About this opportunity

This state and local contracting opportunity is for the Buford Highway CIP Replacement - Section C project, posted by Gwinnett County, Georgia. The project involves the installation of approximately 11,500 linear feet of 16-inch ductile iron pipe (DIP) water main along Buford Highway between Old Peachtree Road and Sugarloaf Parkway. The scope includes branch connections, tie-ins, abandonment of existing cast iron water mains, service line reconnections, traffic control, erosion control, and site cleanup. A pre-bid conference is scheduled for January 5, 2024, with sealed bids due by 2:50 PM on January 23, 2024. The contract will be awarded to the lowest qualified bidder, with 450 consecutive calendar days for substantial completion and 500 consecutive calendar days for final completion. Bidders must be pre-qualified under Gwinnett County's Annual Prequalification of Contractors program for the installation, replacement, and/or relocation of pressurized water mains and appurtenances between 16 and 24 inches in diameter.

This opportunity does not appear to include any set-aside designations or restrictions on the types of organizations that can respond. The incumbent contractor is not identified. The project is funded by Gwinnett County, and the recommended bid value is $7,946,625.00, though the exact budget range is not provided. Bidders are required to provide a 5% bid bond, and the successful contractor will be required to furnish a 100% performance bond and 100% payment bond.

Opportunity text

Installation of approximately 11,500 LF of 16-inch DIP water main along Buford Hwy between Old Peachtree Road and Sugarloaf Parkway. Includes branch connections and tie-in¿s, abandoning existing parallel cast iron water mains, service line reconnections, traffic control, erosion control and site clean-up, all other work required to complete the project.

Files

File Type Posted
BL006_24 Addendum No_ 1.pdf PDF
BL006_24 Award Notice.pdf PDF
BL006_24 Notice.pdf PDF