Block Level Lead Service Line Replacement (LSLR) Project: W. Eastwood: N. Albany Ave. to N. Sacramento Ave.
Closed State & local contract opportunity Posted
- Solicitation number
- 76307
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Luis Bejar luis.bejar@cityofchicago.org (312) 744-7284
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Chicago Department of Water Management is soliciting sealed bids on a Block Level Lead Service Line Replacement (LSLR) Project on West Eastwood Avenue from North Albany Avenue to North Sacramento Avenue, with bids due October 6, 2026 at 11:00 a.m. Central Time. The solicitation is restricted to Small Local Business Enterprises (SBI-2) and requires appropriate certification, affidavits, and documentation supporting small business status.
The scope includes water service line replacements, sewer work, meter installations, and related infrastructure improvements across multiple properties in Chicago. Work encompasses 31 line items: mobilization; traffic control; televised sewer inspection; test holes; replacement of existing sewers with ductile iron pipe; house drain replacements with PVC pipe; new exterior and interior water service installations using both trenchless and open cut methods; installation of 5/8-inch, 1-inch, 1.5-inch, and 2-inch meters and meter interface units (MIUs) for automated meter reading; soil waste disposal; and temporary surfacing. All plumbing demolition and installation work must be performed by a Chicago Licensed Plumber. The contractor must perform not less than 25% of the total work value with its own forces; subcontractors require Chief Procurement Officer approval. Water meters, MIUs, encoder screw bits, and meter seals are supplied by the Commissioner of Water Management; the contractor must furnish all other materials, tools, and equipment.
Contract term is 110 calendar days from start of work. A 5% bid deposit calculated on the total base bid is required; the first and second apparent low bidders must deliver original executed deposits within two business days following bid opening. A performance bond equal to 33% of the contract value is required. The project is funded through IEPA/City sources.
The pre-solicitation conference is September 3, 2026 at 10:00 a.m. Central Time at Sawyer Water Purification Plant. Questions are due September 15, 2026 at 3:00 p.m. Bids are submitted through the City's iSupplier eProcurement portal. Contact Luis Bejar, Buyer, at Luis.Bejar@cityofchicago.org or 312-744-7284.
Opportunity text
A. All new water service line installations shall receive a new meter regardless of whether or not the home is currently metered. If an existing meter is removed, it shall be salvaged and delivered to the location specified by the Commissioner. B. The scope of work for this Section includes: 1) the installation of 5/8 inch and 1 inch water meters and meter interface units (MIUs) for automated meter reading on accounts that are presently unmetered and; 2) the installation of 5/8 inch, 1 inch, 1 1/2 inch and 2 inch meters and meter interface units (MIUs) for automated meter reading on accounts that are presently metered in order to replace the existing metering equipment. All work will be at various locations throughout Chicago. The placement and installation of meters at each individual site must be performed as indicated in the specifications and must comply and conform to all applicable federal, state, municipal laws and regulations. C. Water meters, meter interface units (MIUs), encoder screw bits, and meter seals will be supplied by the Commissioner of Water Management. All other materials (including but not limited to plumbing hardware required for meter installations, and meter pit enclosures and covers) must be provided by the Contractor. D. The Contractor must furnish all supplies, materials, tools and equipment necessary for the successful and timely completion of all meter and MIU installations under this Contract as specified herein, except for the following items: water meters, meter interface units, seals and seal crimping tools, which will be furnished by the Commissioner. E. All plumbing demolition and installation work shall be performed by a Chicago Licensed Plumber.
Files
| File | Type | Posted |
|---|---|---|
| city of chicago block level lead service line replacement w eastwood.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity