Bid 2025-08 Big Indian Creek at I-75 Sewer Upgrades

Closed State & local contract opportunity Posted

Solicitation number
PE-66243-NONST-2025-000000036
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Perry, Georgia is issuing an Invitation to Bid for the Big Indian Creek at I-75 Sewer Upgrades project. This project involves the installation of approximately 340 linear feet of 15-inch PVC gravity sewer, 100 linear feet of 15-inch PVC gravity sewer, 20 linear feet of 12-inch PVC gravity sewer, associated gravity sewer manholes, and connections to the existing sewer system. It also includes the jack and bore of Interstate 75 with 320 linear feet of 36-inch steel casing. The work must be completed within 90 consecutive calendar days for substantial completion and 120 consecutive calendar days for final completion from the Notice to Proceed. Bidders must have a valid Georgia Utility Contractor License and will be required to provide E-Verify documentation with their bid. Bids are due on September 24, 2024 at 10:00 a.m., and a non-mandatory pre-bid meeting will be held on September 5, 2024 at 10:00 a.m. The project will be awarded in one contract, and the City of Perry reserves the right to reject any or all bids.

The procurement does not appear to have any set-aside designations or restrictions on the types of organizations that can respond. The project will be managed by GWES, LLC, located in Perry, Georgia, but there is no information provided about any incumbent vendors or current contractors. The budget or award value for this project is also not specified.

Opportunity text

INVITATION TO BID PART 1: GENERAL 1.1 Competitive Cost Sealed Bids Separate sealed Bids for construction of Big Indian Creek at I-75 Sewer Upgrades for the City of Perry (Bid Number 2025-08) will be received until Tuesday, September 24, 2024 at 10:00 a.m. in the City Administration Building, 1211 Washington Street, Perry, GA 31069. Bids will then be publicly opened and read aloud at said office. Any bid received after Tuesday, September 24, 2024 at 10:00 a.m.will not be considered by the Owner. Following the closing time for the receipt of bids, no bid may be withdrawn for a period of sixty (60) days. 1.2 Scope of Work The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of 340 LF 15¿ RJ SDR26 PVC gravity sewer, 100 LF 15¿ SDR26 PVC gravity sewer, 20 LF 12¿ SDR26 PVC gravity sewer, associated gravity sewer manholes, and connections to the existing sewer system. The project also includes the jack and bore of Interstate 75 with 320 LF 36¿ steel casing. The time allotted for substantial completion of the work is 90 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 120 consecutive calendar days from the Notice to Proceed. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. 1.3 Plans, Specifications and Contract Documents Hard copies of the Instructions to Bidders, Bid Forms, Contract Agreement, Drawings, Specifications and forms of Bi

Files

File Type Posted
Bid 2025_08 _ Big Indian Creek at I_75 Sewer .pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors