Construction Demolition & Industrial Waste Hauling

Open State & local contract opportunity Posted

Solicitation number
WC27024
State
California
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Stockton Public Works Department is requesting bids on sidewalk repairs, ADA-compliant curb ramp installation, and curb and gutter repairs at approximately 20 citywide locations under Project No. WC27024, with bids due October 22, 2026 at 2:00 p.m.

The scope includes removal and replacement of concrete sidewalks (23,480 square feet), vertical and rolled curb and gutter (680 and 870 linear feet respectively), driveway aprons (520 square feet), asphalt concrete pavement (300 square feet), and installation of approximately 114 ADA-compliant curb ramps across multiple standard and modified City of Stockton details (R-64, R-65, R-66, and custom designs). Work must be completed within 140 working days from Notice to Proceed, with liquidated damages of $5,200 per day for delays beyond contract completion.

The contractor must hold a current Class A California Contractor License and City of Stockton business license. Required permits and compliance include encroachment permits, construction notification with the San Joaquin Valley Air Pollution Control District, and Construction and Demolition Debris Recycling Reports. Performance and faithful performance bonds are required; the faithful performance bond is retained for 12 months following recordation of the Notice of Completion and may be reduced to 10 percent of actual constructed improvement costs thereafter.

All submittals must be completed within 30 calendar days of Notice of Award, with 15 calendar days allowed for Engineer review and approval. A pre-construction conference will be scheduled following award, and a post-construction conference is required prior to final payment. Bids submitted on non-City forms or that do not bid all items will be deemed non-responsive. The contractor is responsible for all labor, materials, equipment, permits, and fees; no separate payment is provided for materials furnished but not yet installed.

Opportunity text

Description: Sidewalk Repairs & ADA Curb Ramp Installation. The Project includes the installation of ADA-compliant curb ramps and sidewalks, and curb and gutter repairs at various locations Citywide.