Chalk Bluff MCC Improvement
Closed State & local contract opportunity Posted
- Solicitation number
- WA-2026-535
- State
- Nevada
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Truckee Meadows Water Authority (TMWA) is requesting sealed bids for electrical and infrastructure improvements at the Chalk Bluff Water Treatment Plant, with bids due October 7, 2026 at 2:00 p.m. via the NGEM online bidding system and an optional pre-bid conference and site visit on September 24, 2026 at 10:00 a.m. at 9605 S. McCarran Boulevard, Reno, Nevada.
The scope includes four primary components: modifying and replacing the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building; replacing existing 25 kV load-break elbows within transformers, switches, and underground vaults; replacing existing fault indicators within transformers, switches, and underground vaults; and installing concrete aprons at various underground vault locations. All labor, materials, equipment, and incidentals are the contractor's responsibility.
Evaluation will follow Nevada Revised Statute 338.147. Bids are opened electronically; results and tabulation will be posted on NGEM with electronic notification to bidders. Hard copy and facsimile submissions are not accepted. Bids received after the 2:00 p.m. deadline will be rejected. Bidding documents, contract documents, specifications, and drawings are available through TMWA Procurement Services and the TMWA website (tmwa.com). The project is designated PWP #WA-2026-535.
Opportunity text
Truckee Meadows Water Authority (TMWA) is accepting sealed bids for all labor, materials, equipment, and incidentals required to (1) modify and replace the existing 480V, 300A motor control center (MCC) main section with a new 600A MCC main section at the Decant Building; (2) replace existing 25 kV load-break elbows within existing transformers, switches, and underground vaults; (3) replace existing fault indicators within existing transformers, switch, and underground vaults; and (4) install concrete aprons at various underground vault locations
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity