Boynton Harbor Marina Fuel System Electrical Conduit & Piping Sump Repairs
Closed State & local contract opportunity Posted
- Solicitation number
- ITB No. 27-014B
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Boynton Beach, Florida is soliciting bids under Bid No. 26-112B for fuel system electrical conduit and piping sump repairs at Boynton Harbor Marina in Palm Beach County, with bids due November 23, 2026. Compliance with Florida Administrative Code 62-761 (Florida UST Regulations) and 40 CFR Part 280 is the primary technical filter, and bidders must demonstrate it through the regulatory standards listed below.
The scope replaces corroded rigid metal conduit with marine-grade rigid aluminum conduit, replaces deteriorated electrical fittings, and removes and replaces electrical conduit and fuel/vent piping entry boots. It also repairs product piping entry boots at the gasoline and diesel storage tank platform sumps using ICON material, and raises all electrical fittings and seal-offs to at least 6 inches above the finished dock or concrete surface. The contractor must coordinate and pass all inspection hold points with the Engineer, the Owner, and a Florida Department of Environmental Protection representative. Required standards include the 2023 Florida Building Code and Florida Fire Prevention Code (both 8th Edition), NFPA 30, 30A, and 303, and the NEC (NFPA 70). Designs follow MDM Drawings G-1.0, G-2.0, and G-3.0, dated April 29, 2026.
The contractor furnishes all labor, equipment, materials, transportation, engineering, shop drawings, permits, bonds, securities, licenses, and insurance required to complete the work as specified.
Opportunity text
The work includes the replacement of all corroded rigid metal conduit (RMC) with marine-grade Rigid Aluminum Conduit, replacement of deteriorated electrical fittings, removal and replacement of electrical conduit and fuel/vent piping entry boots, repair of product piping entry boots at the gasoline and diesel STP sumps using ICON, raising of all electrical fittings and seal-offs to a minimum of 6 inches above the finished dock/concrete surface, coordinate and pass all required inspection hold points with the Engineer, Owner, and Florida DEP representative. The project includes repairing all other items as necessary to correct existing deficiencies as well as repairing the design as shown on MDM Drawings G-1.0, G-2.0, and G-3.0 (dated 04-29-2026), in support of compliance with FAC 62-761 and 40 CFR Part 280. The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, furnishing all transportation and services, and essential communications, etc., as necessary to complete the project, as indicated in the Special Conditions, Special Provisions, Project Design Plans, Technical Specifications and Bid No. 26-112B Documents herein, along with all engineering, shop drawings, and other documentation necessary to obtain all applicable permits and all bonds, securities, licenses and insurance to complete the project as specified herein and within the Project Design Plans. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications/scope of work and all applicable federal, state, county and local regulatory requirements including but not limited to FAC 62-761 (Florida UST Regulations); 40 CFR Part 280; 2023 Florida Building Code, 8th Ed.; 2023 Florida Fire Prevention Code, 8th Ed.; NFPA 30, 30A, 303; NEC (NFPA 70).