Cambridge Junction Bridge - Flood Damage Repair
Closed State & local contract opportunity Posted
- Solicitation number
- 58356
- State
- Vermont
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from vermontbusinessregistry.com. Updated .
About this opportunity
The state of Vermont, specifically Chittenden County and Johnson Village, is seeking contractors for the Cambridge Junction Bridge (Bridge #29) flood damage repair project. The procurement opportunity, posted on September 25, 2023, with proposals due by October 16, 2023, requires comprehensive structural repair work resulting from flood damage sustained in July 2023. Specific repair requirements include installing new 1" x 8" siding boards, repairing the downstream stone abutment, and performing adjustments to tension rods. Potential bidders should be experienced in bridge restoration, structural repair, and have expertise in handling flood-damaged infrastructure. Contractors must demonstrate technical capabilities to successfully complete the detailed repair specifications, with a focus on restoring the bridge's structural integrity and functionality. The contract requires precise workmanship, adherence to engineering standards, and the ability to complete repairs efficiently within the specified timeframe.
While specific set-aside designations are not explicitly detailed in the provided documentation, contractors should be prepared to potentially demonstrate compliance with local or state small business or disadvantaged business enterprise requirements. The contract appears to be a targeted infrastructure repair project with scope limited to the Cambridge Junction Bridge, suggesting a relatively focused scope of work. Though the exact budget range is not specified, flood damage repair projects typically require specialized contractors with civil engineering and structural repair expertise. The project's location in Chittenden County and Johnson Village indicates a localized procurement opportunity that may prioritize vendors familiar with Vermont's infrastructure and regional construction standards. Interested contractors should carefully review the full bid documentation and be prepared to provide detailed technical proposals demonstrating their capability to perform the specified bridge repair work.
Opportunity text
The Cambridge Junction Bridge (#29) needs repair as a result of the July 2023 flooding. Repairs include installation of new 1" x 8" siding boards, downstream stone abutment repair, and repair/adjustments to tension rods.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity