About this file
This is a Construction Scope of Work document for the Town of Westford, Massachusetts, detailing bridge rehabilitation work on Stony Brook Road (Project W-26-002). The project involves installation of a cast-in-place concrete relieving slab and bridge barriers with moment slabs, cast-in-place guardrail transitions with stone veneer, and minor repairs to the existing arch structure. The approaches on Stony Brook Road will be reconstructed to accommodate the proposed structure, with the road profile raised approximately 21 inches over the bridge. Full depth construction limits extend approximately 170 feet south of the bridge to 115 feet north of the bridge to integrate with existing infrastructure. Bidders must be pre-qualified by the Department in the BRIDGE - CONSTRUCTION category to submit proposals.
The document provides detailed technical specifications and construction requirements for the bridge rehabilitation work. Specific pricing terms, contract duration, award dates, and other contractual provisions are referenced through attached exhibits and supporting documentation. The project represents standard municipal infrastructure improvement work requiring specialized bridge construction expertise and pre-qualification status from qualified contractors.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .