Clarifiers Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- 75054
- State
- Vermont
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Chelsea Mandigo chelsea@essexjunction.org (802) 878-6943
Opportunity details come from vermontbusinessregistry.com. Updated .
About this opportunity
The City of Essex Junction is requesting sealed bids on the Clarifiers Rehabilitation Project at the Water Resource Recovery Facility, with bids due August 27, 2026 at 2:00 p.m. local time.
The scope includes rehabilitation of Primary Clarifier #1 and Secondary Clarifier #1, encompassing steel immersion treatment on walls, rake arms, and miscellaneous piping; concrete floor work including grout injection to stop water infiltration, resurfacing, and lining. Two alternates are available: Alternate A adds atmospheric steel work on Primary Clarifier #1 (Specification Section 2.02.B); Alternate B adds a concrete launder trough on Secondary Clarifier #1 (Specification Section 2.02.C). The work is performed at 35 Cascade Street in Essex Junction, Vermont.
Sealed bids are submitted at the City of Essex Junction offices, 2 Lincoln Street, Essex Junction, Vermont. The referenced bid document (Clarifier Rehab bid 08122026.pdf) was unavailable for review, and the source does not disclose estimated contract value, contract term, incumbent information, evaluation criteria, question deadlines, or pre-bid meeting details. Interested bidders should request complete bid documents and specifications directly from the City of Essex Junction offices.
Opportunity text
Sealed bids on forms prepared by the City of Essex Junction will be received by the City of Essex Junction at the City of Essex Junction offices, located at 2 Lincoln Street in Essex Junction, Vermont, until 2:00 p.m. (local time) on 08/ 27 /2026 for the Clarifiers Rehabilitation project. The contract generally includes the following work items at the Water Resource Recovery Facility located at 35 Cascade Street in the City of Essex Junction: Primary Clarifier #1 • All steel in immersion including walls, rake arms and any miscellaneous piping. This does not include the steel-effluent channels. • Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. ADD ALTERNATE A • Add all atmospheric steel on Primary Clarifier #1. See Specification Section (2.02.B.) Secondary Clarifier #1 • All steel in immersion including drum, rake arms and any miscellaneous piping. • Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. ADD ALTERNATE B • Add concrete launder trough on Secondary Clarifier #1. See Specification Section (2.02.C.)
Files
| File | Type | Posted |
|---|---|---|
| Clarifier Rehab bid 08122026.pdf | ||
| Clarifier rehab bid revised 08202026.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity