Carter Crossing Water Line Installation
Closed State & local contract opportunity Posted
- Solicitation number
- PE-33084-NONST-2026-000000004
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72121505 Waste water and sewage treatment plant construction service
- 83100000 Utilities
- 95121810 Irrigation and flood control waterworks
- 83101802 Supply of two phase electricity
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
- 83101803 Supply of three phase electricity
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
Show all 27
- 95121805 Well
- 95121804 Water tower
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 81102400 Electrical power transmission engineering
- 83101800 Electric utilities
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- Point of contact
-
- Brice Doolittle bdoolittle@esginc.net (706) 485-5252
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Eatonton-Putnam Water and Sewer Authority (EPWSA) is soliciting sealed bids for the construction of the Carter's Crossing Water Line Installation project in Polk County, Georgia. This procurement involves the installation of approximately 2,800 linear feet of 8-inch water main, including fire hydrant installation, clearing and grubbing operations, gravel driveway removal and replacement, asphalt removal and replacement in impacted areas, and erosion and sediment control measures utilizing silt fences and mulch. Sealed bids must be received by 1:00 PM on March 5, 2026 at the EPWSA office located at 663 Godfrey Road, Eatonton, GA 31024, where bids will be publicly opened and read. Complete digital specifications and contract documents are available through QuestCDN.com (project number 10047354) for a nonrefundable download fee of $200, and bidders must be registered with Quest/ESG Engineering, Inc. as having purchased the complete bidding documents for their proposal to be considered. Any contractor submitting a bid must hold a valid Georgia State contractor license and must not withdraw their bid for sixty days following the closing deadline. Technical questions regarding the project should be directed to Andrew Kelly at akelly@inframark.com or Brice Doolittle, the Project Manager at ESG Engineering, LLC.
The project is funded through local funds and contains no identified set-aside designations for disadvantaged enterprises or specific organizational restrictions beyond the requirement for valid Georgia State contractor licensing. Bids must be accompanied by a bid bond or certified cashier's check equal to at least 5 percent of the base bid, with the surety company holding a minimum "A" rating and financial strength of at least five times the contract price. The successful bidder will be required to provide Performance and Payment Bonds each in the amount of 100 percent of the contract price, along with a Power of Attorney authorizing the surety to bind the contract. The EPWSA reserves the right to reject any or all bids, including nonconforming, nonresponsive, unbalanced, or conditional bids, and may reject any bidder deemed unqualified or of doubtful financial ability. No specific award value or budget range has been disclosed in the available procurement documents.
Opportunity text
Sealed Bids: Sealed bids for construction of the project entitled Carters Crossing Water Line Installation will be received until 1:00 PM, March 5, 2026 at the Eatonton-Putnam Water and Sewer Authority (EPWSA), 663 Godfrey Rd, Eatonton, GA 31024 at which time and place they will be publicly opened and read. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. 2. Work To Be Done: The Work to be completed for the Carters Crossing Water Line Installation is described briefly as follows: In general, construction shall consist of installation of approximately 2,800 LF water main in total. The main size will be 8¿. The project includes installation of fire hydrants, clearing and grubbing, gravel driveway removal/replacement, and asphalt removal/replacement for impacted areas. Also, silt fences and mulch will be used for erosion and sediment control. 3. Plans, Specifications and Contract Documents: Complete digital specifications and contract documents are available at www.QuestCDN.com. You may view the digital documents for free by entering the Quest project number 10047354 on the website¿s project search page. The fee to download the digital documents is $200 (non-refundable) payable through the website. A bidder¿s proposal will not be considered by the Owner unless the Bidder is on record with Quest/ESG Engineering, Inc. as having purchased and received complete Bidding Documents. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading, and working with digital project information. Any other questions can be directed to the issuing office, ESG Engineering, LLC. attention Andrew Kelly akelly@inframark.com. 4. Contractor License: Any Contractor submitting a bid must be licensed by the State of Georgia. See Instructions to Bidders for additional bidding requirements. 5. Bonds: Bids shall be accompanied by a bid bond or certified cashier
Files
| File | Type | Posted |
|---|---|---|
| 00100 _ ADVERTISEMENT FOR BIDS _ with Quest_.doc | DOC document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity