CAVEA Lighting
Open State & local contract opportunity Posted
- Solicitation number
- DQ1 GMAA 2027000142 2
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- NIGP code
Updated .
About this opportunity
Auraria Higher Education Center is soliciting quotes on behalf of Metropolitan State University of Denver for theatrical lighting upgrades at the CAVEA Theater in Denver, Colorado, with quotes due November 30, 2026 at 2:00 p.m. Mountain Time. Preference goes to Colorado resident bidders, and Addendum 1 (dated November 11, 2026) requires Colorado labor to perform at least 80% of the work. The DQ form in the same package states the 80% requirement does not apply to MSU Denver projects.
The scope replaces existing track-head fixtures with individually addressable, DMX-controlled fixtures, installs an updated lighting control station, and performs associated electrical work, including connection to the existing lighting control system and occupancy sensors. Contractors must field-verify existing conditions and complete a first-fixture mock-up, which requires at least five working days' notice for engineer review. Existing track will not be reused and must be fully replaced per the project drawings. The contractor supplies any required adapters or mounting hardware and any access panels beyond the four existing ones.
Minimum qualifications include two years of operation under the same business name, demonstrated completion of at least two similar projects each exceeding $140,000 in hard costs, attendance at the mandatory pre-bid conference and site tour, and a one-page qualifications summary. That conference was held November 4, 2026, so bidders must have attended it to qualify. Bid security must be a bid bond and power of attorney or proposal guaranty of not less than 5% of the total bid. For contracts of $150,000 or more, payment and performance bonds of not less than 50% of the contract value are required, with bond costs included in the bid.
Award intent notification is anticipated for December 3, 2026, with purchase order issuance on December 1, 2026. Addendum 1 sets on-site construction between March 18 and April 4, 2027, with the theater fully operational by April 5, 2027. One hard copy of the complete quote package must be delivered by the deadline, and late quotes will be rejected.
Files
Show all 20
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity