Briarwood Demolition
Open State & local contract opportunity Posted
- Solicitation number
- ITB #26-2933
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Denton County is soliciting proposals from qualified and experienced firms for demolition services at Briarwood Retreat, with responses due November 12, 2026. The work covers complete demolition and removal of nine existing structures and one in-ground swimming pool, plus partial demolition of one existing structure, as identified in Exhibit C.
The contractor must handle all demolition, removal, debris disposal, and site cleanup in accordance with the specifications, site-specific requirements, and applicable federal, state, and local laws. Structures and components designated to remain must be protected from damage, and each work area must be left in the condition specified in the applicable demolition requirements. The Final Specifications document (2933 Final Specs.pdf, 226KB, posted October 27, 2026) sets the technical, safety, environmental, and site-restoration standards and must be reviewed alongside the Scope of Work and Exhibit C.
The opportunity is listed under Denton County (FIPS 48121) in Texas, with two Amarillo City entries (FIPS 4837503000 and 4838103000) also tagged to the notice.
Opportunity text
Denton County intends to secure a contract with a qualified and experienced firm to provide demolition services at Briarwood Retreat. The project includes the complete demolition and removal of nine (9) existing structures and one (1) in-ground swimming pool, as well as the partial demolition of one (1) existing structure, as identified in Exhibit C. The Contractor shall perform all demolition, removal, debris disposal, site cleanup, and related work in accordance with the specifications, site-specific requirements, and applicable federal, state, and local laws and regulations. All structures and components designated to remain shall be protected from damage during the Work. Upon completion, each work area shall be left in the condition specified in the applicable demolition requirements.
Files
| File | Type | Posted |
|---|---|---|
| 2933 Final Specs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity