hours (as approved by Township).

6. The Unit Cost for Remove Existing Fire Hydrant & Deliver to Township shall include all labor, excavation, backfill, equipment, plugging, and related items to remove hydrant from deactivated waterline and properly seal and deliver hydrant to Township as directed.

7. The Unit Cost for the Fire Hydrant Installation, Valve, Tee & Waterline shall be in accordance with The Township's Public and Private Improvements Code - Detail SW-23 and shall include excavation, backfill, compaction, labor, fuel, bedding, material (including but not limited to: hydrant anchor tee, valve, 6” DIP waterline, restraint glands / Megalugs (or approved equal), fire hydrant (Mueller Super Centurion 250, A-423), concrete blocking, connection onto main and activation, bury depth of 4.5 feet as detailed and directed complete and in place.

8. The Unit Cost for the 8" Resilient Wedge Gate Valve shall include all excavation, backfill, compaction, labor, material, fuel, installation equipment, concrete blocking, bedding, and equipment, mechanical joint resilient wedge gate valves, (Mueller A- 2361MJXFL, or approved equal), and valve boxes (Tyler Series 6850, 664S, or approved equal).

9. The Unit Costs for Remove Valve Box shall include all labor, excavation, fuel, equipment, and material necessary for the removal of an existing valve box and backfill and temporary asphalt cold patch before final paving restoration (if applicable), line striping restoration (as applicable), as detailed and directed, complete and in-place.

10. The Unit Cost for 8x8x8 Tee and Two Valves shall include all labor, fuel, equipment, and material necessary for installing an 8x8x8 tee and blocking and resilient wedge gate valves and three-piece valve boxes as called out, as detailed and directed, complete and in-place.

11. The Unit Cost for the 8” Ductile Iron Pipe (DIP) Waterline shall include but not be limited to all excavation, bedding, labor, equipment, fuel, tools, ASTM Class 52 double cement-lined ductile iron waterline pipe, waterline installation, flushing, miscellaneous fittings and bends (double cement-lined) with Megalugs, concrete anchors, blocking, Megalugs (or approved equal), marking tape as specified, called out, detailed and directed, complete and in-place.

12. The Unit Cost for Waterborne Line Striping Restoration shall include all labor, excavation, backfill, fuel, equipment, and material necessary for restoring existing line striping on asphalt disturbed during construction as detailed and directed complete and in place. This item shall include but is not limited to solid white and yellow lines, arrow markings, dashed white lines, and stop bars.

13. The Unit Cost for Concrete Curb Replacement shall include all labor, material, excavation, backfill, equipment, to remove and replace cement concrete curb in kind, as per section 630 of the Penn DOT PUB 408, as detailed and directed, complete and in-place.

14. The Unit Cost for 16” Steel Casing shall include all labor, fuel, equipment, excavation, backfill, and material necessary for 16” steel casing pipe, spacers, watertight casing seals, and interior waterline installation under existing stormwater BMP as called out, detailed and directed, complete and in-place.

15. The Unit Cost for Waterline Bore Under Stream shall include all labor, fuel, equipment, excavation, backfill, and material necessary for bore pit, receiving pit, casing pipe, spacers, watertight casing seals, and interior waterline installation under existing stream between bore pits as called out, detailed and directed, complete and in-place per the project’s General Permit.

16. The Unit Cost for 2A Select Backfill shall include all labor, material, equipment, tools, fuel, and transportation for installing 100% PennDOT-approved 2A limestone backfill above the pipe bedding in the waterline trench where the waterline is under or within four feet of the edge of a road, as directed and detailed complete and in place.

17. The Unit Cost for SR 3020 Mill and Overlay shall include all labor, material, equipment, tools, fuel, and transportation for milling 2.5” and installing one-inch Superpave

Asphalt Mixture Design, Wearing (Leveling) Course, Pg 64e-22, 3 To <10 Million ESALs, 9.5mm Mix, SRL-L and 1.5” Superpave Mix 9.5mm Wearing Course (0-.3 million ESALs), all edge and surface cleaning, sealing, tack coat, pavement marking restoration, rumble strip restoration, keyways, concrete curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details and the project’s Highway Occupancy Permit, as directed in the field, complete and in-place.

18. The Unit Cost for Pin Oak Court Mill and Overlay shall include all labor, material, equipment, tools, fuel, and transportation for milling 1.5” and installing 1.5” Superpave Mix 9.5mm Wearing Course (0-.3 million ESALs), all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, pavement marking restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details, as directed in the field, complete and in-place.

19. The Unit Cost for 25mm Base Course, 7” Depth (PennDOT ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing seven-inch compacted thickness PG64-22 Superpave Asphalt Mixture Design, WMA base course in trench, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details and the project’s Highway Occupancy Permit, as directed in the field, complete and in-place.

20. The Unit Cost for 19mm Binder Course, 3.5” Depth (PennDOT ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing three and a half-inch compacted thickness PG64-22 Superpave Asphalt Mixture Design, WMA binder course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details and the project’s Highway Occupancy Permit, as directed in the field, complete and in-place.

21. The Unit Costs for 9.5mm Wearing Course, 1.5” Depth shall include all labor, material, equipment, tools, fuel, and transportation for installing PG64-22 Superpave Asphalt Mixture Design, WMA wearing course 1.5” compacted thickness in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, pavement marking restoration, keyways, curb replacement, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 and Township Standards and Details and the project’s Highway Occupancy Permit, as directed in the field, complete and in-place.

22. The Unit Costs for 25mm Base Course, 8” Depth (Township ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing seven-inch compacted thickness PG64-22 Superpave Asphalt Mixture Design, WMA base course in trench, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per PennDOT 408 Standards and Details, as directed in the field, complete and in-place.

23. The Unit Costs for 19mm Binder Course, 1.5” Depth (Township ROW) shall include all labor, material, equipment, tools, fuel, and transportation for installing 1.5” compacted thickness PG64-22 Superpave Asphalt Mixture Design, WMA binder course in trench and including but not limited to one-foot cutbacks, all edge and surface cleaning, sealing, tack coat, keyways, wedge curb restoration, power brooming, compaction, temporary paving as needed and specified and joint sealing in the work area disturbed by the waterline. All work shall be performed as per Township Standards and Details, including the re-establishment of subsurface drains, and wedge curb, as directed in the field, complete and in-place.

24. The Unit Costs for Sawcut Asphalt Road shall include all power brooming, saw cutting, and joint sealing. All work shall be performed as per the Township Standards and Details, as detailed and directed complete and in place.

25. The Unit Cost for Sidewalk Replacement shall include all labor, material, excavation, bedding, backfill, equipment, fuel, tools, and transportation necessary to replace existing disturbed sidewalk to match existing sidewalk with AA Concrete. Work to include disposal of existing disturbed sidewalk, as specified, called out, detailed and directed, complete and in-place.

26. The Unit Cost for Seeding & Restoration shall include all labor, fuel, equipment, and material necessary for all utility pole, guy wire, mailbox, gas service line and valve, and all lawn restoration for areas impacted by construction. Screened topsoil shall be used in the restoration of lawn areas and seeding shall be conducted per project plans and Township Standards and Details. The removal of the E&S controls after the work areas have been re-established shall be included in this line item.

27. The Unit Cost for Traffic Control shall include all labor, equipment, fuel, tools, approved apparatus for site preparation and installation of any PennDOT-approved traffic control measures, etc. per PennDOT standards and the project’s Highway Occupancy Permit.

The Permit shall be on site and always followed, including coordination with PennDOT.

All traffic controls shall be in place as needed each day when construction activities are occurring.

28. The Unit Cost for Waterline Testing shall include all materials and equipment necessary for testing all installed waterline and associated items, including but not limited to fittings and valves. Testing includes but is not limited to pressure and bacteria testing and shall be conducted per Township’s Standards and Details and Public and Private Improvements Code, as directed and detailed, complete and in place. This item shall include proof of bacteria test results, approval from Township, and then activating the waterline for testing and for final use.

29. The Unit Cost for the Hauling and Proper Disposal of Spoil Materials shall include all labor, material, equipment, fuel, tools, transportation and proper disposal of excess fill at a Township-approved permitted disposal site. All required items and efforts to ensure proper disposal are covered in this item and approval must be received from the Township prior to starting any work. This item includes but is not limited to excess fill removed from trenches which will be replaced with stone as called out, detailed and directed, complete and in-place.

5.2 TECHNICAL SPECIFICATIONS

CRANBERRY TOWNSHIP PPIC

§17-403 - SANITARY SEWER AND PUBLIC WATER

SYSTEMS

§ 17-403. Sanitary Sewer and Public Water Systems. [Ord. 96-273, 9/5/1996; as amended by Ord. 2003-339, 4/1/2003, § 4; and by Ord. 2005-362, 12/15/2005]

1. General Requirements.

A. Introduction.

(1) These specifications cover the requirements construction of all of the Township's water and sewer line facilities. These specifications are intended for and apply to all such projects whether directly constructed by (a) contractor(s) under contract the Township, or constructed by a land developer who in turn employs a construction contractor(s).

(2) Where the term "Township" is used herein, it shall mean the Municipal Sewer and Water Authority of Cranberry Township, its employees, management, or Board, as is appropriate for each occurrence of use of the term. When necessary or the Township may call upon its engineering and/or legal consultants for advice and direction.

B. Inspection of Construction Work.

(1) All work performed in connection with the extension modification or improvement of public water or wastewater facilities within the Township shall be required to conform with all Township rules and regulations and shall be inspected during construction by an authorized representative of the Township.

(2) All completed work shall be required to meet the approval of the Township and shall be changed, modified, replaced, removed or otherwise corrected by the contractor to such extent as directed by the Township.

(3) The work will be periodically or continuously inspected during its progress and when completed, shall be in inspected jointly, by the Township and the contractor.

(4) The contractor shall keep on site, and make available upon request by the Township, a surveyor's rod and level for the purpose of spot checking elevations as the work progresses.

(5) The contractor shall also keep and make available a 300 feet surveyors tape for the purpose of spot checking distances and for the purpose of the contractor providing off-set measurements as the work progresses.

C. Rights-of-Way.

(1) The alignments and locations of the proposed pipe lines and appurtenances are shown on the plans on which street, highway and/or other acquired rights-of-way limits have also been superimposed. No pipe line shall be relocated outside of the street or other right-of-way within which it is shown without obtaining the formal written approval for such

:1 chance from the Township.

(2) Where a special pipe line right-of-way is obtained through private property, the minimum permanent width for operation and maintenance purposes shall be 20 feet; the width of the temporary right-of-way obtained through such private properties for initial pipe line installation and construction purposes shall be 40 feet, 10 feet of which shall be located adjacent to and on the outside of both limits of the permanent right-of-way. The minimum distance between the center of any longitudinal pipe line and the right-of-way limit line shall be five feet. All construction activities shall be confined within the 40 feet wide construction right-of-way as much as possible.

(3) The contractor shall, however, make his own arrangements for office space, materials storage yards, change trailers, sanitary facilities, utility services, debris disposal sites, and for ingress and egress to any location along the pipe line project for which the contractor desires or requires use and, for which the Township has been granted no such right-of-way.

(4) Proposed pipe lines and appurtenances may also encroach upon, right-of-way occupied by pipelines or other facilities owned, operated and/or maintained by other utility companies and/or governmental agencies. It shall be the responsibility of the contractor to notify the appropriate representatives of those agencies in advance of performing any work therein and, to conduct all construction activities in accordance with the respective regulations appertaining thereto. The contractor shall utilize the PA One Call System as required by law. The PA One Call telephone number is 1-800-242-1776.

(5) The position of water and sewer lines proposed to be constructed in connection with land development projects shall be such that, regardless of the sequencing of various utility line construction gas, power, telephone, water, storm sewer, sanitary sewers, etc. no pipe line shall be aligned longitudinally, along either the water or sanitary sewer lines, any closer than three feet. It is imperative that such minimum distance be maintained along all sanitary sewer and water lines to provide space required for future maintenance and/or repairs.

(6) The separation between sanitary sewer and waterline pipe(s) shall be in accordance with the regulations of the Pennsylvania Department of Protection, in accordance with Detail Drawing SW-5.

D. Control of Pipe Line Elevations and Alignments.

(1) The contractor shall confirm the elevation of all existing facilities to which proposed facilities will connect, as well as the profile of the existing and/or finished (in the case of land development projects) ground lines, prior to commencement of construction, to confirm compatibility.

§ 17-403 § 17-403

:2

(2) All sewer lines shall be required to be constructed and the elevations and alignment shall be controlled by the use of laser equipment. Sewer line construction shall begin at the manhole with the lowest invert elevation unless prior approval is granted by the Township. Water lines shall be installed on uniform slopes as indicated on the profiles to assure that the air release valves (where indicated) will function effectively. Similarly, such grade controls of waterlines shall also be implemented to assure that blow-off assemblies are properly located.

(3) The contractor shall employ competent field survey personnel as may be required to control grades and/or alignment of proposed facilities and to assist the Township by obtaining information during construction progress, and for purposes of preparing as-built record drawings.

E. Traffic Warning Signs, Barricades, Lights and Control.

(1) Where pipe lines and/or other facilities are constructed along State Highways and/or Township Streets, and where construction activities may otherwise impede normal vehicular traffic patterns on said highways or streets, the control of traffic shall be accomplished in accordance with the details set forth in Publication 203 of the Pennsylvania Department of Transportation, the title of which is "Work Zone Traffic Control."

(2) The position of work zone signs, erection of signs, sizes of signs, details and configuration of signs, traffic channelizing, tapered lengths/spacing, cones, drums, vertical panels, lighting devices, arrow boards and all flagging conduct and activities shall conform to the details described therein. The location and configuration of traffic control methods shall conform to those graphically illustrated on the appertaining Table 5 and Figures 5 through 23 shown in the publication. The contractor shall submit a traffic control plan and procedure (conforming to the above referenced Publication 203) to the Township for approval, prior to commencing with field construction.

F. Exploratory Excavations.

(1) Some of the proposed pipe lines and appurtenant structures are somewhat flexible with respect to alignment. Therefore, in those existing streets, roadways, berms or other areas expected to have a number of underground utility lines, where there are large trees which may be saved by realignment, and where the Township so directs, the contractor shall make appropriate exploratory excavations for the purpose of locating said lines.

(2) In all instances, the costs associated with exploratory excavations shall be the responsibility of the contractor, and any realignment of pipelines shall be approved by the Township.

G. Existing Utility Lines — Location, Protection and Hazards.

:3

(1) The plans show those underground water lines, gas lines, electric lines, cable TV lines, telephone lines, sanitary sewers, storm drains, conduits and other similar utility lines and appurtenances for which said location information was either made available to the designer, or was observed in the field. Neither the number of such underground facilities nor their respective types, sizes and/or locations can be assured or guaranteed and it is therefore, the responsibility of the contractor to obtain such additional information; as is required to properly complete the work in compliance with the specifications, and to contact the owners of the various utilities in the area prior to starting and during performance of the work accordance with 73 P.S. § 180.

(2) The approximate location of any power and telephone poles and guy poles along the route of the work is shown on the drawings and the overhead lines supported by all such poles shall be observed and located by the contractor prior to commencement of the work.

(3) The contractor shall be completely and solely responsible for any and all property damages, bodily injuries financial losses and interruption of service that results from or are attributable to his construction activities and, which affect water lines, gas lines, electric lines, telephone lines, drain lines, sanitary and storm sewer lines and all appurtenances and service facilities connected thereto. Restoration of all such disturbed facilities shall be accomplished immediately after incurrence thereto.

(4) Water, sewer, gas, power and telephone service to dwellings or places of business shall be maintained with a minimum of interruption throughout the construction of the contract work. No such service shall be intentionally interrupted without the approval of the respective utility company concerned, and without first giving due warning to the occupants of said dwelling or business establishment. At least three working days notice of an interruption in service shall be given to the Township so that the Township may notify its customers.

(5) In some areas, it may be found that existing pipe lines are in a location where construction of the proposed work cannot reasonably proceed until the utility has been relocated. The contractor shall make all necessary subsurfaces investigations and shall locate such utility mains far enough in advance of the trenching work so that work progress is not unnecessarily interrupted.

(6) Attention is directed to the fact that the proposed work could be in close proximity to overhead power lines which transmit electric current at high voltages and which, if disturbed or contacted during construction, would be hazardous to construction personnel and/or other persons. The contractor shall, therefore, properly protect such wires, pole supports or other power line appurtenances to avoid disturbance to those facilities, and shall operate all machinery and conduct all other construction

:4 activities in a manner which will assure protection of all construction personnel and other persons against said hazards.

(7) Work in the vicinity of the existing underground gas lines and appurtenances is also hazardous because under certain conditions, such materials are flammable and/or explosive and, the contractor shall avoid all temporary and permanent supports and other required protection to prevent exposure of the same to construction personnel and/or other persons. Where such lines are exposed during construction and leakage is detected, construction work in those areas shall be immediately suspended, the owner of the pipe lines shall be immediately advised of the condition and the construction work shall not resume until all repairs have been properly completed.

(8) The construction activities required to be performed in the conduct of the work may necessitate the interconnection, interception, surveying, inspection, removal, replacement and repair of certain existing manholes, sewer pipes and appurtenances. Said items are conveying all wastes and runoff discharged to and infiltrating into the public sewer system within the area served, which wastes may contain and/or generate toxic, noxious oxygen depleting or other liquid or gaseous substances harmful to human beings.

(9) The contractor shall also provide all personnel with all tools, clothing and other devices necessary for such safe practice, including appropriate waterproof clothing, respirators, protective glasses, mechanical air blowing equipment to pre-ventilate manholes and other chambers, explosive atmosphere detectors, ladders, safety harnesses, etc. No work shall be performed under any unsafe conditions and if same is detected at any time, the contractor shall, therefore, thoroughly instruct all personnel involved in such work so that appropriate and complete safety practices are observed at all times.

2. General Notes.

A. Shop Drawings.

(1) Prior to delivery to the job site, the contractor shall supply to the Township four copies of shop drawing details of all pipe and appurtenances including, but not limited to: pipe, valves, fittings, hydrants, brass, boxes, manholes, frames and castings, steps, coatings, etc.

(2) Each shop drawing shall be stamped by the contractor and the supplier.

The supplier shall be an approved distributor of the manufactured product and shall state as such on the submittal.

(3) No materials shall be incorporated in any sewer or water lines or appurtenances which have not received prior approval.

:5

(4) The Township will review, make corrections on, reject and/or approve submitted shop drawings and will return two copies to the contractor.

Resubmittal shall be made by the contractor as required to obtain approval prior to installation of the material.

B. Preconstruction Photos. Prior to any mobilization, one set of photos of all proposed off-site construction shall be submitted to the Township. The photos shall be indexed with a date and location and in binder format.

C. Restoration.

(1) The contractor shall have no more than 1,000 lineal feet of disturbed trench at one time.

(2) All areas which are disturbed by construction operations, including equipment and materials storage, and which are not occupied by pavement or permanent structures shall be seeded with grass seed or crown vetch, when slopes are greater than 3:1.

(3) In lawns, gardens and in other improved areas (except for streets, roadways and traveled ways), the top of the backfill material shall be placed to an elevation approximately six inches below the finished ground surface. The top six inches shall be topsoil that has been screened of impurities prior to spreading. All excavated areas and other areas where construction equipment and activities impose damage to ground surfaces shall receive six inches of screened topsoil.

(4) After the topsoil has been spread, all lawns shall be restored by raking the area disturbed by construction. An application of an approved fertilizer at a rate of 50 pounds per 1,000 square feet shall be made. Said area then shall be completed with peat moss, mushroom manure or other approved grass seed shall be sown. The contractor shall be responsible for restoration of all settlements and for properly preparing the topsoil, applying fertilizer and mulch and planting the seed, but will not be responsible to water those restored areas.

(5) All shrubbery which is removed temporarily to accommodate construction, shall be promptly replaced after backfilling is completed and shall be fertilized and otherwise treated to insure restoration to a condition existing prior to construction.

(6) Shrubbery which is not successfully removed and replaced, shall be placed by the contractor for the period of 18 month maintenance bond.

(7) The contractor shall furnish nursery-grown stock. The plant shall be replaced in kind unless directed otherwise by the Township. All plantings which have died or which do not exhibit a healthy and vigorous growth shall be replaced by the contractor.

(8) Any surface irregularities shall be corrected to prevent formation of low

:6 places where surface water may pool.

D. Seed Mixture.

(1) Temporary Cover. Seed mixture for temporary cover shall consist of 100% annual rye grass. Seed shall be applied at the rate of 10 pounds per 1,000 square yards unless noted otherwise.

(2) Permanent Cover (Mowed Areas). Seed mixture for permanent grass cover shall consist of the following: perennial rye grass mixture (20% by weight), creeping red fescue (30% by weight) and Kentucky bluegrass mixture (50% by weight). Seed shall be applied at a rate of 21 pounds per 1,000 square yards.

(3) Permanent Cover (Non-mowed Areas). Seed mixture for permanent grass cover shall consist of the following: tall fescue (70% by weight), birdsfoot trefoil mixture (1/2 viking and 1/2 empire, norcen or leo, 20% by weight) and redtop (10% by weight). Seed shall be applied at a rate of

10.5 pounds per 1,000 square yards.

E. Tunneling, Boring and Jacking.

(1) The contractor shall comply with all applicable Federal, State and Township ordinances, codes, statutes, rules and regulations and affected jurisdictional bodies. For State highway areas, the contractor shall comply with Pennsylvania Department of Transportation Publication 408 Specifications.

(2) Regardless of whether tunneling, jacking or boring is employed, the contractor shall be responsible for construction of the various pipe lines, true to line and grade, and shall be held fully responsible for protection against surface subsidence, damages or disturbances to the satisfaction of the Township.

(3) The contractor shall be responsible for reimbursing all agencies owning property where boring, jacking or tunneling is required for any inspection and/or flagmen costs incurred and deemed necessary by those agencies at any and all locations where work is performed, to ensure safe traffic conditions and safe conduct of work.

(4) All sheeting, shoring, bracing, lining, etc., required for the construction of tunnels, shafts, portals, etc., shall be furnished and installed by the contractor. All work relative to the installation of liners and carrier pipes by means of jacking, boring or tunneling shall be performed in accordance with regulation set forth under Subpart S, Tunnels and Shafts, Caissons, Cofferdams and Compressed Air published as a part of the Safety and Health Regulations for Construction by the U.S. Department of Labor.

(5) Where tunneling is employed, the tunnel line plate shall be designed by

:7 the contractor for the particular diameter or shape elected. The plate shall be designed and assembled in accordance with the manufacturer's published recommendations for the material encountered in the tunnel excavation.

(6) Tunnels shall be carefully excavated by experienced tunnel workers and shall be trimmed to such a size and shape as to allow the proper placing on the pipe lines to the proper alignment and grade. Caution shall be exercised in excavating tunnels so that voids outside the casing and disturbance of the surrounding material are kept to a minimum. Large voids are to be filled immediately with grout.

(7) The contractor shall excavate the tunnel and support the surrounding earth so that no movement of the earth over or adjacent to the work shall occur at any time. If, due to unforeseen conditions or otherwise, any such movement does occur, the Township may order the contractor to stop any and all work except that which assists in making the tunnel secure and in preventing further movement of the ground over or adjacent to the work.

(8) Where boring and jacking is employed, the casing pipe shall at all times follow behind the boring auger at a distance no greater than two feet. The method of auguring the entire hole and then pushing the pipe will not be permitted.

(9) Steel casing pipe shall be new, shall be visibly sound and round, and shall be suitable for the service intended. All joints shall be of metal and of leakproof construction, designed to carry the earth load and any other pressures present. It shall be welded steel pipe (full circumference welded joints) manufactured and tested in accordance with the industry wide accepted ASTMS and standards. The steel pipe shall have a minimum yield strength of 35,000 psi.

(10) Minimum casing wall thickness shall be as follows:

Nominal Diameter of Casing Uncoated and Unprotected

(inches) Pipe in Inches

0.250 10 and under

0.250 12 and 14

0.312 16

0.312 18

0.344 20 and 22

0.375 24

0.406 26

0.438 28

:8

Nominal Diameter of Casing Uncoated and Unprotected

(inches) Pipe in Inches

0.469 30

0.500 32

0.532 34 and 36

(11) The carrier pipe shall be adequately supported with stainless steel casing spacers or approved equivalent. There shall be a maximum of six feet of separation between casing spacers. Treated wood skids are not permitted.

(12) All boring and jacking shall be unclassified and not extra payment will be made for rock, boulders, shale, timber, logs, old foundations, masonry or other natural or artificial materials encountered in the boring and/or jacking operations.

(13) When boring is employed, the contractor shall be responsible for construction of the various crossings true to line and grade and shall be held fully responsible for protecting against surface subsidence damages or disturbances to adjacent property and facilities from his construction operation and shall rectify to the satisfaction of the Township.

(14) Should an obstruction or misalignment be encountered during any boring or jacking so as to prevent continuation of operations, the auger shall be removed and any excess pipe cut and capped. The casing interior and any void spaces outside of the casing shall be pressure grouted, with a Township approved grout, completely to fill all voids before establishing a new boring or jacking site.

F. Open Excavation and Backfill.

(1) All excavation shall be unclassified and the Township shall make no extra payment for hand excavation or for the removal of any rock, boulders, stumps, tree roots, shale, muck, masonry, curbing, paving or other natural or man-made materials.

(2) The limit of daily trench excavation shall be to a length of pipe placement and backfilling that can be completed the same day.

(3) All ductile iron pipe and reinforced concrete pipe may be installed directly on exposed trench bottoms, where no rock or other unyielding material or where so soft unstable conditions exist.

(4) Where the exposed trench bottom consists of rock or other unyielding material, the trench shall be undercut a minimum of four inches and the ductile iron or reinforced concrete pipe shall be installed on six inches on a Township approved bedding material and at no additional expense to

:9 the Township.

(5) When soft and/or unstable trench bottoms exist, the trench shall be undercut and stabilized to the satisfaction of the Township. Trench bottoms shall be undercut at joints where pipe bells will occur to assure that all pipe barrels are continuously supported for the entire barrel length. If this method does not provide adequate pipe support, as determined by the Township, concrete caissons shall be installed as required at no additional expense to the Township.

(6) All polyvinyl chloride pipe (PVC) shall, regardless of the character of the exposed bottom, be installed on Township approved bedding material of at least six inches. At the determination of the Township, any of the above methods for ductile iron or reinforced concrete pipe shall apply to PVC pipe at no additional expense to the Township.

(7) The excavation material from the trench may be temporarily stored along its alignment on right-of-ways obtained for construction purposes. It may not, however, prohibit traffic flows along the streets and roadways, access to private properties, or access to existing utility lines by the respective utility companies. The excavated material shall not obstruct or alter the flow of surface water runoff to drainage facilities and ditches.

(8) Along all pipelines, the backfill material placed above the pipe zone shall be selected excavated material which shall be compacted and placed in such a manner to avoid disturbance or displacement of the pipe and other appurtenances. The backfill material shall be free of bricks, concrete, trees, stumps, frozen or mucky material, excessive amounts of rocks and other debris, and shall be mechanically compacted.

(9) Backfill material placed in trenches are located in an improved area, shall be 100% stone backfill. Improved areas are traveled ways, road shoulders and berms. The 100% stone backfill shall be placed in lifts not exceeding eight inches in thickness and shall be thoroughly and mechanically compacted for the full depth of the trench.

(10) When the trench excavation is being backfilled, the disturbed area shall be graded to final contours and appropriate temporary erosion and sediment pollution control measures/facilities shall be installed.

(11) All excess excavated material resulting from the construction of the pipelines and appurtenances shall be disposed at a location and in a manner determined by the contractor and at no additional expense to the Township.

(12) The contractor shall schedule construction activities and provide all required equipment, steel plates, cones, barricades and personnel such that the backfilling of the trenches located along or crossing streets, street berms, roadways, driveways or other traveled ways results in resumption

:10 of normal traffic patterns immediately.

G. Compaction Testing.

(1) The contractor is informed that in those areas where the excavated material is utilized as backfill, the backfill shall achieve a density of 95% as determined by the Standard Method A, Proctor Test.

(2) Tests will be performed in any area determined necessary by the Township. In the event that the placed backfill does not comply with the 95% density requirement, the work shall be re-excavated, re-compacted and retested at no additional expense to the Township.

H. Site-Safety.

(1) Safety of the construction site shall be the sole responsibility of the contractor.

(2) All structure excavations and open trenches shall be constructed in accordance with the rules and regulations set forth by the Occupational Safety and Health Administration and the U.S. Department of Labor.

Methods of installation shall be compatible with assuring the protection against disturbance and other personnel in accordance with the above-referenced agencies.

(3) Trenches at any and all locations where pedestrian or vehicular traffic hazards would result, shall not be left open during non-construction hours, unless they are suitably covered with a steel plate which is adequately anchored and reinforced to sustain pedestrian and/or vehicular traffic loads which may be imposed. All excavations within road right-of-ways shall be closed over night and over weekends and marked with flashing traffic markers.

I. Blasting. All blasting shall be performed in accordance with all applicable Federal, State and Local laws, rules and regulations regarding registration, transportation, storage, handling and otherwise using explosives. Blasting permits are required to be obtained in advance from the Township.

3. Site Work and Preparation.

A. Clearing and Grubbing.

(1) Certain work to be performed will require clearing. The contractor shall cut, clear and remove all brush, sapling, scrub and other wild growth along the route of the pipe lines. No trees shall be cut, however, without the specific approval and prior designation for cutting, by the Township.

It is the intent of these specifications to minimize the removal of trees and, therefore, only those which will positively prevent the application of reasonable construction methods and procedures will be permitted to be removed.

:11

(2) Brush, scrub growth, stumps, saplings and tree limbs and trunks so directed to be cut and removed, shall be placed into piles and shall be burned or otherwise destroyed or completely removed from the site of the work. No such debris shall be included in any backfill and as part of the clean-up work shall be required to be removed and transported away from the site.

B. Bedding and Specially Graded Backfill Material.

(1) All pipe line bedding material, all material placed within the pipe zone of trenches in which PVC pipe is constructed and, all material placed above the trench bottom and below the concrete trench slab (where trenches cross or are located within Township streets or State roads; shall be either pea gravel, two limestone or two gravel, complying with the gradation and classification of the Pennsylvania Department of Transportation.

C. Dewatering.

(1) All excavation shall be dewatered thoroughly in advance of the installation of any of the construction work; no facilities shall be constructed in any excavation where water flows or is pooled, or where groundwater infiltration or surface water inflow is not immediately removed.

(2) Water which accumulates in the open trench shall be completely removed by pumping before pipe placement and or backfilling begins.

(3) Where dewatering does occur, the contractor shall conduct those operations in a manner which complies with regulations on the subject of Soil Erosion and Sedimentation Control as promulgated by the Pennsylvania Department of Environmental Protection. No such discharges shall be permitted to erode or otherwise adversely effect any public or private property and all such discharges shall be trapped, settled, rough-filtered, retained and/or checked (depending upon the clarity, turbidity, and concentration of suspended solids) within such discharges allowable.

D. Dust and Mud Control on Streets and Other Traveled Ways.

(1) Dust control palliatives shall be utilized where and when necessary to satisfactorily maintain roads, streets, berms and other traveled ways for vehicular traffic. In addition, the accumulation of mud and/or dirt from the excavation, backfill and trenching operations shall be cleaned off the surfaces to properly maintain the roadway in a condition satisfactory to the Township.

E. Stream Crossing.

(1) Where sanitary sewer or water distribution system pipe lines cross creeks or streams, such crossing shall be accomplished by using ductile iron pipe

:12 or PVC encased in a minimum of six inches of concrete all around the pipe, and fittings conforming to the requirements of the appertaining sections of these specifications.

(2) The pipe shall be tied to eight inches concrete blocks laid on the trench bottom and shall be encased in concrete all around the pipe. The concrete encasement shall be at least six inches thick. The minimum depths of pipe, that is, the vertical distance between the lowest elevation of the stream along the pipe alignment and the top of the pipe, shall be three feet. Where rock is encountered within the trench bottom, bedding material (as also specified herein) shall be utilized.

(3) The concrete encasement of the pipe shall extend between the tops of the stream on creek banks, or where such banks are not evident, a minimum distance of five feet each side beyond the normal stream channel.

(4) Water line stream crossings shall extend from valve manhole to valve manhole or valve and box. It may be required that valve manholes be installed on each side of the stream crossing.

(5) Backfill around the stream crossing shall consist of the excavated material unless the same is deemed unsuitable by the Township at the time of excavation.

(6) Disturbed bank areas shall be stabilized immediately upon completion of the crossing.

(7) As shown on the construction drawings, riprap shall be installed to prevent erosion of the slopes, stone shall be minimum of 35 pounds durable rock, dumped or hand placed to a minimum depth of 10 inches.

Installation of riprap- shall be per PaDEP requirements and regulations.

4. Materials and Installation.

A. Sewer Pipe General.

(1) All pipe shall be transported, unloaded, handled, and installed in strict accordance with the recommendations of the pipe manufacturer.

(2) All nonresidential sanitary sewer laterals shall be a minimum of six inches in diameter and shall tie directly into a sanitary manhole. Wye connection(s) shall not be acceptable on nonresidential connections.

Residential connection(s) may either four inches or six inches in diameter and may tie into a manhole or wye connection.

(3) Four inch diameter sewer lateral shall be installed at a minimum of 1/4 inch of fall per foot.

(4) Six inch diameter and larger laterals shall be at a minimum of 1/8 inch of fall per foot.

:13

B. Sewer Pipe and Fittings.

(1) Scope. This specification designates the general requirement for unplasticized polyvinyl chloride (PVC) plastic pipe with integral bell and spigot joints for the conveyance of domestic sewage. The bell consists of an integral wall section with a factory installed, solid cross section elastomeric ring that allows for expansion and contraction at each joint.

PVC sewer pipe shall be supplied in minimum of 12.5 foot lengths except where connections to manholes or main line wye branches are to be made.

(2) Pipe.

(a) All gravity sanitary sewer pipe shall meet the requirements of ASTM D3034, SDR-35 for pipe sizes four inches in diameter through 15 inches in diameter and less than 20 feet in depth.

(b) For gravity sanitary sewer pipe for 18 inches in diameter through 27 inches in diameter and less than 20 feet in depth, the pipe shall meet the requirements of ASTM F679.

(c) For gravity sanitary sewer pipe larger than 27 inches in diameter and less than 20 feet in depth, the pipe shall be large diameter polyvinyl chloride (PVC) pipe and shall meet the requirements of ASTM F794.

(d) The low pressure sanitary sewer pipe installed from a grinder pump to a manhole or low pressure force main, shall be SDR-21 and meet the requirements of ASTM D2241 with a pipe designation of RT

200. Type 21 Ball Valves shall be used in conjunction with low pressure sanitary sewers.

(e) Sanitary sewer pipe force main pipe shall be ductile iron pipe and shall meet the requirements of special thickness class 52, double cement lined.

(f) For sanitary sewer pipe that is 20 feet in depth, measured from the finish top of ground grade to the top of the pipe, shall be ductile iron pipe, special thickness class 52, double cement lined or heavy wall sanitary sewer pipe SDR-26. The pipe and fittings shall meet ASTM D3034 and ASTM F1336.

(g) Wye connections shall be in accordance with standard Detail

SW-30.

(h) Detectable Mylar Marking Tape. A detectable mylar marking tape shall be installed over all sewer lines by the contractor. It shall be inductively locatable and conductively traceable using standard pipe and/or cable locating devices. Care will be taken to insure that the buried marking tape is Mylar encased aluminum foil. The detectable marking tape will bear the words "CAUTION-SEWER LINE

:14

BURIED BELOW.". The printing will be under Mylar so as to be readable through the clear Mylar. Maximum spacing between the continuous warning message shall be 16 inch — 36 inch. The tape shall be highly visible color and the tape will be color coded in accordance with the American Public Works Association and Utility Location Coordination Council Standards and will be minimum three inches in width. The detectable marking tape will be buried one to two feet below finish grade as is practical for optimum delectability. The tape should be placed into backfill and allowed to settle into place in the backfill.