2025.04.04 CB_WG Addendum No. 1.pdf

PDF 132 KB Posted

Attached to
Cheyenne Boulevard & Westgate Road, Trunk Sanitary Sewer Main Extension
Solicitation number
23003
Issued by
Pennington County, South Dakota

About this file

Addendum #1 for the Cheyenne Boulevard and West Gate Road Trunk Sanitary Sewer Main Extension City Project, issued by the City of Box Elder and Towey Design Group, Inc., modifies the original contract documents for a major infrastructure project. The addendum, dated April 4, 2025, updates key details for the upcoming bid on Tuesday, April 29, 2025, at 2:00 P.M. (MST), with the pre-bid meeting relocated to Towey Design Group's office at 147 Chisholm Road. Significant changes include removing Segments 5, 6, 7, and 8 from the current bid package, which will be bid as a future project, resulting in the deletion of multiple construction plan sheets related to these segments.

The addendum also revises the warranty terms, replacing the original one-year material and labor warranty with a new requirement for a warranty bond or equivalent surety at 10% of the total project cost, securing a two-year warranty period. The project involves constructing new trunk sanitary sewer main, including various pipe sizes ranging from 8 to 27 inches, utility bores, water main relocation, and associated infrastructure improvements. The bid location remains at Box Elder City Hall, with the City Engineer Scott Lange overseeing the project, and the engineer of record being Towey Design Group, Inc.

View the file

Other files

File Type Posted
20250403 - Ad for Bid - Signed.pdf PDF
2025.02.13 - CBWG Project Manual.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cheyenne Boulevard and West Gate Road Trunk

Sanitary Sewer Main Extension City Project

Addendum #1

Addendum #1 to the Contract Documents, Project Specifications and Drawings for

Project: Cheyenne Boulevard and West Gate Road Trunk Sanitary

Sewer Main Extension City Project 23.030.000 / TDG 24-006

Owner: City of Box Elder

City Engineer: Scott Lange

420 Villa Drive

Box Elder, SD 57719

Engineer: Towey Design Group, Inc.

147 Chisholm Drive, Bid Location: Box Elder City Hall

420 Villa Drive

BID DATE: Tuesday April 29, 2025, 2:00 P.M. (MST)

DATE OF ADD #1: April 4, 2025

SCOPE: This addendum covers the following additions, deletions, modifications, and clarifications to the Contract Documents, Plans and Specifications. The addendum consists of two (2) pages.

CHANGES/CARIFICATIONS/ADDITIONS/DELETIONS TO PLANS AND SPECIFICATIONS

SECTION DESCRIPTION

CONTRACT DOCUMENTS Advertisement for Bid Page 2 of 3

Revise Pre-Bid Meeting Location:

The pre-bid meeting will be held at the office of Towey Design

Group 147 Chisholm Road, Box SD instead of Box Elder City Hall.

STANDARD SPECIFICATIONS Section 01.45.23.06 Warranty

Remove A. Provide a minimum one (1) year warranty for all materials and labor, covering defects in the materials or deficiencies resulting from contractor installation.

Replace with A. A warranty bond, or other equivalent surety, in an amount equivalent to ten percent (10%) of the total cost of the project/improvement has been provided to the City to secure the warranty for a period of two years.

Cheyenne Boulevard and West Gate Road Trunk

Sanitary Sewer Main Extension City Project

Addendum #1

CONSTRUCTION PLANS It has been determined that Segments 5, 6, 7, & 8 will be bid as a future project and therefore are not required at this time.

Remove the following sheets:

Sheet 008 – Estimate of Quantities (3)

Sheet 009 – Estimate of Quantities (4)

Sheet 010 – Estimate of Quantities (5)

Sheets 500 – 509 – Segment 5 sheets

Sheets 600 – 611 – Segment 6 sheets

Sheets 700 – 706 – Segment 7 sheets

Sheets 800 – 806 – Segment 8 sheets

END OF ADDENDUM #1