Construction Manager at Risk
Open State & local contract opportunity Posted
- Solicitation number
- RFQ-27-001-0-2027/AW
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Town of Manalapan is requesting Qualification Statements from Construction Manager at Risk (CMAR) firms for demolition and construction of a new combined Town Hall and Police Station at 131 South Ocean Boulevard, with statements due November 5, 2026 at 2:00 p.m. EST. A non-mandatory pre-proposal conference is scheduled for October 14, 2026 at 10:00 a.m. EST at the Town Council Chambers.
The project scope encompasses comprehensive CMAR services across demolition, preconstruction, and construction phases, including cost estimating, project scheduling, site logistics planning, design and constructability reviews, value engineering, community outreach, subcontractor solicitation and procurement, Guaranteed Maximum Price (GMP) development, and overall construction management. The Town prioritizes sustainability considerations: energy- and water-efficient systems, durable materials, renewable energy integration where feasible, a minimum 50-year building lifespan, high indoor environmental quality, waste reduction, sustainable stormwater management, and resilient design practices.
The facility will replace existing structures at the specified location to accommodate the Town's growing operational and public safety needs with modern space and improved functionality. No bid bond is required. The RFQ document is available through DemandStar; thirty-five planholders have registered interest as of the posting date. The solicitation is distributed via local paper and the Town website.
Opportunity text
As part of the relocation of the Town Hall and Police Station, the Town of Manalapan is requesting Qualification Statements from qualified firms to provide Construction Management at Risk (CMAR) services for the demolition of the existing structure and construction of a new combined Town Hall and Police Station facility located at 131 South Ocean Boulevard, Manalapan, FL 33462. Firms interested in providing CMAR services for the project should submit Qualification Statements in accordance with the requirements set forth herein. The firm ultimately selected will be responsible for providing comprehensive Construction Management at Risk services for the project, including all demolition and construction activities, as directed by the Town. The Town of Manalapan is undertaking the expansion and development of a new Town Hall and Police Station to accommodate the growing needs of the community and ensure the Town has adequate facilities to provide essential municipal and public safety services. The project will include the demolition of existing structure(s) and the construction of a new, modern Town Hall and Police Station building to be located at 131 South Ocean Boulevard, Manalapan, FL 33462. The new facility is intended to provide sufficient space, improved functionality, and appropriate infrastructure to support the Towns current and future operational needs and enhance the delivery of services to residents and visitors. In general, the scope of this project includes, but is not necessarily limited to, providing comprehensive Construction Management at Risk services throughout the demolition, preconstruction, and construction phases of the project. Services shall include, but not be limited to, estimating; development and maintenance of project schedules; project reporting; site logistics planning; design and constructability reviews; value engineering; community outreach; solicitation and stimulation of subcontractor interest; subcontractor procurement; development and submission of a Guaranteed Maximum Price (GMP) proposal; and coordination and management of all construction means, methods, and activities. The Town is relying on the expertise of the selected design and construction management firms to evaluate and determine the necessary site improvements, building systems, and infrastructure required to successfully design and construct a new Town Hall and Police Station that meets the current and future needs of the community. The expansion and redevelopment of the site are necessary to accommodate the Towns growing operational needs and to provide adequate, efficient, and reliable municipal and public safety services. In keeping with the Towns commitment to sustainability and responsible stewardship of public resources, consideration shall be given to the following throughout the design and construction of the project: Energy- and water-efficient building systems, fixtures, and construction practices. Durable, sustainable materials and design strategies that minimize resource consumption and reduce long-term operating and maintenance costs. Renewable energy systems, to the extent feasible and economically practicable. A minimum projected building life span of 50 years, with consideration given to durability, adaptability, and long-term resiliency. High indoor environmental quality, including ventilation, air filtration, natural lighting, and the use of low-emitting materials, as appropriate. Efficient and sustainable site management practices, including measures to minimize construction impacts, conserve resources, and reduce waste. Sustainable stormwater management and landscaping practices, where feasible, promote water conservation and minimize environmental impacts. Resilient design and construction practices that consider the long-term performance of the facility and its ability to support the Towns operational needs.
Files
| File | Type | Posted |
|---|---|---|
| manalapan OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity