Construction of a Pedestrian Bridge Over IL 19/Irving Park Rd.
Open State & local contract opportunity Posted
- Solicitation number
- 61M54
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation (IDOT) is soliciting sealed bids for construction of a pedestrian bridge over IL 19/Irving Park Road, drilled soldier pile retaining walls, multi-use path improvements, and related work on the Main Street Multi-Use Path project in the Village of Roselle, DuPage County, with electronic bids due November 6, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system.
The scope spans 987 feet (0.187 miles) from the intersection of Main Street and Park Street to the Roselle Metra Station South Lot. Work includes the pedestrian bridge structure, soldier pile retaining walls, hot-mix asphalt milling and resurfacing, pavement patching, portland cement concrete sidewalk and curb-and-gutter, earth excavation, drainage structure adjustments, seeding, topsoil placement, landscaping, and light poles with lighting system installation. Bike route signage installation is required from Park Street to Spring Street. Contractors must comply with a Right-of-Entry Agreement with Metra prior to accessing easement premises; associated administrative fees and property access training costs are included in the contract price. Multiple utilities require protection or coordination: water, sanitary sewer, storm sewer, electric, and communication lines.
The specifications incorporate IDOT's Standard Specifications for Road and Bridge Construction (Adopted January 1, 2022, Revised January 1, 2026), the Manual on Uniform Traffic Control Devices (11th Edition with Revision 1, December 2025), and numerous supplemental and special provisions addressing hot-mix asphalt design and production, friction aggregate, mineralized carbon dioxide concrete, drainage and inlet protection, traffic control, utility coordination, tree protection, construction vibration monitoring, and railroad protective measures. Prevailing wage requirements and employment practices standards apply. The contract will be awarded to the lowest responsive and responsible bidder. Bids will be publicly opened from the iCX SecureVault following the 12:00 p.m. deadline.
Opportunity text
The work consists of construction of a pedestrian bridge and multi-use path, drilled soldier pile retaining walls, milling and resurfacing an existing hot-mix asphalt pavement, pavement patching, portland cement concrete sidewalk, earth excavation, portland cement concrete curb and gutter, drainage structure adjustments, seeding, topsoil, landscaping, light poles, lighting system installation, as well as all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. Location: The Main Street Multi-Use Path project is located in the Village of Roselle, DuPage County. The improvement begins at the intersection of Main Street and Park Street, and ends at the Roselle Metra Station South Lot. Along Main Street from Park Street to Spring Street shall consist only of the installation of bike route signage. From the intersection of Main Street and Spring Street to the Roselle Metra Station shall consist of improvements as per the description below. The total gross length is 987 feet (0.187 miles) and the total net length is 987 feet (0.187 miles).
Files
| File | Type | Posted |
|---|---|---|
| ildot 61M54-027.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity