Building E Flooring - 1st Floor
Closed State & local contract opportunity Posted
- Solicitation number
- IFB#11112026_E
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Sandy Schwendeman sschwendeman@mchenry.edu (224) 833-0953
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
McHenry County College is soliciting sealed bids under Invitation for Bid for removal and replacement of first-floor flooring in Building E, with bids due November 11, 2026 at 10:30 a.m. and public opening at 10:35 a.m. the same day in Building A, Room 217. Bidders must provide all information required under the Minority Enterprise Program as a minimum qualification. The Business Enterprise Program sets a 30 percent aspirational goal for participation by minority-, women-, and disability-owned certified vendors. This is a prevailing wage project subject to the Davis-Bacon Act and Illinois Prevailing Wage Law.
The contractor must remove and dispose of existing flooring and install new flooring across approximately 5,400 square feet, plus 40 square feet for the elevator. Quantities are estimates that the contractor must field-verify before ordering materials. The contractor supplies all labor, materials, equipment, substrate preparation, and installation. The specified products are Shaw Contract luxury vinyl tile in three designations: LVT-1 (Inlet Style, Raw), LVT-2 (Branching Out Style, Riverside Oak), and LVT-3 (Inlet Style, Thistle). No substitutions are permitted without prior written approval. A Walkerduct access system runs beneath the hallway, and the contractor must mark and verify its access points. Minimum qualifications include five years of comparable work experience. Required insurance includes commercial general liability and commercial automobile liability of $1 million per occurrence each, plus workers' compensation under Illinois law. Contracts exceeding $50,000 require a performance bond for the full contract amount.
The College will award to one or multiple vendors based on a best-value determination. Pricing must break out materials, labor, miscellaneous costs, and shipping, with a grand total, and remain effective for 60 to 120 days. Work occurs during winter break, Monday through Friday, 6:00 a.m. to 6:00 p.m. Payment terms are Net 30 from invoice date, subject to monthly approval. The College is exempt from sales tax. Bids must be submitted in sealed, opaque envelopes by U.S. mail or hand delivery only, as electronic submissions are not accepted.
Opportunity text
Flooring contractor to remove and replace the existing flooring on the 1st floor of the E Building. The estimated project area is approximately 5,400 square feet, with an additional 40 square feet for the elevator. These quantities are estimates only and shall be field verified by the contractor prior to ordering materials or beginning work. The contractor shall provide all labor, materials, equipment, flooring removal, disposal, substrate preparation, installation, and related services necessary to complete the project
Files
| File | Type | Posted |
|---|---|---|
| mchenry county college Flooring Building E 1st Floor.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity