Playground Replacement Project _26 SOW.docx
DOCX document 27 KB Posted
- Solicitation number
- PE-66079-NONST-2026-000000058
- Issued by
- Chatham County, Georgia
About this file
This is a Scope of Work document for the City of Roswell, Georgia's Playground Replacement Project, detailing design and installation services for five municipal parks. The City seeks qualified playground manufacturers and licensed contractors to provide comprehensive design, demolition, site preparation, equipment supply, surfacing installation, and warranty services for playgrounds at Rowell Area Park, Groveway Community Park, Sloan Street Park, East Roswell Park, and Garrard Landing Park. The project encompasses age-appropriate structures serving children ages 2-5 and 5-12, with emphasis on ADA compliance, inclusive play features, and commercial-grade durability. Proposals must be submitted by July 24, 2026, with a design review period extending through August 5, 2026, followed by a Notice to Proceed and Substantial Completion dates to be determined. Contractors must provide detailed cost breakdowns per park, equipment specifications, project schedules, warranty information, minimum three municipal project references, proof of insurance, and contractor licensing documentation.
The total project budget is $1,500,000, inclusive of all materials, labor, freight, demolition, site work, surfacing, and contractor overhead. Proposals will be evaluated based on design quality, durability and lifecycle value, inclusive play features, cost competitiveness, municipal project experience, warranty strength, and installation timeline. All work must comply with current ASTM F1487 standards, CPSC Public Playground Safety Handbook, 2010 ADA Standards for Accessible Design, and IPEMA certification requirements. Equipment specifications require commercial-grade powder-coated steel, stainless steel hardware, UV-stable plastic components, and minimum 15-year warranty on posts and structural components. Safety surfacing options include Engineered Wood Fiber or Poured-in-Place rubber, with third-party CPSI inspection required prior to final acceptance. Interested parties must register through the City of Roswell purchasing website at https://www.roswellgov.com/business/procurement-opportunities/.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ROSWELL
Recreation, Parks, Historic, and Cultural Affairs Department Scope of Work – Playground Replacement Project (5 Parks – Total)
1. PROJECT OVERVIEW
The City of Roswell is seeking proposals from qualified playground manufacturers and/or licensed playground contractors to provide design, demolition, site preparation, equipment, surfacing, installation, and warranty for the replacement of five (5) existing playgrounds located at:
· Rowell Area Park
· Groveway Community Park
· Sloan Street Park
· East Roswell Park
· Garrard Landing Park The total project budget is $1,500,000, inclusive of all materials, labor, freight, demolition, site work, surfacing, contingency, and contractor overhead.
2. PROJECT OBJECTIVES
The City desires playgrounds that:
· Provide inclusive, unique, ADA-compliant play experiences
· Serve multiple age groups (2–5 and 5–12 unless otherwise specified)
· Emphasize durability and long-term maintenance efficiency
· Improve drainage and surfacing performance
· Enhance visual appeal and park identity
· Meet or exceed all applicable safety standards
3. STANDARDS & COMPLIANCE
All work shall comply with:
· Current ASTM F1487 standards
· Current CPSC Public Playground Safety Handbook
· ADA / 2010 ADA Standards for Accessible Design
· IPEMA certification for all play components
· Georgia erosion & sediment control requirements (if applicable) Contractor shall provide certification documentation prior to final acceptance.
4. SCOPE OF SERVICES
4.1 Design Phase
Contractor shall:
· Provide conceptual design for each park
· Conduct one (1) design meeting per park with City staff
· Provide 3D renderings
· Provide color palette options
· Provide inclusive play components
· Provide site layout with fall zones and ADA routes identified
· Provide stamped engineered drawings if required City reserves right to request revisions.
4.2 Demolition & Removal
Contractor shall:
· Remove all existing playground equipment
· Remove existing surfacing (EWF, PIP, turf, etc.)
· Remove concrete footings to minimum 12” below grade
· Dispose of materials legally – recycling metal when applicable
· Protect adjacent trees and site features
4.3 Site Preparation
Contractor shall:
· Fine grade play areas
· Improve drainage as needed
· Install sub-base (min. 6” compacted aggregate unless otherwise specified)
· Install geotextile fabric if required
· Adjust surrounding grades to ensure positive drainage away from play area (If sites have native soils like athletic fields, may want to specify compaction testing and proof-rolling.)
4.4 Playground Equipment
Each playground shall include:
· Separate age-appropriate structures (2–5 and 5–12) where space allows
· Climbing components
· Slides (minimum two per major structure)
· Swing set (belt + inclusive seat)
· Shade element (integrated or standalone)
· Sensory play panels
· Ground-level play components
· At least one ADA transfer platform
· Inclusive spinner or motion element Equipment must:
· Be commercial grade
· Powder-coated steel (G90 galvanized or better)
· Stainless steel hardware
· UV-stable plastic components
· Minimum 15-year warranty on posts and structural components
4.5 Safety Surfacing
Contractor shall provide pricing for:
· Primary Option: Engineered Wood Fiber that is certified play safe (EWF)
· Alternate Option: Poured-in-Place (PIP) rubber surfacing Surfacing must:
· Meet fall height requirements
· Be ADA accessible
· Include proper drainage layer
· Include perimeter containment system
4.6 Site Amenities (As Applicable)
Provide pricing for:
· New border/curbing
· Concrete ADA access path connections
· Benches
· Trash receptacles
· Bike racks
· Shade structures (if not integrated)
· Protective fencing (if needed)
· Signage (rules + emergency contact)
4.7 Installation
Contractor shall:
· Install equipment per manufacturer specifications
· Provide certified playground safety installer
· Provide on-site supervision at all times
· Coordinate inspections
· Restore disturbed turf areas
· Remove all debris daily
4.8 Inspections & Closeout
Contractor shall:
· Provide third-party CPSI inspection prior to final acceptance
· Provide as-built drawings
· Provide warranty documentation
· Provide maintenance manuals
· Conduct staff walkthrough/training
5. PROPOSAL REQUIREMENTS
Proposals shall include:
1. Detailed cost breakdown per park
2. Equipment specifications
3. Project schedule
4. Proposed timeline (start to completion)
5. Warranty information
6. References (minimum 3 municipal projects)
7. Proof of insurance
8. Contractor license information
6. PROJECT SCHEDULE
Proposed timeline:
· Proposal Due: July 24, 2026
· Design Review Period: July 24, 2026 – August 5, 2026
· Notice to Proceed: TBD
· Substantial Completion: TBD
7. EVALUATION CRITERIA
Proposals will be evaluated on:
· Design quality
· Durability and lifecycle value
· Inclusive play features
· Cost
· Experience with municipal projects
· Warranty strength
· Installation timeline
File details come from the government source that posted it. Updated .