About this opportunity
Northern Wasco County People's Utility District is requesting sealed bids for furnishing and installing materials to rebuild a two-bay substation in two phases at 1100 East 16th Place, The Dalles, Oregon, under ITB #2026002, with bids due October 13, 2026 (updated from October 20 per the attached bid notice) and attendance at a mandatory pre-bid meeting on September 23, 2026 at 9:00 AM PDT followed immediately by a mandatory site visit — both required to qualify for bid submission.
Phase 1 work includes site development, masonry wall panels with a sliding drive gate, concrete foundations with oil containment, vaults, low and high voltage conduits, grounding, power transformer and control building installation, steel structures, non-segregated bus systems, insulators, and low-voltage wiring. The existing substation remains energized and in service during Phase 1. Phase 2, executed while Phase 1 remains operational, demolishes existing equipment and mirrors Phase 1 scope with modifications including swing and walk gates, temporary isolation fencing, and a second transformer and control building. Project completion is targeted for August 9, 2028; Phase 1 and Phase 2 substantial completion dates will be established post-award. Milestone delivery dates are specified: Transformer 1 by June 17, 2027; Transformer 2 by May 4, 2028; SWGR Metal Clad Building 1 by July 15, 2027; and Building 2 by June 1, 2028.
The contract is awarded on a lump-sum basis with unit-price work components. All workers are subject to prevailing-wage requirements. Bids must include bid, performance, and payment bonds. Liquidated damages are $5,500 per day for Phase 1 or Phase 2 substantial-completion delays and milestone delays, reducing to $1,000 per day for remaining work. Monthly progress payments are made at 95 percent of completed value with 5 percent retainage; upon Phase 2 substantial completion, payments increase to 100 percent less punch-list reserves. A 5-year warranty applies post-acceptance. Bid prices remain firm for 60 days after opening. Combined mobilization and demobilization costs may not exceed 5 percent of the total bid schedule.
Opportunity text
Scope of Work: The Work consists of furnishing and installing all necessary materials involved with rebuilding the two (2) bay substation in two (2) phases. Phase 1 (The existing substation will remain in service until Phase I construction is complete, energized, and placed in service): Site development includes an access driveway, clearing, excavation, grading, backfill, compaction, and installation of site surfacing material. Phase 2 (The Phase I substation facility will be in service during this construction phase): 1. Demolish the equipment in the existing substation. 2. Site development includes an access driveway, clearing, excavation, grading, backfill, compaction, and installation of site surfacing material. Columbia Heights Substation is located at 1100 East 16th Place, The Dalles, Oregon 97058.
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice-Columbia Heights Substation.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity