BL006-24, Buford Highway CIP Replacement - Section C
Solicitation number
PE-77023-NONST-2024-000000084
Issued by
Gwinnett County, Georgia

About this file

This document is an addendum to a state and local government solicitation for the Buford Highway CIP Replacement - Section C project. The project involves the installation of approximately 11,500 LF of 16-inch ductile iron water main along Buford Highway between Old Peachtree Road and Sugarloaf Parkway, including branch connections, tie-ins, abandoning existing parallel cast iron water mains, service line reconnections, traffic control, erosion control, and site cleanup. The addendum provides clarifications, modifications to the bid form and table of contents, and responses to various contractor questions regarding casing pipe sizes, fire hydrants, compaction testing, contractor sequencing, and other project details.

The addendum indicates that there is approved funding for this project, and award will be made to the lowest responsive and responsible bidder. It also notes that the county will provide construction inspection, while material testing will be performed by a firm selected by the county. The addendum addresses various contractor concerns related to weather delays, unsuitable soils, and sequencing, as well as provides details on the county's requirements for backfill compaction, valve exercising, and tree clearing.

View the file

Other files

File Type Posted
BL006_24 Award Notice.pdf PDF
BL006_24 Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

January 17, 2024

ADDENDUM NO. 1

BL006-24

BUFORD HIGHWAY CIP REPLACEMENT – SECTION C

The following addition/changes modify the Bid No. BL006-24 “Buford Highway CIP Replacement – Section C” Contract Documents, dated December 2023, as first advertised on December 13, 2023.

CLARIFICATION

The Barge Design Solutions contact listed in the advertisement for this project has been changed to:

Ashley Glass Ashley.glass@bargedesign.com

(615) 252-4365

Please note that the latest planholder’s list is also available via the Barge online plan room at bidding.bargedesign.com.

I. Modification

M1. REPLACE the Table of Contents found on page 5 of the frontend solicitation package with Attachment A1 Revised Table of Contents below.

M2. REPLACE Bid Form Page 20 with the replacement page attached to this Addendum (Attachment A5).

II. Questions

Q1.

A1.

Q2.

A2.

Q3.

A3.

What is the estimated construction budget?

There is approved funding for this project. Gwinnett County expects each contractor to bid a competitive price. Award will be made to the lowest responsive and responsible bidder.

Will zinc coated DIP and fittings be required in locations where pipe is polywrapped and double polywrapped? If so, will zinc coated DIP be included under bid item 25?

Zinc coated DIP is not required.

Can you please provide a list of the contractors that are prequalified for installation, replacement, and/or relocation of 16" to less than 24" pressurized water mains and appurtenances for this project? (Subsection 2) The referenced list of prequalified contractors is available on Gwinnett County’s Purchasing Department website at this address:

https://www.gwinnettcounty.com/static/upload/bid/780605/Pre-

Qualified%20Contractor%20List%20Pressurized%20Water%20Mains.pdf

BL006-24

Addendum No. 1

Q4.

A4.

Q5.

Please provide the pre-bid sign in sheet.

A5.

Please see attachment A2.

Q6.

Please provide a plan holders list.

A6.

Please see attachment A3.

Q7.

Per Gwinnett DWRs posted standard specifications: 3.6.5 RESILIENT SEATED GATE VALVES At the Contractor’s option, 12” and larger resilient seated gate valves conforming to AWWA C-509, may be substituted for 12” and larger butterfly valves. GCDWR shall be informed of the proposed substitution prior to installation. Will Resilient Wedge Gate Valves be an acceptable substitution for the 16” isolation valves for this project as has been indicated in the past?

A7.

Base bids on 16” butterfly valves as shown on the drawings and in the bid form.

Q8.

Will Resilient Wedge Gate Valves manufactured to the ANSI/AWWA C515-15 American Water Works Association standard for Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service be accepted for this project? This standard is an update to the referenced AWWA C509 standard for gate valves and has been approved/accepted for past projects by Gwinnett DWR.

A8.

Bids shall conform to 33 12 16.2.3 “Gate Valves”.

Per the project’s specifications: 2.2 HYDRANTS A. Fire hydrants shall be manufactured in full compliance with the American Water Works Association Standard for Dry - Barrel Fire Hydrants, C502-80, and as herein amended. Hydrants approved for use are American Flow Control B -62-B, M&H 129, Mueller IMP-PRT2, Clow Medallion, U.S. Metropolitan 250 M-94, or EJ 5CD250, or equal.

Would the utility accept either the American Flow Control B-62-B (highlighted above) or the American Flow Control B-84-B fire hydrant which adheres to all the standards and has been accepted and used by Gwinnett DWR in the past?

Fire hydrants manufacturer and model shall conform to 33 12 19.2.2.A.

There are several open cut steel casing pipe installations proposed across Buford Highway however several of the traffic control specifications and notes indicate only ½ of the roadway can be closed at a time without county approval. Will the County allow more than ½ the roadway to be closed if requested and approved by DOT? Will the County allow night work for these crossings and provide testing personnel at no cost to the contractor?

Base bids on maintaining ½ the road open at all times. Contractor requests for overtime work, including night work, will be considered on a case by case basis during the project, and shall be subject to the applicable requirements specified in Specification 01 00 00, Paragraph 3.23 “Overtime Work”.

Q9. Specification Section 01 00 00-16-3.44A (General Requirements: Work in Inclement Weather) states “The Contractor shall take into account historical weather conditions and potential difficulties that may be encountered for completing the Work demonstrated in the work schedule.

The contractor shall provide adequate protection against unfavorable weather to the satisfaction of GCDWR. Weather shall not be grounds for contract extension of available workdays unless, such should be most adverse, and reasonable effort to perform the Work is exercised, and affected construction activities lie on the critical path of the current, approved Project Progress Schedule.”

This statement indicates that only significant weather events would constitute a delay. However, ATSA standards do not allow for flagging operations to be permitted during low visibility or weather that would cause reduced traction. Will the County approve additional time extension for days where weather impacts the contractor’s ability to work within the ROW or conduct Single Lane Closure due to GDOT/ATSA Safety regulations.

A9. See General Conditions Section 12.02 “Change of Contract Times” and Section 12.03 “Delays”.

Q10. Specification Section 01 00 00-16-3.44A (General Requirements: Work in Inclement Weather) states “The Contractor shall take into account historical weather conditions and potential difficulties that may be encountered for completing the Work demonstrated in the work schedule.

The contractor shall provide adequate protection against unfavorable weather to the satisfaction of GCDWR. Weather shall not be grounds for contract extension of available workdays unless, such should be most adverse, and reasonable effort to perform the Work is exercised, and affected construction activities lie on the critical path of the current, approved Project Progress Schedule.”

This statement indicates that only significant weather events would constitute a delay. However, Specification Section 31 23 00-19-3.9.7 States backfilling shall not be performed in freezing weather (below 32 Degrees Fahrenheit) except by permission of GCDWR and shall not be done with frozen material or upon frozen material. Based on this backfill specification would freezing temperatures qualify for an extension of available workdays? Is it the intention of the County to not allow the contractor to backfill when air temperature is 32 degrees or less?

A10. See General Conditions Section 12.02 “Change of Contract Times” and Section 12.03 “Delays”.

Q11. Would a 24” Steel casing pipe be acceptable in lieu of the proposed 36” Steel casing pipe at the various open cut roadway and creek crossings on the project to reduce costs for the county?

A11 Casing sizes shall be bid based on the specified diameters. Contractor proposals to reduce the casing diameter and provide a cost deduction can be evaluated after Notice to Proceed is given by

GCDWR.

Q12. Will any additional permitting or easements be required for the existing line abandonment as the current LOD on the construction drawings does not encompass all of these areas? Is the contractor allowed to access all areas where line abandonment is to take place?

A12. No additional permitting or easements are required.

Q13. What firm will be providing the on-site inspectors for construction inspection and material testing throughout the construction phase of this scope of work?

A13. GCDWR has not yet selected the material testing firm. Construction inspection will be performed by GCDWR staff.

Q14. Specification Section 31 23 00 3.54C.1 states “All excavation is considered unclassified. Include all cost of rock excavation (Excavating, blasting, loading, hauling, crushing, backfilling, and/or disposing) in the lump sum or unit price bid amount for associated work”. While the Schedule of Values Bid item #3 for Rock Removal, there is no bid item to account for unsuitable soils within the excavation that would need to be replaced with stone or imported fill to provide adequate bedding. Will GCDWR provide an additional line item to bill for unsuitable soil or are we expected to carry the potential cost for this within other installation line items?

A14. See ODW Item 5 “Earth Excavation” in Part 2 of the Bid Form.

Q15. Have all valves for the existing water main been exercised to ensure they don’t delay contractors’ ability to facilitate the proposed commissioning of the new water and sequencing the abandonment of the existing line?

A15. Assume existing valves operate adequately for bidding purposes.

Q16. Specification Section 31 23 00 3.9C states the following regarding compaction testing requirements for Final Backfill in both paved and unpaved areas. “Final backfill under paved areas shall be placed in lifts not to exceed eight inches (8”) and shall be compacted to a density of not less than 95% of maximum dry density, as determined by Standard Proctor (ASTM D698). Final backfill in unpaved areas within road right-of-way shall be placed in lifts not to exceed eight inches (8”) and shall be compacted to a density of not less than 90% of maximum dry density, as determined by Standard Proctor (ASTM D698). Final backfills in unpaved areas outside of road right-of-way shall be placed in lifts not to exceed eight inches (8”) and shall be compacted to a density of not less than 85% of maximum dry density, as determined by Standard Proctor (ASTM D698). Final backfill material shall be free of clods, organic matter, rubbish, or other unsuitable material. Rocks larger than four inches (4”) in diameter must be placed to the sides of the trench.

Rocks larger than twelve inches (12”) are not allowed.” Will every 8” lift of our backfill operation in the final backfill zone of the trench be subject to the testing requirements listed or will this be selected randomly at the request of GCDWR’s material testing firm?

A16. The contractor is responsible for meeting or exceeding the contract compaction requirements regardless of the extents of compaction testing that is performed. Areas that fail compaction or areas that show settlement or trench failure after trench backfilling and/or pavement reconstruction shall be subject to re-excavation, re-compaction, and pavement restoration at the contractor’s sole cost.

Q17. Does GCDWR have any information regarding a preferred sequence, start locations, or critical tie-ins that the contractor should include in their proposed bid schedule to prevent any potential delays to the critical path of the project?

A17. The sequence of construction shall be reflected in the schedule submitted for GCDWR review and approval per Specification 01 00 00.1.6, Specification 01 11 00.1.2, and Specification 01 33 00.2.2.

GCDWR does not otherwise have further sequencing requirements.

Q18. Is GCDWR aware of any power line maintenance work to be completed prior to the potential start date of this project that would reduce the tree surgeon work required along the proposed alignment? Additionally, will GCDWR give any consideration to the addition of a clearing line item within the proposed Schedule of Values or should or are we expected to carry the cost for this within other installation line items?

A18. GCDWR has no information regarding power line maintenance work within the project limits.

Clearing is included in the unit price bid for the pipe installation per Specification 01 22 15.11, Paragraph 29.

Q19. Can Detail S1, General Note 49, Sheet G0.03 be provided?

A19. See attachment A4.

Q20. Is 2” Municipex allowed to be installed in lieu of 2” steel at STA 108+86?

A20. Bids shall be based on the material specified.

Q21. Is there a Bid Item #40 on the bid form?

A21. See attachment A5.

Q22. Can requirements/details for double poly-wrapped pipe be provided, i.e., color, V-Bio, etc. as shown on Sheet C1.13?

A22. Poly-wrapped pipe installation shall conform to Specification 33 11 13.05, Paragraph 2.H.2.

Q23. The contract drawings Show “Class ‘D’ Bedding and Initial Backfill detail (Sheet CD.01 Detail G3) will there be any other bedding classifications expected for this scope of work? If so, can GCDWR please provide any and all details of the expected backfill requirements for bidding purposes?

A23. Detail G3 governs installation outside roadway limits. See Details on Sheet CD.03 for paved area trenching and pavement restoration requirements that have been approved by GDOT.

III. Attachments A1. Revised Table of Contents, Page 5 A2. BL006-24 Pre-Bid Sign in Sheet.

A3. BL006-24 Plan Holders List.

A4. GCDWR Standard Detail S1.

A5. Replacement Bid Form Page 20.

Acknowledge receipt of this addendum on the firm information page of the request for proposal.

Sincerely, Brittany Bryant, CPPB Purchasing Associate III

TABLE OF CONTENTS

PAGE NO.

ITEM START

DEFINED TERMS

COPIES OF BID DOCUMENTS

QUALIFICATIONS OF BIDDERS

EXAMINATION OF BID DOCUMENTS AND SITE

ADDENDA AND INTERPRETATIONS

BID SECURITY

CONTRACT TIME

EXAMINATION OF BID PLANS AND SPECIFICATIONS

SOIL CONDITIONS

RIGHTS OF WAY/EASEMENTS

BID SCHEDULE

SUBCONTRACTORS, SUPPLIERS AND OTHERS

BID FORM

QUANTITIES OF WORK

SUBMISSION OF BIDS

MODIFICATION AND WITHDRAWAL OF BIDS

OPENING OF BIDS

BIDS TO REMAIN OPEN

AWARD OF CONTRACT

SUBMITTALS BY SUCCESSFUL BIDDER

BUSINESS LICENSE

TAXES

QUALIFICATIONS OF SURETY COMPANIES

EXECUTION OF WRITTEN CONTRACT

AREA OFFICE

PROTESTS

SOLID WASTE ORDINANCE

GENERAL CONTRACTORS LICENSE

NO COMMUNICATION POLICY

CODE OF ETHICS

BIDDER'S ACKNOWLEDGEMENT

BID FORM

CONTRACTOR AFFIDAVIT AND AGREEMENT

CODE OF ETHICS AFFIDAVIT

BIDDER'S AFFIDAVIT

FORM OF NON-COLLUSION AFFIDAVIT

BID BOND

PERFORMANCE BOND

PAYMENT BOND

INSURANCE REQUIREMENTS

EJCDC

1/16/24, 2:48 PM GCDWR - Buford Hwy Cast Iron Pipe Replacement Section C :: Plan Holders :: Barge Design Solutions Online Virtual Planroom https://bidding.bargedesign.com/jobs/8016/plan-holders/gcdwr-buford-hwy-cast-iron-pipe-replacement-section-c 1/1

GCDWR - Buford Hwy Cast Iron Pipe Replacement Section C Installation of approximately 11,500 LF of 16-inch DIP water main along Buford Hwy between Old Peachtree Road and Sugarloaf Parkway. Includes branch connections and tie-in’s, abandoning existing parallel cast iron water mains, service line reconnections, traffic control, erosion control and site clean up, all other work required to complete the project.

Plan Holders

Date Company Contact

12/15/23 8:58 am Cleary Construction 2006 Edmonton Road Thompkinsville, KY 42167

John Connelly

Tel: 2704871784 Fax: .

estimating@clearyconst.com

12/18/23 11:07 am Constructconnect 30 Technology Parkway South Suite 100 Norcross, GA 30092

Jemar Sagbigsal

Tel: 3236025079 content@constructconnect.com

1/4/24 6:41 am Dodge Data & Analytics 4300 Beltway Place Ste 150 Arlington, TX 76018

Elaine Wilson

Tel: 4135070211 Fax: 609-336-2767 elaine.wilson@construction.com

12/20/23 9:36 am Garney Construction 5895 Shiloh Road, Suite 114 Alpharetta, GA 30005

Terek Green

Tel: (470) 591-9942 terek.green@garney.com

12/15/23 6:26 am GS Construction, Inc Lyle Circle Lawrenceville, GA 30046

Hilary Croft

Tel: 6783778028 Fax: 6783778035 hquinn@gsconstruction.net

12/15/23 6:51 am JDS Inc.

272 Hurricane Shoals Rd. NE Lawrenceville, GA 30046

Melissa Montgomery

Tel: 6782445629 mmontgomery@jdspipe.com

12/19/23 3:39 pm The Dickerson Group 871 Old Peachtree Rd NW Lawrenceville, GA 30043

Michael Coats

Tel: 7705134558 michael.coats@dickersongroup.net

Project Manager

Director of Compliance

Project Specialist

Operation Manager mailto:estimating@clearyconst.com mailto:content@constructconnect.com mailto:elaine.wilson@construction.com mailto:terek.green@garney.com mailto:hquinn@gsconstruction.net mailto:mmontgomery@jdspipe.com mailto:michael.coats@dickersongroup.net

BID FORM

BID NUMBER: BL006-24

BID DATE: JANUARY 23, 2024

COMPANY NAME:

BIDDER’S SIGNATURE:

BID SCHEDULE CONTINUED

Bid Item No.

Spec. Section Description M&P* Estimated Quantity

Unit Price Extended Price

32 33 12 13 Water Service Short Side 33 15 EA $ $

33 33 12 13 Water Service Long Side 34 15 EA $ $

34 33 12 19 Fire Hydrant Assembly 36 29 EA $ $

35 33 12 19.81 Salvage Existing Fire Hydrant 39 17 EA $ $

36 34 41 16.10 Traffic Control Devices 44 1 LS $ $

37 34 41 16.10 Traffic Control – Police Officers 45 3,000 HR $65.00 $195,000.00

38 34 41 16.10 Variable Message Signs 46 60 DAY $ $

39 34 71 00 Driveway Cut Restoration 47 300 SY $ $

41 34 71 00 Guardrail Replacement S3 550 LF $ $

42 32 73 00 Wetlands, Stream Banks and Stream Buffer Restoration

51 1 LS $ $

43 31 23 00 Flowable Fill Trench Backfill S4 100 CY $ $

44 02 41 13.23 Abandon Existing Water Main with Flowable Fill

S5 500 CY $ $

PART 1 TOTAL $

PART 2 – OWNER DIRECTED WORK ITEMS

ODW1 02 32 19 Exploratory Excavations 2 50 EA $ $

ODW2 02 42 11 Debris Removal S6 25 EA $ $

ODW3 03 30 00

Cast-in-Place Concrete – Class A

4 150 CY $ $

ODW4 31 23 00 Additional Pipe Bedding 16 150 CY $ $

ODW5 31 23 00 Earth Excavation S7 1,500 CY $ $

ODW6 31 23 00 Crusher Run Backfill S8 150 TN $ $

ODW7 32 93 43 Tree Replacement 20 40 EA $ $

ODW8 33 11 13.05

Ductile Iron Pipe (Water) – 10-Inch

29 50 LF $ $

January 17, 2024 Addendum 1

Attachment A5