- The Kansas Department of Transportation (KDOT) is soliciting electronic bids for chip seal surface treatment on a 9.369-mile section of US Route 36 in Norton County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date (August 18, 2026). All contractors and...
- The Kansas Department of Transportation is soliciting sealed bids for chip seal application on US-77 in Cowley County from the north city limit of Winfield to the junction of K-15, a total net length of 9.821 miles, with bids due August 19, 2026. The scope includes surface preparation, application of asphalt emulsion, and placement of aggregate chips on the designated highway section. Pricing is submitted on a unit-price basis. The contract will be awarded to the lowest qualified bidder...
- The Kansas Department of Transportation is requesting sealed bids for chip seal surfacing on two roadway segments in Comanche County under a project combining US-160 KA 8032-01 (Clark/Comanche County Line to Comanche/Barber County Line) and US-160 KA 8033-01 (Kansas/Oklahoma State Line to US-160/US-183 junction), with a combined net length of 49.252 miles. Bids are due August 19, 2026. The scope encompasses surface preparation, chip seal material application, and associated work required to...
- The State of Kansas is requesting bids for chip seal surfacing on K9 highway in Norton County, extending 16.153 miles from the NT/DC CL East to the West K9/US283 Junction, with bids due August 19, 2026. The scope is chip seal road maintenance and surfacing on the specified K9 corridor. Work is performed in Norton County, Kansas. The bid notice establishes framework for competitive bidding and specifies contractor qualifications, pricing terms, and contract award criteria. The attached Bid...
- The Kansas Department of Transportation is requesting bids for chip seal surface treatment on US-160 in Harper County, with bids due August 19, 2026. The project encompasses two sections totaling 25.615 miles: KA 7847-01 from the Barber/Harper County Line to the junction of US-160 and K-14 on K-2, and KA 8009-01 from the North City Limits of Anthony to the junction of US-160 in Harper County. The scope is the application of chip seal surfacing to the specified roadway segments. The bid notice...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for grading, bridge, and surfacing work on K-55 in Sumner County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The project involves construction of Bridge 117 over the Arkansas River and Bridge 118 over Antelope Creek, located 8.39 and 9.2 miles east of US-81 respectively, spanning 0.063 miles total. Scope encompasses common and road items, temporary project water control and soil erosion measures, bridge...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 017 over Franks Creek and B Road (3.13 miles east of I-70/US-40B West Junction) and Bridge 019 over US-40B/K-57 at the K-57/I-70 Junction in Geary County, with proposals due August 19, 2026 at 1:00 p.m. Local Time. The scope encompasses excavation, concrete work, structural steel fabrication, bridge construction and repair, asphalt and concrete surfacing, rumble strips,...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 002 over Milford Lake Road in Geary County, with proposals due August 19, 2026 at 1:00 p.m. through the Bid Express website and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project...
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay work on K-61 in Pratt County, with bids due August 19, 2026 at 1:00 p.m. Local Time and opening at 3:00 p.m. the same day. Contractors must be prequalified with KDOT and submit electronic proposals exclusively through Bid Express using AASHTO's Project Bids software; contractors must also register as bid holders by 5:00 p.m. on the Monday preceding the letting date. The project covers 16.812...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on K-61 in McPherson County, with electronic proposals due August 19, 2026 at 1:00 P.M. Local Time via Bid Express. Prequalified contractors only are eligible to bid — this is a mandatory eligibility filter. The project covers repair and reconstruction of Bridge 100 (0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, at the junction of US-81 ALT/K-61) over a project length of...
The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is soliciting electronic bids for chip seal construction on K-27 highway in Cheyenne County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day. The project covers 21.106 miles of K-27 from the West US36/K-27 junction north to the Kansas/Nebraska state line. Work includes mobilization, flagger services, traffic control, chip seal application, cover material (CM-L-2) application, flexible raised pavement markers, emulsified asphalt (CRS-1HP) placement, and water provision for flexible pavement. The project is restricted to 15 days to open to unrestricted traffic, with a total contract duration of 25 working days. The earliest start date is June 1, 2027; the latest start date is August 9, 2027. Contractors must be prequalified with KDOT, obtain a current Tax Clearance Certificate from the Kansas Department of Revenue, and demonstrate financial capacity to complete the work. Bidders must notify KDOT of their intent to bid as a prime contractor by 5:00 p.m. on the Monday preceding the letting date. Proposals must be submitted electronically through Bid Express using AASHTO's Project Bids software. Contract execution must occur within ten business days of award notification. Site inspection and verification of material availability and work quantities are required before bidding. Set prices are established for mobilization and flagger services at $30.00 per hour and water provision at $40.00 per gallon. Contractors may accept or reject the emulsified asphalt price adjustment provision. Required certifications include noncollusion, debarment history, financial prequalification verification, and tax clearance documentation. The project is funded exclusively by state funds with no federal aid. Special provisions address environmental compliance, traffic control, work zone safety, materials certification, and stormwater pollution management.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Chip Seal - K-27 Cheyenne County.pdf | 3MB | 8/16/26 |