Concrete Cutting And Core Drilling At Virginia Key

Closed State & local contract opportunity Posted

Solicitation number
MCC 7360 RPQ No P0299
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Miami-Dade County is soliciting price quotations for concrete cutting and core drilling at Virginia Key under Contract No. MCC 7360, with a mandatory pre-bid meeting at the project site on November 10, 2026 at 10:00 AM and bids due November 12, 2026 at 10:00 AM. No set-aside or preference program applies. The county will award a single-trade lump-sum contract using the Assigned Rotation method.

The scope is coring through concrete walls at various locations, from the pipe gallery between the final stations through the pipe chase, to tap an existing 6-inch flushing water line for new foam sprayers. The work site is 3989 Rickenbacker Causeway. The contractor must obtain and submit all permits before performing any work. The estimated duration is 5 calendar days, with an anticipated start date of November 16, 2026. Specifications are included in the bid documents, but design and shop drawings are not provided.

Required licenses are Concrete Slab Sawing/Core and General Building Contractor. Insurance requirements include workers' compensation as mandated by Florida Statute 440, commercial general liability of at least $300,000 per occurrence and $600,000 in the aggregate, and automobile liability of at least $300,000 combined single limit per occurrence. The contractor must comply with E-Verify and indemnify Miami-Dade County against claims and liabilities arising from performance. No bid bond, performance and payment bond, Davis-Bacon wages, or AIPP is required.

The estimated contract value is $2,000, excluding contingencies and dedicated allowances. Bids must be submitted by fax to Jose Vilaboy at 786-552-8885.

Opportunity text

Core Through Concrete Walls At Various Locations From The Pipe Gallery Between The Final Stations Through To The Pipe Chase Where The Air Line For The Diffusers Run In Order To Tap Into Existing 6" Flushing Water Line For New Foam Sprayers

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors