Cheyenne Boulevard & Westgate Road, Trunk Sanitary Sewer Main Extension
Closed State & local contract opportunity Posted
- Solicitation number
- 23003
- State
- South Dakota
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Box Elder, located in Pennington County, South Dakota, is soliciting bids for the Cheyenne Boulevard & Westgate Road Trunk Sanitary Sewer Main Extension project (City 23-003 / TDG 24-006). The procurement involves constructing over 18,500 linear feet of new trunk sanitary sewer main, including various pipe sizes ranging from 8-inch to 27-inch, with associated manholes and appurtenances. The project scope includes four utility bores (one under Highway 1416, two under railroad right-of-way, and one under Box Elder Creek), relocation of approximately 1,150 linear feet of 16" PVC water main, grading of future rights-of-ways, developing a graveled path, and improving local drainage crossings. Bids are due on Tuesday, April 29, 2025, at 2:00 pm local time, with a pre-bid conference scheduled for April 15, 2025, at 1:30 pm at Box Elder City Hall. The project is segmented into multiple bid schedules, with substantial completion dates ranging from September 30, 2025, to November 6, 2026.
The contract opportunity includes specific set-aside designations and compliance requirements for Disadvantaged/Minority Business Enterprises (DBE/MBE) and Women's Business Enterprises (WBE), with goals of 1.0% for MBE and 4.0% for WBE. Bidders must adhere to Davis-Bacon wage rates, American Iron and Steel provisions, and requirements that all iron and steel products be produced in the United States. The project is partially funded by the Office of Local Defense Community Cooperation, Department of Defense, and may utilize American Rescue Plan Act (ARPA) funds. Contractors must comply with federal requirements, including provisions related to telecommunications equipment and domestic preference. While no specific incumbent vendors are mentioned, bidders must obtain bidding documents from Towey Design Group, Inc. for a $50 deposit per set. The project will be bid on a unit price basis, with bidders required to provide pricing for various construction activities across four separate schedules, though the total project budget is not explicitly stated in the provided documentation.
Opportunity text
Constructing over 18,500 If of new trunk sanitary sewer main. This includes approximately 960 If of 27- inch, 930 If of 24-inch, 2,125 If of 18-inch, 1,080 If of 15-inch, 2,000 If of 12-inch, 2,800 If of 10-inch, 8,770 If of 8-inch sanitary sewer main, and associated manholes and other appurtenances. The work will also include four utility bores for project, one under the eastbound lane of Highway 1416, two under the railroad right-of-way and the last under Box Elder Creek. Also, the project requires the relocation of approximately 1,150 If of 16" PVC Water Main grading of future rights-of-ways and developing a graveled path along the new trunk sewer main, and improvements to local drainage crossing will also be required.
Files
| File | Type | Posted |
|---|---|---|
| 2025.04.04 CB_WG Addendum No. 1.pdf | ||
| 2025.02.13 - CBWG Project Manual.pdf | ||
| 20250403 - Ad for Bid - Signed.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity