Bridge deck overlay, bridge joint replacement, bridge deck repairs and guardrail replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 74D73
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is requesting bids on bridge deck overlay, bridge joint replacement, bridge deck repairs, and guardrail replacement on Illinois Route 32 in Moultrie County, with bids due September 18, 2026 at 12:00 p.m. via the iCX (Integrated Contractors Exchange) system. The work is federal-aid funded under project designation STP-MHVA(512).
The project scope spans approximately 1,100 feet at Structure Number 070-0049 crossing the West Okaw River, 1.1 miles northwest of Foster Road near Lovington. Work includes 0.15 miles of HMA resurfacing for bridge approach transitions, replacement of expansion joints with new strip seals, full-depth deck patching, scarification, and concrete overlay; abutment corbel work and new approach slabs; guardrail updates and replacement; and traffic control including changeable message signs that must be in place a minimum of 14 days prior to any lane closure. The specifications incorporate by reference the Standard Specifications for Road and Bridge Construction (adopted January 1, 2022, revised January 1, 2026) and supplemental specifications addressing concrete overlay preparation and placement, surface testing and grinding, bridge deck grooving, pavement marking, and work zone traffic control.
Bidders must comply with state and federal law requirements, including disadvantaged business enterprise (DBE) participation requirements and environmental compliance provisions. The contract will be awarded to the lowest responsive and responsible bidder; IDOT reserves the right to reject any or all proposals. Prequalification rating is not the sole determinant of contractor responsibility. The project is located in IDOT District 7. Electronic bids will be publicly opened immediately upon the September 18 deadline.
Opportunity text
This project consists of 0.15 miles of HMA resurfacing for the transitions to the bridge approach slab. The proposed project consists of bridge deck overlay, bridge joint replacement, and bridge deck repairs. This work consists of replacing the expansion joints with new strip seals, full depth deck patching, scarification, concrete overlay, abutment corbels, and new approaches. Guardrail updates and replacement will also be completed along with traffic control and any other work necessary to complete the section. Location: This project is located in Moultrie County on IL 32 on SN 070-0049 at the West Okaw River, 1.1 miles northwest of 850E (Foster Rd) just north of Lovington totaling approximately 1100 feet.
Files
| File | Type | Posted |
|---|---|---|
| ILDOT 74D73-076.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity