CMAR Invitation to Bid for Cheshire Correctional Heating and Cooling Upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- BI-JA-496-CMR
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Matt Belcher matt.belcher@pdsec.com
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Connecticut Department of Administrative Services (DAS) is soliciting construction bids on behalf of the Construction Manager at Risk (CMR) for heating and cooling upgrades at Cheshire Correctional Institution and two subordinate facilities in Cheshire, Connecticut, with bids due October 23, 2026.
The scope spans a new Boiler House at Cheshire Correctional Institution; replacement of existing HVAC equipment at the Webster Institution and Manson Youth Institution; replacement of underground and in-building heating hot water and chilled water distribution systems across the facility; and supporting mechanical and plumbing work. The work is organized into eleven bid packages covering nineteen CSI divisions. The Master Schedule and Site Logistics Plan are phased to maintain heating and cooling services to the facility and minimize service shutdowns during construction. Bidders must submit bids for their entire assigned bid package on the provided Bid Proposal Form.
The solicitation falls under NAICS 30000000 (Structures and Building and Construction and Manufacturing Components and Supplies) and NAICS 72000000 (Building and Facility Construction and Maintenance Services). Place of performance is 900 Highland Avenue, Cheshire, Connecticut 06410.
Opportunity text
This Notice of CMR Invitation to Bid is provided by DAS/CS on behalf of the CMR for this DAS/CS Project: Cheshire Correctional Heating and Cooling Upgrades located at 900 Highland Avenue, Cheshire, CT 06410. The work described in the Bid Documents is for the construction of a new Boiler House at Cheshire Correctional Institution, replacement of existing HVAC equipment at the Webster Institution, replacement of existing HVAC equipment at the Manson Youth Institution, replacement of the existing underground heating hot water and chilled water site distribution systems across the site, replacement of the existing heating hot water and chilled water distribution systems to air handling units inside of occupied buildings. The Master Schedule and Site Logistics Plan are phased to maintain heating and cooling services to the facility and to minimize heating and cooling shutdowns. The entire Work in this project consists of eleven (12) Bid Packages for nineteen (19) CSI Divisions. Bidders are requested to submit bids for their entire Bid Package on the Bid Proposal Form. Solicitation Categories Structures and Building and Construction and Manufacturing Components and Supplies (30000000) & Building and Facility Construction and Maintenance Services (72000000)
Files
| File | Type | Posted |
|---|---|---|
| BI-JA-496-CMR Notice of CMR Invitation to Bid 08.31.2026.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity