Bridge Rehabilitation- W-26-002- Stony Brook Road over the Stony Brook
Closed State & local contract opportunity Posted
- Solicitation number
- 608861-136560
- State
- Massachusetts
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Town of Westford, Massachusetts is requesting bids on bridge rehabilitation for Stony Brook Road over Stony Brook (Project W-26-002), with bids due October 14, 2026. Bidders must hold pre-qualification status from the Massachusetts Department of Transportation in the BRIDGE - CONSTRUCTION category to be eligible.
The scope includes installation of a cast-in-place concrete relieving slab and bridge barriers with moment slabs, cast-in-place guardrail transitions with stone veneer, and minor repairs to the existing arch structure. The approaches on Stony Brook Road will be reconstructed to accommodate the proposed structure and connect to existing infrastructure. The road profile over the bridge will be raised approximately 21 inches, requiring full-depth construction to extend approximately 170 feet south of the bridge to 115 feet north of the bridge.
The solicitation document (WESTFORD-608861-136560-CDSP.pdf, posted September 27, 2026) contains detailed technical specifications and construction requirements. Specific contract value, contract term, and other contractual provisions are referenced through attached exhibits and supporting documentation not detailed in the summary.
Opportunity text
Bidders must be pre-qualified by the Department in the BRIDGE - CONSTRUCTION category to bid. The work under this Contract consists of the installation of a cast in place concrete relieving slab and bridge barriers with moment slabs and cast in place guardrail transitions with stone veneer to the Stony Brook Road bridge (W-26-002). The work also includes minor repairs to the existing arch. The approaches on Stony Brook Road will be reconstructed to accommodate the proposed structure and meet into existing infrastructure. The profile of Stony Brook Road, over the bridge, is proposed to be raised approximately 21 inches, this requires the limits of full depth construction to extend from approximately 170 feet south of the bridge to 115 feet north of the bridge. See attached.
Files
| File | Type | Posted |
|---|---|---|
| WESTFORD-608861-136560-CDSP.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity