Construction of Eastside Bus Transfer Facility

Closed State & local contract opportunity Posted

Solicitation number
RTSX-260043-DS
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 38
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Graceville, Florida is requesting bids for construction of the Eastside Bus Transfer Facility under ITB #RTSX-260043-DS, with bids due July 9, 2026. The procurement spans both Graceville City and Alachua County jurisdiction.

The scope includes design and construction of a new bus transfer facility with detailed architectural, structural, mechanical, electrical, plumbing, and fire-safety systems. Deliverables encompass the complete facility with interior and exterior finishes, HVAC, electrical power and lighting, plumbing supply and waste systems, fire-safety and emergency communications infrastructure, site work, foundations, framing, roof systems, wall sections, storefront glazing, doors, hardware, casework, signage, and furnishings. The construction documents reference 100% completed architectural, structural, and MEP (mechanical, electrical, plumbing) documents, civil addenda, a project manual, and divisional specifications covering general requirements, concrete, masonry, metals, wood and composites, thermal and moisture protection, openings, finishes, equipment, furnishings, specialist work, plumbing, HVAC, electrical, communications, electronic safety and security, and fire safety. Accessibility compliance is required.

The project manual and bid instructions (ITB #RTSX-260043-DS) are available in the Downloads/Attachments tab, along with over 150 construction plan files covering site plans, floor plans, elevations, sections, details, schedules, and riser diagrams across architectural, structural, mechanical, electrical, plumbing, fire-alarm, and landscape disciplines. A permit calculation package is included. Bidders must download all referenced documents from the attachments tab to prepare their bids.

Opportunity text

The city is seeking a qualified construction firm to construct the new Eastside Bus Transfer Facility as described in the Construction Plans and Project Specification documents referenced herein.

*NOTE: Bidder must download the bid document, specifications, construction plans, etc. from the Downloads/Attachments tab.

Files

File Type Posted
COG_RTS_EASTSIDE_DIVISION_09_FINISHES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_09_FINISHES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_09_FINISHES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_09_FINISHES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_08_OPENINGS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_08_OPENINGS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_08_OPENINGS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_08_OPENINGS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_07_THERMAL_AND_MOISTURE_PROTECTION.pdf PDF
COG_RTS_EASTSIDE_DIVISION_07_THERMAL_AND_MOISTURE_PROTECTION.pdf PDF
COG_RTS_EASTSIDE_DIVISION_07_THERMAL_AND_MOISTURE_PROTECTION.pdf PDF
COG_RTS_EASTSIDE_DIVISION_07_THERMAL_AND_MOISTURE_PROTECTION.pdf PDF
COG_RTS_EASTSIDE_DIVISION_06_WOOD,_PLASTICS,_AND_COMPOSITES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_06_WOOD,_PLASTICS,_AND_COMPOSITES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_06_WOOD,_PLASTICS,_AND_COMPOSITES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_06_WOOD,_PLASTICS,_AND_COMPOSITES.pdf PDF
COG_RTS_EASTSIDE_DIVISION_05_METALS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_05_METALS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_05_METALS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_05_METALS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_04_MASONRY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_04_MASONRY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_04_MASONRY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_04_MASONRY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_03_CONCRETE.pdf PDF
COG_RTS_EASTSIDE_DIVISION_03_CONCRETE.pdf PDF
COG_RTS_EASTSIDE_DIVISION_03_CONCRETE.pdf PDF
COG_RTS_EASTSIDE_DIVISION_03_CONCRETE.pdf PDF
COG_RTS_EASTSIDE_DIVISION_01_GENERAL_REQUIREMENTS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_01_GENERAL_REQUIREMENTS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_01_GENERAL_REQUIREMENTS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_01_GENERAL_REQUIREMENTS.pdf PDF
COG_RTS_EASTSIDE_DISIVION_00_INTRODUCTORY_INFORMATION.pdf PDF
COG_RTS_EASTSIDE_DISIVION_00_INTRODUCTORY_INFORMATION.pdf PDF
COG_RTS_EASTSIDE_DISIVION_00_INTRODUCTORY_INFORMATION.pdf PDF
COG_RTS_EASTSIDE_DISIVION_00_INTRODUCTORY_INFORMATION.pdf PDF
COG_RTS_EASTSIDE_DIVISION_29_FIRE_SAFETY_AND_EMERGENCY_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_29_FIRE_SAFETY_AND_EMERGENCY_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_29_FIRE_SAFETY_AND_EMERGENCY_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_29_FIRE_SAFETY_AND_EMERGENCY_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_28_ELECTRONIC_SAFETY_AND_SECURITY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_28_ELECTRONIC_SAFETY_AND_SECURITY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_28_ELECTRONIC_SAFETY_AND_SECURITY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_28_ELECTRONIC_SAFETY_AND_SECURITY.pdf PDF
COG_RTS_EASTSIDE_DIVISION_27_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_27_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_27_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_27_COMMUNICATIONS.pdf PDF
COG_RTS_EASTSIDE_DIVISION_26_ELECTRICAL.pdf PDF
COG_RTS_EASTSIDE_DIVISION_26_ELECTRICAL.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity