The Washington State Parks and Recreation Commission is requesting bids for furnishing and installing three galvanized steel piles with fiberglass bird caps and removing two existing creosote-treated timber piles at the Alta Lake State Park boat launch, with sealed bids due September 29, 2026 by 1:00 p.m. through the MRSC Bonfire Procurement Portal. Prevailing wage requirements apply to all bidders, and registered Washington State contractor licensing is mandatory.

Voluntary diversity goals are established at 10% for Minority Business Enterprises, 6% for Women's Business Enterprises, 5% for Washington Small Businesses, and 5% for Veteran-owned businesses; these are participation goals rather than set-asides.

The scope requires vibratory hammer driving of three 10-inch galvanized steel piles to a penetration of twelve feet into competent bearing soil or a minimum of seven feet with refusal, equipment mobilization, and removal of two existing creosote-treated timber piles. Performance is located at Alta Lake State Park in Okanogan County. The project is scheduled to begin September 8, 2026 with a targeted completion date of February 28, 2027, allowing thirty calendar days from substantial completion for final work.

The estimated bid range is $56,790 to $69,410. A bid bond equal to 5% of the base bid amount is required for bids exceeding $35,000. Subcontractor listings are not required given the project cost.

A pre-bid virtual meeting is scheduled for Tuesday, September 15, 2026 at 10:00 a.m. via Microsoft Teams. Sealed bids submitted electronically must include properly completed bid proposal forms, the Bidder Compliance Form, Bid Form, and MWBE certification.

Opportunity text

This project includes the furnishing and installing three galvanized steel piles with fiberglass bird caps, as well as removing two existing creosote-treated timber piles.