Bid Notice-Columbia Heights Substation.pdf

PDF 9 MB Posted

Attached to
Columbia Heights Substation
Solicitation number
2026002
Issued by
Wasco County, Oregon

About this file

This is an Invitation to Bid (ITB #2026002) issued by Northern Wasco County People's Utility District for construction of the Columbia Heights Substation located at 1100 East 16th Place, The Dalles, Oregon 97058. The work consists of furnishing and installing all necessary materials involved with rebuilding a two-bay substation in two phases. Phase 1 includes site development with access driveway, clearing, excavation, grading, backfill, compaction, and crushed rock surfacing; installation of masonry wall panels on three perimeter sides with a sliding drive gate; concrete foundations with oil containment system for the transformer; vaults, drainage pipes, low and high voltage conduits, and grounding; power transformer and control building installation; steel structures, non-segregated bus systems, insulators, bus work, surge arresters, and connectors; low-voltage wiring and testing preparation. Phase 2, performed while Phase 1 remains in service, includes demolition of existing equipment, site development similar to Phase 1, masonry wall panels interconnecting with Phase 1 panels with swing and walk gates, temporary isolation fencing, foundations, oil containment system, vaults, conduits, drainage, grounding, transformer and control building installation, steel structures, and bus systems. A mandatory pre-bid meeting is scheduled for Wednesday, September 23, 2026 at 9:00 AM PDT at 2345 River Road, The Dalles, Oregon, immediately followed by a mandatory site visit at the project location. Bidders must attend both events and sign attendance sheets to qualify for bid submission. Sealed bids are due by 2:00 PM PDT on Tuesday, October 20, 2026, and will be opened the same day in the PUD's Board Room. The project completion date is August 9, 2028, with Phase 1 and Phase 2 substantial completion dates to be determined after contractor selection.

The contract is awarded on a lump sum basis with unit price work components as indicated in the bid schedule. Bids must include a bid bond, performance bond, and payment bond. A 5-year warranty period applies after completion and acceptance of work. Liquidated damages are assessed at $5,500 per day for delays in Phase 1 or Phase 2 substantial completion and $5,500 per day for milestone delays (Transformer 1 delivery by 6/17/2027, Transformer 2 by 5/4/2028, SWGR Metal Clad Building 1 by 7/15/2027, and Building 2 by 6/01/2028), reducing to $1,000 per day for remaining work completion delays. Progress payments are made monthly at 95 percent of work completed value with 5 percent retainage prior to substantial completion. Upon substantial completion of Phase 2, payments increase to 100 percent less 200 percent of engineer-estimated punch list work value. Final payment occurs upon completion and acceptance. Interest accrues at 3.5 percent per annum on amounts not paid when due. Prevailing wage requirements apply to all workers. Bid prices must remain firm for 60 days following bid opening. Combined mobilization and demobilization costs shall not exceed 5 percent of the total bid schedule.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

ITB #2026002

for construction of the

COLUMBIA HEIGHTS SUBSTATION

for any information regarding these documents contact:

Cole Isaacson Purchasing Specialist III

Northern Wasco County PUD Phone: 541-298-3323

Email: cole-isaacson@nwascopud.org

Bid Issue Date: Tuesday, September 8, 2026

Bids Due Date: Tuesday, October 20, 2026 @ 2:00 PM PDT or as amended

ITB #2026002

for the construction of

COLUMBIA HEIGHTS SUBSTATION

NORTHERN WASCO COUNTY

PEOPLE’S UTILITY DISTRICT

consisting of:

VOLUME 1

BID REQUIREMENTS

CONTRACT FORMS

CONDITIONS OF THE CONTRACT

TECHNICAL SPECIFICATIONS

GEOTECHNICAL INVESTIGATION REPORT

VOLUME 2

SUBSTATION CONSTRUCTION DRAWINGS

Copyright: Stoddard Power Systems, LLC, 2026 ITB #2026002 Project No.: 26NWCPUD001

Proj. #: 26NWCPUD001 ITB #2026002

00 01 10 i CONTENTS

CONTENTS

VOLUME 1

PAGES

PART 1—BIDDING REQUIREMENTS

00 11 16 INVITATION TO BID ........................................................................... 1.1-1

00 21 16 INSTRUCTIONS TO BIDDERS ............................................................ 1.2-1

00 30 00 VICINITY AND LOCATION MAPS .................................................... 1.3-1

00 41 00 BID FORMS ........................................................................................... 1.4-1

00 43 13 BID BOND .............................................................................................. 1.5-1

00 43 43 PREVAILING WAGE RATES .............................................................. 1.6-1

00 45 13 BIDDERS' EXPERIENCE FORM ......................................................... 1.7-1

00 45 19 NON COLLUSION AFFIDAVIT .......................................................... 1.8-1

PART 2—CONTRACT FORMS

00 52 13 CONTRACT AGREEMENT .................................................................. 2.1-1

00 61 13.13 PERFORMANCE BOND .................................................................... 2.2-1

00 61 13.16 PAYMENT BOND .............................................................................. 2.3-1

PART 3—CONDITIONS OF THE CONTRACT

00 73 00 GENERAL CONDITIONS ..................................................................... 3.1-1

00 74 00 SUPPLEMENTARY GENERAL CONDITIONS .................................. 3.2-1

PART 4—SPECIFICATIONS

GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS ...............................................................4.1-1

01 42 13 ABBREVIATIONS .................................................................................4.2-1

01 77 00 CLOSEOUT PROCEDURES ..................................................................4.3-1

ELECTRICAL SUBSTATION CONSTRUCTION

01 64 00 INSTALLATION OF OWNER FURNISHED EQUIPMENT .............. 4.4-1

03 30 00 REINFORCED CONCRETE .................................................................. 4.5-1

05 12 00 STRUCTURAL STEEL FRAMING ...................................................... 4.6-1

10 14 00 SIGNAGE ............................................................................................... 4.7-1

26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS ...................... 4.8-1

26 01 26 ELECTRICAL TESTING ....................................................................... 4.9-1

26 05 19 LOW VOLTAGE CABLE AND CONDUCTORS .............................. 4.10-1

26 05 33 CONDUITS ........................................................................................... 4.11-1

26 05 43 UNDERGROUND DUCTS AND RACEWAYS ................................. 4.12-1

26 18 29 METAL ENCLOSED NON-SEGREGRATED BUS ........................... 4.13-1

31 20 00 EARTHWORK ..................................................................................... 4.14-1

00 01 10 i CONTENTS

33 70 00 SUBSTATION EQUIPMENT .............................................................. 4.15-1

33 72 26 SUBSTATION BUS AND CONNECTORS ........................................ 4.16-1

33 79 23 SUBSTATION GROUNDING ............................................................. 4.17-1

PART 5—GEOTECHNICAL INVESTIGATION REPORT

VOLUME 2

PART 6—SUBSTATION CONSTRUCTION DRAWINGS

6.1 COLUMBIA HEIGHTS SUBSTATION – Issued For Bid – 2026

6.2 CONTROL BUILDING PRELIMINARY DRAWING PACKAGE

(Shop Drawings to be provided by the building supplier later)

6.3 MANUFACTURER DRAWINGS

(115 kV Circuit Breakers, Power Transformers)

PART 1

PROPOSING REQUIREMENTS

00 11 16 1.1-1

SECTION 00 11 16

INVITATION TO BID

NORTHERN WASCO COUNTY PEOPLE’S UTILITY DISTRICT, hereinafter called the

OWNER, is soliciting bids to perform construction work for the COLUMBIA HEIGHTS

SUBSTATION CONSTRUCTION project. The OWNER’s Columbia Heights Substation is located at 1100 East 16th Place, The Dalles, Oregon 97058. More location information can be found in Section 00 30 00.

Sealed Bids must be addressed to Purchasing Attn: Cole Isaacson and either hand-delivered or mailed to 2345 River Road, The Dalles, OR 97058. Sealed bids must be received no later than

2:00 p.m. PDT, on Tuesday, October 13, 2026. Bids must be submitted in sealed envelopes in accordance with the Instructions to Bidders and identified as “BID #2026002- COLUMBIA

HEIGHTS SUBSTATION”. Sealed Bids must include one flash drive with all electronic documents.

Sealed Bids will be opened at 2:00 p.m. PDT on Tuesday, October 13, 2026, in the PUD’s Board

Room located at 2345 River Road, The Dalles, OR 97058.

A bid that is conditioned upon the Contracting Agency's acceptance of Terms and Conditions different from those contained in this solicitation may be rejected as non-responsive.

Copies of this Invitation to Bid may be obtained from the OWNER by contacting:

Cole Isaacson, Purchasing Specialist III

Email: cole-isaacson@nwascopud.org

Phone: 541-298-3323

The work for the project includes:

Phase 1 (The existing substation will remain in service until Phase I construction is complete, energized, and placed in service):

1. Site development includes an access driveway, clearing, excavation, grading, backfill, compaction, and installation of site surfacing material.

2. Install substation perimeter masonry wall panels on the three exterior sides of the Phase I yard, including a sliding drive gate along E. 16th Ave.

3. The existing fence between the Phase I and Phase II areas will require a minor adjustment and serve as an isolation safety fence between Phases.

4. Construct all foundations and include the oil containment system for the transformer.

5. Install vaults, drainage pipes, LV conduits, HV feeder conduits, and grounding.

6. Install the new power transformer and control building on their foundation pads.

7. Install steel structures, non-segregated bus, rigid bus, bus supports, jumpers, and other equipment to make the physical construction complete.

8. Perform all low-voltage wiring interconnections.

9. Complete preparation and readiness for testing and energization.

10. The PUD will install HV cable, make-up terminations, energize Phase I equipment and transfer load as desired.

00 11 16 1.1-2

Phase 2 (The Phase I substation facility will be in service during this construction phase):

1. Demolish the equipment in the existing substation.

2. Site development includes an access driveway, clearing, excavation, grading, backfill, compaction, and installation of site surfacing material.

3. Install substation perimeter masonry wall panels on the three perimeter sides of the Phase

II yard to interconnect with the Phase I panels, including a swing drive gate and walk gate along E. 16th Ave

4. Remove the existing chain link between Phase I and Phase II and install a temporary isolation fence.

5. Construct all foundations and include the oil containment system for the transformer.

6. Install vaults, drainage pipes, LV conduits, HV feeder conduits, and grounding.

7. Install the new power transformer and control building on their foundation pads.

8. Install steel structures, non-segregated bus, rigid bus, bus supports, jumpers, and other equipment to make the physical construction complete.

9. Perform all low-voltage wiring interconnections.

10. Complete preparation and readiness for testing and energization.

11. The PUD will install HV cable, make-up terminations, energize Phase II equipment and transfer load as desired.

Bids must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to the OWNER as described in the INSTRUCTIONS

TO BIDDERS. Unsigned bid bond forms may constitute grounds for non-responsiveness.

The successful Bidder shall submit payment and performance bonds as indicated in the Contract

Documents. Prices quoted shall remain in effect for a period of 60 days past the bid opening date.

Pursuant to ORS 279B.110, OAR 137-049-0440, and District Policies and Administrative

Regulations, before awarding a Contract, the OWNER may conduct such investigation as it deems necessary to determine whether the apparent low Bidder is responsible and has the experience, capability, financial resources, and capacity to perform the Work. Upon request, the

Bidder shall promptly provide any information the OWNER deems necessary to evaluate the

Bidder's responsibility and qualifications. Failure to provide the requested information may be grounds for determining the Bidder to be non-responsible.

A Contract, if awarded, shall be to the lowest responsive, responsible Bidder in accordance with applicable District Policy, Administrative Regulations, Oregon law and the Solicitation

Documents.

A mandatory pre-bid meeting will be held on Wednesday, September 23, 2026 @ 9:00 AM PDT at the Northern Wasco County People’s Utility District located at 2345 River Road, The Dalles, Oregon, to be immediately followed by a mandatory Columbia Heights Substation site visit on

Wednesday, September 23, 2026 @ located at 1100 East 16th Place, The Dalles, Oregon.

Interested bidders must attend both the mandatory pre-bid meeting and site visit and sign attendance sheet at both locations to qualify to submit a bid.

END OF SECTION

00 21 16 1.2-1 INSTRUCTIONS TO BIDDERS

SECTION 00 21 16

INSTRUCTIONS TO BIDDERS

PART 1 CONTRACT DOCUMENTS

1.1 FORMAT

A. The Contract Documents are divided into parts and sections for convenient organization and reference. There has been no attempt to divide the Specification sections into work performed by the various building trades, work by separate subs, or work required for separate facilities in the project. Each Bidder is responsible for reviewing the Bid and Contract Documents in their entirety including all Work necessary to complete the Project in accordance with this solicitation.

1.2 DOCUMENT INTERPRETATION

A. The separate sections of the Bid Documents are intended to be complementary and shall be construed together to describe and provide the details necessary for the proper completion of the work.

B. The OWNER reserves the right to: (1) reject any or all Bids; (2) reject any Bid that is nonresponsive or submitted by a Bidder determined to be nonresponsible;

(3) waive minor informalities or irregularities in accordance with applicable law;

and (4) postpone the award of the Contract for a period not to exceed sixty (60) calendar days from the date of Bid opening. If the Contract is awarded, it will be awarded to the lowest responsive, responsible Bidder.

1.3 GENERAL DESCRIPTION OF THE PROJECT

A. Columbia Heights Substation is an existing substation. The work consists of furnishing and installing all necessary materials involved with rebuilding the two-bay substation in two phases.

1.4 BIDDER'S UNDERSTANDING

A. Each Bidder is responsible for becoming familiar with the conditions affecting the performance of the Work. Each Bidder shall visit the Project site, examine the site conditions, and thoroughly review the Contract Documents prior to submitting a Bid. Failure to do so will not relieve the successful Bidder of its obligation to execute the Contract and perform and complete the Work in accordance with the Contract Documents. Each Bidder is responsible for independently evaluating all information reasonably necessary to prepare its Bid, including available information regarding site and subsurface conditions.

B. The Geotechnical Investigation Report (GIR) is provided as identified in Part 5 of the Contract Documents. Bidders shall consider the GIR in preparing their Bids.

The contractual status and limitations of the GIR are as set forth in the Contract

Documents.

00 21 16 1.2-2 INSTRUCTIONS TO BIDDERS

C. Each Bidder shall be familiar with all applicable federal, state, and local laws, regulations, ordinances, and codes applicable to the Work. The successful Bidder shall comply with all such requirements in the performance of the Work. These requirements include, but are not limited to, prevailing wage requirements, nondiscrimination laws, occupational safety and health requirements, environmental protection laws, natural resource protection requirements, fire prevention requirements, permit requirements, applicable fees, and other applicable legal requirements.

1.5 TYPE OF BID - LUMP SUM

A. UNIT PRICE

1. When the Bid requires unit prices, the Bidder shall submit a unit price for each item identified in the Bid Schedule, except for items designated as lump sum.

The estimated quantities shown in the Bid Schedule are provided solely for the purpose of Bid evaluation and Contract award and are approximate only. The

Contractor will be paid in accordance to the Contract Documents. The

OWNER reserves the right to increase or decrease the quantities of unit price items as necessary, subject to the Contract Documents and any applicable provisions of the Supplementary Conditions.

B. LUMP SUM

1. When a Bid is to be submitted on a lump sum basis, a single lump sum price shall be submitted in the appropriate place. The total amount to be paid the

Contractor under the Bid Schedule shall be the amount of the lump sum in accordance to the Contract Documents. When required, the Bidder shall furnish, in the space provided in the Bid, a breakdown of the lump sum bid.

PART 2 PREPARATION OF BIDS

2.1 GENERAL

A. All blank spaces in the Bid Form must be filled in, as required, in BLACK ink.

All price information shall be shown in both words and figures where required.

No changes shall be made in the phraseology of the forms. Written amounts shall govern in case of discrepancy between the amounts stated in writing and the amounts stated in figures. In case of discrepancy between unit prices and extended totals, unit prices shall prevail.

B. The Bidder shall acknowledge receipt of all addenda in the Bid. Bids received without acknowledgment of all addenda will be considered informal and may be rejected by the OWNER.

2.2 SIGNATURE

A. The Bidder shall sign the Bid Form in the space provided. If the Bidder is a corporation, the legal name of the corporation shall be set forth above, together with the signature of the officer or officers authorized to sign Contracts on behalf of the corporation. If the Bidder is a partnership, the true name of the firm shall be set forth above, together with the signature of the partner or partners

00 21 16 1.2-3 INSTRUCTIONS TO BIDDERS

authorized to sign Contracts on behalf of the partnership. If the signature is by an agent, other than an officer of a corporation or a member of a partnership, a notarized power-of-attorney must be on file with the OWNER prior to opening of

Bids or submitted with the Bid, otherwise the Bid will be regarded as not properly authorized and may be rejected by the OWNER.

2.3 ATTACHMENTS

A. Bidder shall complete and submit the following forms:

1. Bid Forms

2. Bid Bond

3. Bidder's Experience Form

4. Non-Collusion Affidavit

5. Critical Path Method (CPM) Schedule

2.4 CHANGES IN QUANTITIES

A. The OWNER reserves the right to increase or decrease the amount of any class of unit price work item shown in the Bid per the Contract Documents.

B. Any changes in the lump-sum portion(s) of the project shall be authorized, administered, and compensated through the Change Order process described in the Contract Documents.

2.5 SUBMISSION OF BIDS

A. All Bids must be submitted no later than the time prescribed and in the manner set forth in the Invitation to Bid. Bids must be made on the Bid form provided herewith and submitted intact with the volume containing the Bidding

Requirements, Contract Forms, Attachments, and Conditions of the Contract.

2.6 PRE-CLOSING MODIFICATION OR WITHDRAWAL OF BIDS

A. Pursuant to OAR 137-047-0440, Prior to the time and date designated for receipt of Bids, any Bid submitted may be withdrawn or modified by notice to the party receiving Bids at the place designated for receipt of Bids. Such notice shall follow the process described in OAR 137-047-0440.

2.7 EXCEPTIONS

A. The Bidder shall state in the Bid that they have complied with the Specifications.

If exceptions are taken, they shall be listed under this heading. Printed terms and conditions shall not be considered as exceptions to this Bid Document. The

Bidder may offer alternate designs of equipment if, in his/her judgment, such alternate designs will better and more economically serve the OWNER's service requirements.

00 21 16 1.2-4 INSTRUCTIONS TO BIDDERS

2.8 AWARD OF CONTRACT

A. Pursuant to OAR 137-04-0395, a Notice of Intent to Award shall be issued to all bidders at least seven (7) calendar days before the Award of a Public

Improvement Contract.

B. In the event of failure of the successful Bidder to sign the Contract and provide acceptable Performance and Payment Bonds and insurance certificate(s), the

OWNER may award the Contract to the next lowest responsive responsible bidder.

2.9 BASIS OF AWARD

A. If awarded by the OWNER the award will be made to the lowest responsive responsible bidder.

B. The OWNER reserves the right to reject all Bids, or any Bid not in conformance with the intent of the Contract Documents, and to waive any informalities and irregularities in said Bids. OWNER may exercise such rights in its sole discretion to best serve the OWNER's interests.

2.10 PROTESTS

A. A Bidder must file any protest to the terms, conditions, and specifications of this

Invitation to Bid, including contract terms, within seven (7) calendar days prior to bid opening. Solicitation protests must conform to ORS Chapters 279A and

279C, OAR Chapter 125, and Owner Administrative Regulations.

B. A Bidder must file any protest of contractor award within seven (7) calendar days of the date of OWNER’s notice of intent to award. Award protests must conform to applicable provisions of ORS Chapters 279A and 279C, OAR Chapter 125, and Owner Administrative Regulations.

2.11 EXPERIENCE AND RESPONSIBILITY

A. CONTRACTOR's responsibility shall be determined in accordance with the standards of responsibility set forth in ORS 279B.110 (2). The OWNER will use the Bidder’s Experience Form to evaluate such capability.

2.12 NON-COLLUSION AFFIDAVITS

A. Each bid shall be accompanied by a properly executed non-collusion affidavit on the furnished form.

PART 3 EXECUTION OF CONTRACT

3.1 GENERAL

A. The successful Bidder shall, within ten (10) business days after receiving notice of award, sign and deliver to the OWNER a Contract executed by the successful

Bidder on the form hereto attached together with the acceptable Performance and

Payment Bond and insurance certificates as required in the Contract Documents.

00 21 16 1.2-5 INSTRUCTIONS TO BIDDERS

Within ten (10) business days after receiving the signed Contract with the required bonds from the successful Bidder, the OWNER's authorized agent will sign the Contract. Signature by both parties constitutes execution of the Contract.

3.2 FAILURE TO EXECUTE CONTRACT

A. The Bidder who has a Contract awarded and who fails to promptly and properly execute and return the Contract within the ten (10) business days along with all

Exhibits, Payment and Performance Bonds, and Certificate of Insurance at the specified limits, shall forfeit the Bid security that accompanied the Bid. The Bid security shall be retained as liquidated damages by the OWNER, and it is agreed that this said sum is a fair estimate of the amount of damages the OWNER will sustain in case the Bidder fails to enter into a Contract as hereinbefore provided.

Bid security deposited in the form of cash, a certified check, or cashier's check shall be subject to the same requirement as a Bid bond.

PART 4 CONTRACT BONDS

4.1 PERFORMANCE AND PAYMENT BONDS

A. The successful Bidder shall file with the OWNER separate Performance and

Payment Bonds as required by the Contract Documents. The Surety furnishing this bond shall have a sound financial standing and a record of service satisfactory to the OWNER and shall be authorized to do business in the State of

Oregon.

4.2 POWER-OF-ATTORNEY

A. The Attorney-in-Fact (Resident Agent) who executes this Performance and

Payment Bonds on behalf of the Surety must attach a notarized copy of his/her power-of-attorney as evidence of his/her authority to bind the Surety on the date of execution of the bond.

00 30 00 1.3-1 VICINITY AND LOCATION MAPS

SECTION 00 30 00

VICINITY AND LOCATION MAPS

STATE MAP

VICINITY MAP

Columbia Heights Substation

Project Site

00 30 00 1.3-2 VICINITY AND LOCATION MAPS

DETAIL VICINITY MAP

Address: 1100 East 16th Place, The Dalles, Oregon 97058.

LOCATION MAP

Columbia Height Substation

00 30 00 1.3-3 VICINITY AND LOCATION MAPS

Contractor shall coordinate the staging site with the PUD. Two potential sites are available for consideration:

A. Open and slightly sloped yard across the road from the substation yard.

B. Open yard behind 1905 Oakwood Drive, 0.8 mile from the project site.

STAGING AREA OPTIONS

Option A

Option B

00 41 00 1.4-1 BID FORM

SECTION 00 41 00

BID FORM

To: Purchasing, Northern Wasco County PUD

Address: 2345 River Road, The Dalles, Oregon 97058

Project Title: Columbia Heights Substation

Project No.: 26NWCPUD001

Bidder’s person to contact for additional information regarding their Bid:

Name:

Email:

Telephone:

BIDDER'S DECLARATION AND UNDERSTANDING

The undersigned, hereinafter called the Bidder, declares that the only persons or parties interested in this Bid are those named herein, that this Bid is, in all respects, fair and without fraud, is made without collusion with any official of the OWNER, and is made without any connection or collusion with any person submitting another Bid for this Contract.

The Bidder further declares that they have carefully examined the Contract Documents for the construction of the project, that they have personally inspected the site, that they have confirmed as to the quantities involved, including materials and equipment, and conditions of work involved, including the fact that the description of the quantities of work and materials, as included herein, is brief and is intended only to indicate the general nature of the work and to identify the said quantities with the detailed requirements of the Contract Documents, and that thisBid is made according to the provisions and under the terms of the Contract Documents, which Documents are hereby made a part of thisBid.

Oral interpretations or information shall not be binding upon the OWNER. Formal written bid clarification or Addendum will be issued by the OWNER, as necessary.

The Bidder further agrees that they have made their own analysis and investigation and exercised their own judgment regarding subsurface conditions.

By submitting this Bid, the Bidder certifies that they have not and will not discriminate against any subcontractor in the awarding of a contract on the basis of race, color, sex, sexual orientation, national origin, age, or status as a minority-owned, woman-owned, or emerging small business enterprise (MWESB), in accordance with applicable Oregon Revised Statutes

00 41 00 1.4-2 BID FORM

(ORS) and Oregon Administrative Rules (OAR).

CONTRACT EXECUTION AND BONDS

The Bidder agrees that if this Bid is accepted, they will, within 10 business days, after notice of award, sign the Contract in the form annexed hereto, and will at that time, deliver to the OWNER the Performance and Payment Bonds as indicated in the Contract Documents.

CERTIFICATES OF INSURANCE

The Bidder further agrees to furnish the OWNER, within 10 business days after notice of award of Contract, the Certificate of Insurance with relevant endorsements, waivers, and supporting documentation at the specified limits with Northern WASCO PUD as additional insured as indicated in the Contract Documents.

SHOP DRAWING COMPLETION

The Bidder agrees to submit in accordance with Article 7 of the General Conditions, and in final approved form, the complete set of shop drawings as follows:

Number of working days for first submittal after Commencement Date stated in Notice to

Proceed

Number of working days for OWNER’s review 10

Number of working days for revision and resubmittal of shop drawings 10

Number of working days for OWNER’s review 10

START OF CONSTRUCTION AND CONTRACT COMPLETION TIME

The Bidder further agrees to begin work commencing on the date specified in the Notice to

Proceed. The project will be ready for CONTRACTOR construction as stated in the Notice to

Proceed. The CONTRACTOR shall complete the construction project in its entirety by

August 9th, 2028, or as otherwise amended.

LIQUIDATED DAMAGES

Liquidated Damages will apply as indicated in the Contract Documents.

ADDENDA ACKNOWLEDGEMENT

The Bidder, by signing this Bid, hereby acknowledges that they have received Addenda

Nos. , , , , , , , , , , and agrees that all Addenda issued are hereby made part of the Contract Documents, and the Bidder further agrees that their

Bid includes all impacts resulting from said addenda.

00 41 00 1.4-3 BID FORM

SALES, USE, AND OTHER TAXES

There is no sales tax in the state of Oregon. The Proposer agrees to pay all other applicable

Federal, State, and local taxes for the work herein. These taxes are to be included for all work in the written lump sum bid amount and stated separately as noted.

OWNER-FURNISHED MATERIALS

The LIST OF OWNER-FURNISHED EQUIPMENT describes the equipment that will be furnished by the OWNER. Some of the equipment is to be delivered to the Project site by the

CONTRACTOR from the OWNER’s storage warehouse. The CONTRACTOR will coordinate delivery with the OWNER to the project site and be responsible for its care and handling once accepted. The CONTRACTOR will provide a MATERIALS RECEIPT in writing to the

OWNER.

At the time of delivery or acceptance the CONTRACTOR shall inspect the equipment to its satisfaction that the equipment is in new condition and is undamaged. If the equipment is in new condition and undamaged, the CONTRACTOR shall accept delivery, unload, handle, and transport as necessary at its own expense, unless otherwise stated. If the equipment is damaged, the CONTRACTOR shall notify the OWNER in writing of the equipment condition.

Once accepted by the CONTRACTOR, the CONTRACTOR becomes responsible for the storage, handling, installation, and protection of the equipment at its own expense.

PURCHASE OF MATERIALS NOT FURNISHED BY OWNER

The Bidder will purchase all materials and equipment (other than Owner-Furnished-Equipment) outright and not subject to any conditional sales agreements, bailment, lease, lien or other agreement reserving unto the seller any right, title, or interest therein. All such materials and equipment shall become the property of the OWNER when erected in place. CONTRACTOR shall remain responsible for all of the work, including, without limitation, installation warranty and such materials and equipment, until the work is accepted by the OWNER as complete and the CONTRACTOR has furnished all required contract closeout documentation.

BID ON LUMP SUM AND UNIT COST BASIS

The Bidder understands and agrees to accept as full payment, for the work described in these

Contract Documents, the amounts shown in the following Bid Schedules. The Bidder further agrees that the lump sum price and unit prices represent a true measure of the labor, materials, overhead, and profit required to perform the work or construct the unit described. The breakout of labor and material is required for the OWNER’s information and use in evaluating Bids and to facilitate monthly progress payments. If so requested by the OWNER or ENGINEER, the

CONTRACTOR will substantiate any itemized price or prices with further information.

In the event of a discrepancy between the written lump sum stated and the arithmetic total of the unit price itemization, the lump sum stated in writing shall have precedence.

00 41 00 1.4-4 BID FORM

Where a bid schedule requires unit prices, the Bidder understands that unit quantities indicated are estimated, and that the unit prices are independent of the quantities eventually constructed.

LUMP SUM BID FOR THE COLUMBIA HEIGHTS SUBSTATION CONSTRUCTION

PROJECT

The Bidder agrees to accept as full payment for the lump sum work of each Bid Schedule proposed under this project, as herein specified and as shown on the Drawings, based upon the undersigned's own estimate of quantities and costs, the following lump sum, including all taxes, of:

LUMP SUM BID Dollars and Cents $

(Amount written in words has precedence)

TAXES Dollars and Cents $

(Included in Lump Sum Bid. Amount written in words has precedence.

00 41 00 1.4-5 BID FORM

NORTHER WASCO COUNTY PEOPLE’S UTILITY DISTRICT

THE COLUMBIA HEIGHTS SUBSTATION CONSTRUCTION

BID SCHEDULE

GENERAL REQUIREMENTS

Unit

No.

Name and Description of

Construction Units

No. of

Units

Lot or Unit

Labor

Lot or Unit

Materials

Total Unit

Price Ext. Price

G1. Payment and Performance LS N/A N/A N/A

G2. Insurance LS N/A N/A N/A

G3. Mobilization LS N/A N/A N/A $____________

G4. Demobilization LS N/A N/A N/A

G5. Construction Permit(s) LS N/A N/A N/A

Note: Combined mobilization and demobilization total shall not exceed 5 percent of bid schedule total.

GENERAL REQUIREMENTS SUBTOTAL $____________

00 41 00 1.4-6 BID FORM

SUBSTATION CONSTRUCTION SCHEDULE OF VALUES

Name and Description of

Construction Units

No.

of

Units

Lot or

Unit

Labor

Lot or Unit

Materials

Total Unit

Price Ext. Price

Phase 1

C1-1

Site clearing, excavation, grading, and spoils removal, complete

1 lot $______ $_______ $_______ $___________

C1-2

Furnish and install subgrade fill, compaction, base course, and finish course crushed rock surfacing, complete

1 lot $______ $_______ $_______ $___________

C1-3

Furnish and install access driveway, including grading, culverts, fill, compaction, curbing, and paving, complete

1 lot $______ $_______ $_______ $___________

C1-4

Furnish and install substation masonry wall panels (by

Superior Concrete Product) on the three perimeter sides of the

Phase I yard to include a sliding drive gate along E. 16th Place.

1 lot $______ $_______ $_______ $___________

C1-5

Adjust the existing chain link fence to isolate the Phase I and

Phase II areas.

1 lot $______ $_______ $_______ $___________

C1-6

Construct reinforced concrete foundations, including excavation, compaction, forming, anchor bolts, and testing, complete

1 lot $______ $_______ $_______ $___________

C1-7 Construct the transformer oil containment system, complete 1 lot $______ $______ $______ $___________

C1-8

Furnish and install below grade vaults, LV and HV conduits, and drainage pipes, and ground grid, complete

1 lot $______ $______ $______ $___________

C1-9

Integrate the power transformer and metalclad control building, and all ancillary components, complete

1 lot $______ $______ $______ $___________

C1-10 Furnish and install steel structures complete.

1 lot $______ $______ $______ $___________

C1-11

Furnish and install the non-segregated bus systems, complete

1 lot $______ $______ $______ $___________

C1-12

Furnish and install all LV and

HV insulators, bus work, surge arresters, all fittings, and connectors, and disconnect switches, complete

1 lot $______ $______ $______ $___________

C-13

Furnish and install low voltage circuits to equipment, outdoor lights, and receptacles, complete

1 lot $______ $______ $_______ $___________

00 41 00 1.4-7 BID FORM

Unit

No.

Name and Description of

Construction Units

No.

of

Units

Lot or

Unit

Labor

Lot or Unit

Materials

Total Unit

Price Ext. Price

C-14 Finish preparation and readiness for testing and energization 1 lot $______ $_______ $_______ $___________

Phase 2

C2-1

Disconnect the existing equipment and relocate as directed by the PUD

1 lot $______ $_______ $_______ $___________

C2-2 Remove all existing foundations and subgrade facilities 1 lot $______ $_______ $_______ $___________

C2-3

Furnish and install subgrade fill, compaction, base course, and finish course crushed rock surfacing, complete

1 lot $______ $_______ $_______ $___________

C2-4

Furnish and install access driveway, including grading, culverts, fill, compaction, curbing, and paving, complete

1 lot $______ $_______ $_______ $___________

C2-5

Furnish and install substation masonry wall panels (by

Superior Concrete Product) on the three perimeter sides of the

Phase II yard, to interconnect with Phase I wall panels, and to include a swing gate and walk gate along E. 16th Place.

1 lot $______ $_______ $_______ $___________

C2-6

Remove existing chain link fence separating Phase I and

Phase II, and install a temporary isolation fence.

1 lot $______ $_______ $_______ $___________

C2-7

Construct reinforced concrete foundations, including excavation, compaction, forming, anchor bolts, and testing, complete

1 lot $______ $______ $______ $___________

C2-8 Construct oil containment system, complete 1 lot $______ $______ $______ $___________

C2-9

Furnish and install below grade vaults, LV and HV conduits, and drainage pipes, and grounding grid, complete

1 lot $______ $______ $______ $___________

C2-10

Furnish and install asphalt in the driveway and perimeter as noted in the grounding design, complete

C2-11

Integrate the power transformer and metalclad control building, and all ancillary components, complete

1 lot $______ $______ $______ $___________

C2-12 Furnish and install steel structures complete.

1 lot $______ $______ $______ $___________

C2-13 Furnish and install the non-segregated bus systems, 1 lot $______ $______ $______ $___________

00 41 00 1.4-8 BID FORM

SUBSTATION CONSTRUCTION SUBTOTAL $____________

BID TOTAL $____________

UNIT RATES

Item Description Unit Unit Rate

1 Rock Excavation Hr $

Name and Description of

Construction Units

No.

of

Units

Lot or

Unit

Labor

Lot or Unit

Materials

Total Unit

Price Ext. Price complete

C2-14

Furnish and install all LV and

HV insulators, bus work, surge arresters, all fittings, and connectors, and disconnect switches, complete

1 lot $______ $______ $_______ $___________

C2-15

Furnish and install low voltage circuits to equipment, outdoor lights, and receptacles, complete

1 lot $______ $_______ $_______ $___________

C2-16 Finish preparation and readiness for testing and energization 1 lot $______ $______ $______ $___________

00 41 00 1.4-9 BID FORM

MATERIALS RECEIPT

INSTRUCTIONS: Prepare 3 copies, forward original to OWNER, one copy to CONTRACTOR and one copy to ENGINEER.

Quantity Description Manufacturer & Catalog No.

RECEIVED BY

Representing

RECEIVED FROM

Representing

00 41 00 1.4-10 BID FORM

CONSTRUCTION SCHEDULE

Weather-Related Delays

If “abnormal weather conditions” as set forth in Paragraph 4.05.C.2 of the General Conditions are the basis for a request for an equitable adjustment in the Contract Times, such request must be documented by data substantiating each of the following: 1) that weather conditions were abnormal for the period of time in which the delay occurred, 2) that such weather conditions could not have been reasonably anticipated, and 3) that such weather conditions had an adverse effect on the Work as scheduled.

The existence of abnormal weather conditions will be determined on a month-by-month basis in accordance with the following:

1. Every workday on which one or more of the following conditions exist will be considered a “bad weather day”:

a. Total precipitation (as rain equivalent) occurring between 7:00 p.m. on the preceding day (regardless of whether such preceding day is a workday) through

7:00 p.m. on the workday in question equals or exceeds [threshold precipitation quantity] of precipitation (as rain equivalent, based on the snow/rain conversion indicated in the table entitled Foreseeable Bad Weather Days; such table is hereby incorporated in this SC-4.05.C by reference.

b. Ambient outdoor air temperature at 11:00 a.m. is equal to or less than the following low temperature threshold: [Bidder Enter Temperature ] degrees Fahrenheit; or, at 3:00 p.m. the ambient outdoor temperature is equal to or greater than the following high temperature threshold: [Bidder Enter

Temperature ] degrees Fahrenheit.

2. Determination of actual bad weather days during performance of the Work will be based on the weather records measured and recorded by National Oceanic and Atmospheric

Administration “NOAA” weather monitoring station at The Dalles Municipal Airport

(KDLS)

a. Contractor has anticipated [Bidder Enter Number of Days ]

Foreseeable Bad Weather Days.

b. Every bad weather day exceeding the number of foreseeable bad weather days established above will be considered as “abnormal weather conditions.” The existence of abnormal weather conditions will not relieve Contractor of the obligation to demonstrate and document that delays caused by abnormal weather are specific to the planned work activities or that such activities thus delayed were on Contractor’s then-current Progress Schedule’s critical path for the Project.

00 41 00 1.4-11 BID FORM

BASIS OF PAYMENT`

The CONTRACTOR shall submit to the OWNER a monthly invoice for payment stating the unit prices, unit quantities completed, and percent of Completion for "1 lot" items.

Payment to the CONTRACTOR shall be in accordance with the Contract Documents.

SUBCONTRACTORS

The Bidder further certifies that the following subcontractors will be awarded subcontracts for the following portions of the work in the event that the Bidder is awarded the Contract.

Additional subcontractors or the replacement of the foregoing may only be made with the approval of the OWNER after award of the Contract.

Work to be Performed State Business License Number

Name State CONTRACTOR's Registration Number

Street City State Zip

Work to be Performed State Business License Number

Name State CONTRACTOR's Registration Number

SURETY

If the Bidder is awarded a construction Contract on this Bid, the Surety who provides the

Performance and Payment Bond will be whose address is

00 41 00 1.4-12 BID FORM

BID EXECUTION

Name of Entity submitting Bid ____________________________________________________

The name of the Bidder submitting this Bid is doing business at which is the address to which all communications concerned with this Bid and with the Contract shall be sent.

State CONTRACTOR's Registration Number: ________________________________________

State Business License Number:

The names of the principal officers of the corporation submitting this Bid, or of the partnership, or of all persons interested in this Bid as principals are as follows:

If Sole Proprietor or Partnership

IN WITNESS hereto the undersigned has set its hand this day of , 2026.

Signature of Bidder

Title

00 41 00 1.4-13 BID FORM

If Corporation

IN WITNESS WHEREOF the undersigned corporation has caused this instrument to be executed and its seal affixed by its duly authorized officers this day of , 2026.

(SEAL)

Name of Corporation

By

Title

Attest

Secretary

00 41 00 1.4-14 BID FORM

EXCEPTIONS AND CLARIFICATIONS

00 43 13 1.5-1 BID BOND

SECTION 00 43 13

BID BOND

BOND NO. _______________________

AMOUNT: $______________________

KNOW ALL MEN BY THESE PRESENTS, that hereinafter called the CONTRACTOR (Principal), and a corporation duly organized under the laws of the State of having its principal place of business at and authorized to do a general surety business in the State of Oregon, as SURETY, are held and firmly bound unto Northern Wasco County People’s Utility District, hereinafter called the

OWNER (Obligee), in the sum of _________________________________________________________ DOLLARS

($____________________) for the payment for which we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS BOND IS SUCH THAT:

WHEREAS, the CONTRACTOR is herewith submitting his or its Bid Proposal for the construction of Columbia Heights Substation to the OWNER, said Bid Proposal, by reference thereto, being hereby made a part hereof.

NOW, THEREFORE, if the Bid Proposal submitted by the CONTRACTOR is accepted, and the

Contract awarded to the CONTRACTOR, and if the CONTRACTOR shall execute the proposed

Contract and shall furnish the bond(s) and other submittals as required by the Contract

Documents within the time fixed by the Documents, then this obligation shall be void; if the

CONTRACTOR shall fail to execute the proposed Contract and furnish the required bonds, the

SURETY hereby agrees to pay to the OBLIGEE the said sum as liquidated damages.

00 43 13 1.5-2 BID BOND

Signed and sealed this _____ day of , 20_____.

CONTRACTOR

Attorney-In-Fact

The Attorney-in-Fact who executes this bond in behalf of the SURETY, must attach a copy of their power-of-attorney as evidence of his authority.

00 43 43 1.6-1 PREVAILING WAGE RATES

SECTION 00 43 43

PREVAILING WAGE RATES

All Services under this Agreement are subject to prevailing wage rates and all workers providing labor for the Services shall be paid not less than the prevailing minimum hourly rate of wage for the same character of work in the same trade located in The Dalles Oregon. Contractor will include the requirement to pay prevailing wages as a material provision in every contract with a contractor or subcontractor, to the extent those contracts are permitted and applicable, and will ensure compliance with the prevailing wage requirements.

BOLI does not oversee the District and will not require certified payroll or other reporting activities to be submitted to Oregon State Bureau of Labor & Industries BOLI. BOLI rates are to be paid to employees based on the active rates BOLI posts.

Prevailing Wage Rates for Northern Wasco County in Oregon State are available via the look-up system posted by BOLI.

00 45 13 1.7-1 BIDDER EXPERIENCE FORM

SECTION 00 45 13

BIDDER'S EXPERIENCE FORM

The OWNER requests a statement as to Bidders' experience to be completed and submitted by prospective CONTRACTOR's submitting a bid.

A Corporation

Entity Submitting Experience: A Partnership

(Bidder) An Individual

Principal Office:

Contact Person: ______________________________ Phone Number: _____________________

Email: _____________________________________

EXPERIENCE QUESTIONNAIRE

1. How many years has your organization been in business as a general CONTRACTOR under your present business name?

2. How many years' experience in substation construction work has your organization had:

a) As a general contractor _______;

b) As a subcontractor _______?

3. What experience has your organization had in construction of electric utility substations?

00 45 13 1.7-2 BIDDER EXPERIENCE FORM

4. List major substation construction projects your organization has completed:

Type and Size Contract Name & Address of Project Amount Completed of OWNER

5. Have you ever failed to complete any work awarded to you? If so, where and why?

6. List at least two utilities, corporations, individuals, cities, counties, or states for whom you have performed substation work, and the name of the individual to whom you refer:

7. What is the construction experience of the principal individuals of your organization to be assigned to this project?

Present Years of Magnitude

Individual's Position Construction & Type In What

Name or Office Experience of Work Capacity?

00 45 13 1.7-3 BIDDER EXPERIENCE FORM

8. List the major items of equipment which you own or which will be available for use on the proposed work:

9. List below the contracts which you or your company or corporation have engaged in during the previous 10 years that required court action for settlement:

Proj #: 26NWCPUD001 ITB #2026002

00 45 19 1.8-1 NON-COLLUSION AFFIDAVIT

NORTHERN WASCO COUNTY PEOPLE’S UTILITY DISTRICT

THE DALLES, OREGON

COLUMBIA HEIGHTS SUBSTATION CONSTRUCTION PROJECT

NON-COLLUSION AFFIDAVIT

STATE OF OREGON )

COUNTY OF NORTHERN WASCO )

The undersigned, being duly sworn, deposes and says that the person, firm, association, co-partnership or corporation herein named, has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in the restraining of free competitive bidding in the preparation and submission of a proposal to NORTHERN WASCO

COUNTY PEOPLE’S UTILITY DISTRICT for consideration in the award of a contact on the improvement named above.

Subscribed and sworn to before me this day of , 2026.

Notary Public in and for the

State of Oregon, residing at

PART 2

CONTRACT FORMS

This document is a MODIFIED version of EJCDC® D-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering

Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

AGREEMENT BETWEEN OWNER AND CONTRACTOR

FOR CONSTRUCTION CONTRACT (STIPULATED PRICE)

Agreement #__________

This Agreement is by and between Northern Wasco County PUD (“Owner”) and [name of contracting entity] (“Contractor”).

Terms used in this Agreement have the meanings stated in the General Conditions and the Supplementary Conditions.

Owner and Contractor hereby agree as follows:

ARTICLE 1—WORK

1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:

ARTICLE 2—THE PROJECT

2.01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows: construction of the Columbia Heights Substation.

ARTICLE 3—ENGINEER

3.02 The part of the Project that pertains to the Work has been designed by Stoddard Power Systems

LLC.

ARTICLE 4—CONTRACT TIMES

4.01 Time is of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Contract Times: Dates

A. The Work will be ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before 8/09/2028.

B. Phase 1, as described and defined in General Requirements, will be substantially complete on or before [to be completed after Owner’s review and selection of the Contractor and the Contractor’s projected contract times]

C. Phase 2, as described and defined in General Requirements, will be substantially complete on or before [to be completed after Owner’s review and selection of the Contractor and the Contractor’s projected contract times].

This document is a MODIFIED version of EJCDC® D-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price). Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering

Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

4.04 Milestones

A. Parts of the Work must be substantially completed on or before the following Milestone(s):

1. Milestone 1: Delivery & Start Installation of OFOI Transformer 1 - 6/17/2027

2. Milestone 2: Delivery & Start Installation of OFOI Transformer 2 5/4/2028

3. Milestone 3: Delivery & Start Installation of OFOI SWGR Metal Clad Building 1 7/15/2027

4. Milestone 4: Delivery & Start Installation of OFOI SWGR Metal Clad Building 2 - 6/01/2028

4.05 Liquidated Damages

A. Contractor and Owner recognize that time is of the essence as stated in Paragraph 4.01 above and that Owner will suffer financial and other losses if the Work is not completed and Milestones not achieved within the Contract Times, as duly modified. The parties hereby acknowledge and agree that it would be difficult, if not impossible, to ascertain and quantify the actual damages that the Owner would incur if the Work is not completed within the Contract Times as provided in Paragraph 4.02 above, as such may be revised in accordance with the Contract. Accordingly, it is expressly agreed that liquidated damages payable under the Agreement do not constitute a penalty and that the parties, having negotiated in good faith for such specific liquidated damages and having agreed that the amount of such liquidated damages is reasonable in light of the anticipated harm caused by the breach related thereto, are estopped from contesting the validity or enforceability of the per-day rate of the liquidated damages on the basis that such per-day rate constitutes a penalty or is otherwise unenforceable or invalid. Notwithstanding any provision hereto to the contrary, if Contractor or anyone on its behalf successfully challenges the per-day rate of any liquidated damages, Contractor specifically agrees to pay the Owner all actual damages incurred by the Owner in connection with such breach, including any and all consequential damages (such as loss of profits and revenues, business interruption, loss of opportunity and use) and all costs incurred by the Owner in proving the same, without regard to any limitations whatsoever set forth in the Contract:

1. Substantial Completion Phase 1: Contractor shall pay Owner $5,500.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion of Phase 1, until the Work is substantially complete.

2. Substantial Completion Phase 2: Contractor shall pay Owner $5,500.00 for each day that expires after the time (as duly adjusted pursuant to the Contract) specified above for Substantial Completion of Phase 2, until the Work is substantially complete.

3. Completion of Remaining Work: After Substantial Completion of Phases 1 and 2, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to the Contract) for completion and readiness for final payment,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .