CANCELLED: Construction of Sportran's Autonomous Vehicle Maintenance Facility
Closed State & local contract opportunity Posted
- Solicitation number
- 26-813
- State
- Louisiana
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Renee Anderson renee.anderson@shreveportla.gov (318) 673-5460
- Angela McNicoll angela.mcnicoll@shreveportla.gov (318) 673-5454
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Shreveport, Louisiana is requesting proposals for construction and development of the Autonomous Intelligent Mobility (AIM) Campus, SporTran's autonomous vehicle maintenance facility, under RFP 26-813, with proposals due October 6, 2026 at 3:00 p.m. Central Standard Time. A 25% Fair Share participation goal applies to the contract.
The scope encompasses site development, building construction, structural, mechanical, electrical, plumbing, and fire/life-safety systems; vehicle circulation and operational areas; fleet charging infrastructure; communications and technology infrastructure; security systems; and associated site and facility improvements. The contract term is 270 calendar days from notice to proceed. Project specifications span 798 pages and plans span 110 pages, prepared by James W. Dean Architect, LLC and Owen Engineering, dated August 17, 2026. Bidders must submit one signed original, five copies, and one searchable electronic copy on USB flash drive. A bid bond equal to 5% of the total bid amount, including all additive alternates, must accompany each proposal. The successful bidder must provide a 100% performance bond, a 50% payment bond, and a two-year 10% maintenance bond.
The estimated project expenditure is $4.8 million. Evaluation criteria are weighted as follows: experience and capacity (0–30 points), qualifications of project personnel (0–20 points), cost effectiveness (0–20 points), demonstrated understanding of project needs (0–10 points), commitment to Fair Share goals (0–10 points), and commitment to Fair Share requirements (0–10 points). Required insurance includes comprehensive general liability ($1 million per occurrence), comprehensive auto liability ($500,000 combined single limit), workers' compensation as required by Louisiana law with $1 million employers liability coverage, and Builders Risk. Contractors must comply with all Fair Share requirements, including good faith efforts documentation, and submit Fair Share participation forms, felony conviction/E-Verify certification, federal provisions, Buy American certification, and lobbying certifications.
Opportunity text
2 versions
Update #2 · Latest ·
The selected construction team will be responsible for construction and development of the AIM Campus in accordance with the projects architectural, engineering, technical, and performance requirements. 1.1 The anticipated work will include, as applicable: 1.1.1 Site Development 1.1.2 Building Construction 1.1.3 Structural 1.1.4 Mechanical 1.1.5 Electrical 1.1.6 Plumbing 1.1.7 Fire/Life-Safety Systems 1.1.8 Vehicle Circulation and Operational Areas 1.1.9 Fleet Charging Infrastructure 1.1.10 Communications and Technology Infrastructure 1.1.11 Security Systems; and 1.1.12 Associated Site and Facility Improvements 2.0 Particular attention will be given to the integration of the facilitys electrical and charging infrastructure with the operational requirements of an autonomous vehicle fleet. 2.1 The project must provide a reliable and maintainable charging environment capable of supporting current fleet requirements while allowing for future expansion as SporTrans autonomous mobility program develops. 3.0 The facility will also require coordination among: 3.1 Building Systems 3.2 Vehicle Operations 3.3 Charging Equipment 3.4 Communications Infrastructure, and 3.5 Autonomous Vehicle Technology 3.6 The construction approach should therefore emphasize: 3.6.1 Quality Control 3.6.2 Systems Integration 3.6.3 Constructability 3.6.4 Safety 3.6.5 Maintainability 3.6.6 Coordination with SporTrans ongoing autonomous mobility initiatives.
Update #1 ·
SCOPE OF WORK 1.0 The selected construction team will be responsible for construction and development of the AIM Campus in accordance with the projects architectural, engineering, technical, and performance requirements. 1.1 The anticipated work will include, as applicable: 1.1.1 Site Development 1.1.2 Building Construction 1.1.3 Structural 1.1.4 Mechanical 1.1.5 Electrical 1.1.6 Plumbing 1.1.7 Fire/Life-Safety Systems 1.1.8 Vehicle Circulation and Operational Areas 1.1.9 Fleet Charging Infrastructure 1.1.10 Communications and Technology Infrastructure 1.1.11 Security Systems; and 1.1.12 Associated Site and Facility Improvements.