Camp Creek Outfall Replacement - Phase 1
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-PME-12
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141126 Underground utilities construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
Opportunity details come from ccwa.bonfirehub.com. Updated .
About this opportunity
Clayton County Water Authority is requesting bids on the Camp Creek Outfall Replacement – Phase 1 Project, with bids due October 8, 2026. The project requires an experienced licensed utility contractor to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer to replace an existing 30-inch gravity-flow sanitary sewer, including multiple reconnections of smaller existing sewers.
The project is located at 1600 Battle Creek Road, Morrow, Georgia. Addendum 2 extended the Final Addendum Date to October 1, 2026; the Bid Opening Date remains October 8, 2026 at 3:00 p.m. Respondents must sign and include acknowledgment of receipt of both Addendum 1 and Addendum 2 in their proposals. Pre-bid meetings were conducted; attendance records exist for prospective bidders who reviewed project documentation prior to submission.
No contract value, contract term, incumbent contractor, set-aside or preference program, evaluation criteria weighting, or financial details are specified in the available documents. Bidders must review the complete RFB (1-2026-PME-12) and both addenda for technical specifications, site conditions, contractual obligations, bid submission procedures, and compliance requirements.
Opportunity text
The Clayton County Water Authority (CCWA) intends to contract with an experienced licensed utility contractor to complete the Camp Creek Outfall Replacement - Phase 1 Project. The purpose of the Project is to install approximately 14,453 linear feet of new 36-inch and 30-inch gravity-flow sanitary sewer replacing an existing 30-inch gravity-flow sanitary sewer. Multiple reconnections of smaller existing sewers will be required to complete the work.