Bethel Temple Well (W-21) Rehabilitation Project
Closed State & local contract opportunity
- Solicitation number
- 40945
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 54596 Water Well Drilling Equipment
- 72084 Water Well Accessories: Drive Points, Foot Valves And Strainers, Leather Cups, Sucker Rods, Well Cylinders, Etc.
- 72090 Well Pumps, All Kinds
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91360 Construction, Water System/Plants, Main And Service Line
- 91392 Maintenance And Repair, Water System, Main And Service Line
- 96292 Video Scanning Of Sewers, Water Wells, Etc.
- 96296 Well Services (Including Oil, Gas, And Water): Drilling, Plugging, Consulting, Maintenance, Repair, Etc.
- 968 Public Works And Related Services
- Point of contact
-
- Sarah Lee leesarah@saccounty.gov (916) 876-6287
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The Sacramento County Water Agency is seeking qualified contractors for the Bethel Temple Well (W-21) Rehabilitation Project, a comprehensive well maintenance and upgrade initiative located north of 2 Cadillac Drive in Sacramento, California. The project requires a General Engineering Contractor with a Class A, C57, or C61/D21 license to perform extensive well rehabilitation services, including downhole video surveys, gyroscopic surveys, air shocking, brushing, swabbing, airlifting, and bailing. Specific deliverables include potential repairs or replacements of critical well components such as spiders, water lube bearings, line shaft, column pipe, and sounding tube for an existing Goulds 12CMC pump with 1,000 GPM capacity. The bid submission deadline is May 5, 2022, at 2:00 PM, with electronic responses required through the Sacramento County Electronic Bidding Portal. Contractors must submit a bid guarantee of at least 10% of the total bid, provide a non-collusion declaration, and comply with California Department of Industrial Relations registration requirements. The project has a 30 working day completion timeframe, with liquidated damages of $1,200 per calendar day for delays.
The contract does not specify explicit set-aside designations or restrictions for disadvantaged enterprises. The estimated construction budget is $110,000, with an additional $20,000 allowance for unanticipated site conditions, bringing the total potential project value to approximately $130,000. Bidders will be required to provide payment and performance bonds for 100% of the contract price. The project involves rehabilitating an existing well with a total depth of 375 feet, and contractors must adhere to strict discharge permit requirements, including maintaining water turbidity below 100 NTUs. Discharged water will be subject to post-repair disinfection, flushing, and bacteria testing by the Sacramento County Water Agency. The project covers jurisdictions including Sacramento County and San Francisco City, with the work to be performed in strict conformance with specified regulations and permits from relevant regulatory agencies.
Opportunity text
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity