City of Roswell - Multiple parks playground system replacement

Closed State & local contract opportunity Posted

Solicitation number
PE-66079-NONST-2026-000000058
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Roswell, Georgia is soliciting qualified playground design organizations and licensed contractors to provide design and installation services for playground system replacement at five municipal parks, with proposals due July 24, 2026. The total project budget is $1.5 million inclusive of all materials, labor, freight, demolition, site work, surfacing, and overhead.

The scope encompasses comprehensive design, demolition, site preparation, equipment supply, surfacing installation, and warranty services at Rowell Area Park, Groveway Community Park, Sloan Street Park, East Roswell Park, and Garrard Landing Park. Playgrounds must serve age-appropriate structures for children ages 2–5 and 5–12 with emphasis on ADA compliance and inclusive play features. All work must comply with ASTM F1487 standards, CPSC Public Playground Safety Handbook, 2010 ADA Standards for Accessible Design, and IPEMA certification requirements. Equipment specifications require commercial-grade powder-coated steel, stainless steel hardware, and UV-stable plastic components with a minimum 15-year warranty on posts and structural components. Safety surfacing options include Engineered Wood Fiber or Poured-in-Place rubber, with third-party CPSI inspection required prior to final acceptance.

Proposals must include detailed cost breakdowns per park, equipment specifications, project schedules, warranty information, minimum three municipal project references, proof of insurance, and contractor licensing documentation. Evaluation criteria include design quality, durability and lifecycle value, inclusive play features, cost competitiveness, municipal project experience, warranty strength, and installation timeline. The design review period extends through August 5, 2026, with Notice to Proceed and Substantial Completion dates to be determined. All proposals must be submitted through the City of Roswell bidding system via https://www.roswellgov.com/business/procurement-opportunities/.

Opportunity text

The City of Roswell is seeking qualified playground design organizations to provide detailed designs for the playground design and equipment replacement at five (5) area parks. All proposals must be submitted using the City of Roswell bidding system. Please visit the City of Roswell purchasing web page for instructions on how to register at https://www.roswellgov.com/business/procurement-opportunities/

Files

File Type Posted
Playground Replacement Project _26 SOW.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity