Competition Pool Replaster Project
Open State & local contract opportunity Posted
- Solicitation number
- 100597
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Dixon is requesting bids for the Competition Pool Replaster Project at the Pat Granucci Aquatics Center, with bids due November 19, 2026 at 3:00 p.m. and bid acceptance opening November 5, 2026 at 9:00 p.m.
The scope includes stripping existing plaster to the concrete substrate, obtaining all required permits, and replacing floor return caps, waterline and gutter cap tile, eight 12-inch racing lanes, VGB-compliant main drain covers, sixteen 12-inch targets, stainless-steel gutter caps, waterline depth markers, deck depth-marker mosaics, international No Diving markers, tile bands and trim at multiple depths and locations, and wall steps. The contractor must carefully remove and reinstall existing pool lights and handrails, reseal the gutter, and apply new white plaster. The contractor is responsible for verifying the scope of work prior to bid submission.
The estimated project cost is $225,000. Contact Austin George at the City of Dixon at (707) 678-7441 for additional information.
Opportunity text
The work will consist of obtaining all required permits and replastering the competition pool at the Pat Granucci Aquatics Center. The existing plaster will be stripped down to the concrete substrate and removed. The contractor will remove and replace the floor return caps, 6-inch by 6-inch standard waterline tile, A-7250 gutter cap tile, eight 12-inch racing lanes, VGB-compliant main drain covers, sixteen 12- inch targets, stainless-steel gutter caps, waterline depth markers on the cantilever face, deck depth-marker mosaics, 8-inch by 8-inch international No Diving markers, the 4- inch tile band at the 4-foot-6-inch depth, tile surrounding the floor returns, three wall steps, trim tile on the shallow-end steps, and all tile on the top step. Existing pool lights and handrails will be carefully removed and reinstalled. The gutter will be resealed, and the pool will receive new white plaster in accordance with the project requirements. Scope of work to be verified by contractor.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity