Boyd Gym Floor Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 3176
- State
- Mississippi
- Responses due
Opportunity facts
- Jurisdictions
- UNSPSC codes
- 57040200 Recreational kits
- 49151605 Curling stone
- 49000000 Sports and Recreational Equipment and Supplies and Accessories
- 49170000 Gymnastics and boxing equipment
- 49140000 Watersports equipment
- 49150000 Winter sports equipment
- 49220000 Sports equipment and accessories
- 49160000 Field and court sports equipment
- 49210000 Other sports
- 49151606 Curling broom
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The state and local contract opportunity pertains to the Boyd Gym Floor Replacement project located at the Utica Campus in Hinds County, Mississippi. The procurement is specifically managed within the jurisdiction of Weir Town, with a contract opportunity ID of 67f7ba93a5d1bef4ab08775e. The project was initially posted on July 25, 2019, with a proposal submission deadline of August 29, 2019. While the detailed specifications are not fully available due to the limited information in the attached PDF file, the opportunity appears to be a construction or renovation procurement focused on replacing the gymnasium floor. Potential bidders would likely need to demonstrate expertise in commercial flooring installation, specifically for athletic facilities. The project seems to require specialized floor replacement services, potentially involving surface preparation, installation of new flooring materials, and ensuring compliance with educational facility standards.
Without access to the complete file details, it is challenging to definitively state specific set-aside designations or precise organizational restrictions for bidders. The procurement is located in Hinds County, which might suggest potential preferences for local or Mississippi-based contractors, though this cannot be confirmed without additional documentation. The project's location at a campus suggests potential requirements for working in an educational environment, which could necessitate background checks, adherence to safety protocols, and minimal disruption to institutional operations. The attached file indicates a 10MB document size, which implies potentially complex project specifications. While an exact budget range is not provided, gymnasium floor replacement projects typically range from $50,000 to $250,000 depending on the facility size and specific material requirements. Interested contractors would need to carefully review the complete bid documentation to understand the full scope of work, qualifications, and submission requirements.
Opportunity text
Boyd Gym Floor Replacement at our Utica Campus
Files
| File | Type | Posted |
|---|---|---|
| 3176BoydGymFloorReplacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity